
Madras HC upholds Tamil Nadu's restrictions on real money games
The Madras High Court on Tuesday upheld the
Tamil Nadu online gaming authority
's restrictions on
real money games
, including a ban on gameplay between midnight and 5 am, and mandatory Aadhaar verification, rejecting legal challenges by gaming companies.
The development
follows a February petition
where companies challenged regulations that required mandatory KYC verification, Aadhaar authentication and restricted hours of gameplay.
These restrictions were imposed under Sections 5(2) and 14(1)(c) of the Tamil Nadu Prohibition of Online Gambling and Regulation of Online Games Act, 2022.
A division bench comprising Justices SM Subramaniam and K Rajasekar ruled that the State has the authority to make laws on online gaming under Entry 6 (public health and sanitation) and Entry 26 (trade and commerce within the State) of the State List in the Constitution, which covers matters exclusively under states' jurisdiction.
In their arguments, Head Digital Works Pvt. Ltd., which develops online games of skill in India, and two other gaming companies,
Junglee Games
India Pvt Ltd, and WinZO, insisted that the current restrictions based on time, age and monetary factors are unconstitutional.
Code of ethics and regulatory framework
Discover the stories of your interest
Blockchain
5 Stories
Cyber-safety
7 Stories
Fintech
9 Stories
E-comm
9 Stories
ML
8 Stories
Edtech
6 Stories
In March,
ET reported
that real money gaming industry bodies All India Gaming Federation (AIGF), E-Gaming Federation (EGF) and Federation of Indian fantasy Sports (FIFS), jointly came up with a 'code of ethics' encouraging responsible gaming practices.
The gaming industry bodies include companies such as Dream11, My11Circle, Khelo Fantasy Live, SG11 Fantasy, WinZO, Games24X7, Junglee Games etc. The code of ethics had provisions similar to the curbs placed by the Tamil Nadu government.
Under the new GST regime, the real-money gaming (RMG) industry faces a 28% GST levy on the deposits made by players on these platforms.
Last September
, India's top GST investigation agency, the Directorate General of GST Intelligence (DGGI), stated that the real money gaming sector topped the list of tax evasion, with dues to the tune of Rs 1.1 lakh crore. The agency issued show cause notices to 34 entities and took action against 118 Indian and 658 foreign companies.
Trends shaping the RMG sector
In FY22-23, India's largest RMG platform, Dream11, recorded gross gaming revenue of Rs 7,167 crore. Of this, Rs 976 crore was spent as promotional credits to players.
There are close to 568 million users of online games in India, and nearly 25% of them are pay-and-play customers. In fiscal year 2023, the RMG segment in online gaming was
estimated to be a $2 billion business.
According to the latest EY-FICCI report, Esports and casual gaming grew to Rs 5,300 crore in 2024, and is projected to reach Rs 6,300 crore in 2025 and Rs 8,300 crore in 2026.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Indian Express
35 minutes ago
- Indian Express
BMC extends deadline for waste bioremediation at Deonar for a third time
For the third time, the Brihanmumbai Municipal Corporation (BMC) has extended its deadline for the Rs 2,368 crore tender to appoint a contractor to carry out bioremediation of 185 lakh tonnes of waste and reclaim 110 hectare of land at the Deonar dumpsite over a period of three years. Bioremediation is a process involving treating garbage with the help of natural elements like air, sunlight, and microorganisms. Over time, as the biodegradable waste decomposes, the remaining non-biodegradable extracts are either recycled or treated artificially. The process of bioremediation is proposed at the Deonar dumpsite, which is among one of the sites that have been selected by the state government for constructing housing tenements for the Dharavi Redevelopment Project (DRP) – a venture steered by the Adani group and Maharashtra government's Slum Rehabilitation Authority (SRA). Earlier on May 14, the civic body had floated a tender inviting bidders to clear the Deonar dumpsite through bioremediation with a deadline of June 3, which was later extended to June 23 and further, revised to July 1. On Saturday, for the third time in a month, the BMC has again extended the deadline for the bidders to July 4. In the revised corrigendum, the civic body has revised the conditions, permitting a price escalation of five percent after 2 years. According to officials, the deadline has been revised owing to extension requested by bidders amid several concerns. For the record, at least 23 bidders had come forward and expressed interest during a pre-bid meeting convened earlier. 'Primarily, there are two major concerns which have been raised by the bidders. Firstly, the concerns pertain to the price as there was no provision for price escalation in the initial tender clause. Furthermore, many interested bidders had requested allocation of more time to collect and submit the documents. Another reason is the unique nature of the work stipulated in the tender, wherein nearly 2 crore metric tonnes of legacy waste has to be cleared over a period of three years,' said a civic official. 'This is our final corrigendum, following which no other extensions will be granted.' According to the civic data, of the 1.85 crore metric tonnes of waste which is currently stacked at the dumpsite, nearly 48 percent comprises construction debris, 41 percent is inert waste while 10 percent is accounted for by dry, miscellaneous waste.


India.com
43 minutes ago
- India.com
Tata Steel Gets GST Show-Cause Notice Over Alleged Rs 1,000 Crore Tax Credit Irregularity
Mumbai: Tata Steel on Sunday said it has received a show-cause-cum-demand notice from the tax department over an alleged irregular use of input tax credit worth over Rs 1,000 crore for the financial years 2018-19 to 2022-23. In a filing to the stock exchanges, the company said that the notice was issued by the Office of the Commissioner (Audit), Central Tax, Ranchi, on June 28. "On June 28, Tata Steel Limited received a Show Cause cum demand Notice dated June 27, issued by the Office of the Commissioner (Audit), Central Tax, Ranchi, proposing to disallow/demand primarily on account of alleged irregular availment of Input Tax Credit in contravention of the provisions of Section 74(1) of the Central Goods and Services Tax Act, 2017/State Goods and Services Act, 2017 read with Section 20 of the Integrated Goods and Services Tax Act, 2017, for the period FY2018-19 through FY2022-23," the firm said in its filing. The tax authority asked Tata Steel to explain, within 30 days, why the GST amounting to Rs 1,007.54 crore should not be demanded and recovered from the company. The explanation has to be submitted before the Additional or Joint Commissioner of Central GST & Central Excise in Jharkhand's Jamshedpur. According to the notice, Tata Steel allegedly claimed input tax credit in violation of the GST rules -- specifically Section 74(1) of the Central Goods and Services Tax Act, 2017, and Section 20 of the Integrated Goods and Services Tax Act, 2017. Tata Steel clarified that it has already paid Rs 514.19 crore as GST in the normal course of business. This amount is proposed to be adjusted in the notice, reducing the company's actual tax exposure to about Rs 493.35 crore. The company has said it believes the notice is without merit and will present its case before the authorities within the given deadline. Tata Steel also stated that this matter does not affect its financial, operational, or other business activities. Under the GST system, businesses can claim input tax credit on the taxes paid for purchases used in the production of goods or services. This credit helps in reducing their overall tax liability.


Indian Express
an hour ago
- Indian Express
Citizens' woes galore as Mumbai is set to vote in civic elections soon
After a delay of more than three years, Mumbai is finally set to vote in civic elections later this year or in early 2026. As new corporators are set to take guard in the Brihanmumbai Municipal Corporation (BMC) — the country's richest municipal body, several civic issues such as parking, walkability, water cut and waterlogging continue to plague the city. Over the past three years, the BMC had been under an administrator's rule, which essentially meant a top-down approach. However, whether it was the Mayor's rule or the administrator's, basic issues of citizens were overlooked. Here are some of the key issues faced by citizens: Non-uniform water supply Mumbai's water supply is dependent on seven lakes — Tulsi, Vihar, Tansa, Bhatsa, Upper Vaitarna, Middle Vaitarna and Modak Sagar. As the catchment areas of these lakes get filled during monsoon, the water is used throughout the year to cater to the city's requirements. According to BMC data, Mumbai's water demand is 4,250 million liters daily (MLD), while the civic body is able to supply only 3,800 MLD, leaving a deficit of 450 MLD. The civic body's record also shows that around 1,400 MLD or 34% of the water is lost due to leakage. This leads to multiple water cuts every year to balance water supply across the 24 municipal wards. 'In Mumbai, the BMC doesn't have a holistic plan to supply water. To ensure there is uniformity in supply, water cut is proposed every day and supply in certain areas is stopped to cater to demand in a different area,' former Congress corporator Asif Zakaria told the Indian Express. To augment its water supply, the BMC had floated a tender in 2023 to set up a desalination plant. However, the tender was scrapped after it failed to attract a certain number of bidders. The same tender was floated last month with certain changes and the BMC also mooted a proposal of setting up a dam at Gargai area in Palghar. However, as the project will require cutting of a large number of trees, it is awaiting green clearance from the government. 'In the past three years, there was an administrator's rule in the BMC that could have easily gone ahead with one of the proposals as they don't require political clearances from the committees which otherwise would have been there. Yet they have failed to show any results, meanwhile the issue of poor water supply continues to persist in the city,' Zakaria said. Pedestrian-unfriendly city In its 2025-26 budget, the BMC earmarked Rs 100 crore to upgrade walkability infrastructure in Mumbai. This was not the first time that the BMC announced its intention towards pedestrian infrastructure. In 2016, the BMC brought in a pedestrian-first policy, as part of which a 'safe school' project was implemented in 2020 with an objective to create pedestrian-friendly areas outside Mumbai schools by widening footpaths, improving road signages and limiting the driving speed. While the project was implemented outside schools in Worli and Byculla, it lost momentum after the body of elected representatives was dissolved in March 2022. Rishi Aggarwal, director of Mumbai Sustainability Centre and the Walking Project, said that the basic reason why these policies never get implemented on a large scale is because of lack of vision. 'The authorities need to come up with a holistic plan and stick to a deadline. All pedestrian zones should be reclaimed from hawkers, after which only walkability measures should be implemented,' Aggarwal told The Indian Express. Makarand Narwekar, former municipal corporator from Colaba, said, 'Bureaucrats often fail to understand the ground level issues. In the past few years, we have seen the administration spending exorbitant money on Mumbai Beautification Plan, which has little or no value in terms of civic upgradation. As former corporators, we have mooted multiple projects related to parking and walkability to the authorities, but getting them implemented was challenging,' Narwekar said. Flooding of subways The Andheri subway in the western suburbs gets submerged every monsoon. Last year, the subway was shut down at least 35 times between June and October. In 2023, it was shut down for at least 21 times during this period. Similarly, the Khar and Malad subway in the western suburbs also get shut during the monsoons, leading to traffic congestion. 'One of the major challenges that we (BMC) are facing to keep these particular points flood-free is the topography of the subways. These are watershed areas where the gradient is very steep and rain water gushes in at a very high speed. Therefore, unless any large scale structural intervention is done, it will continue to be a challenge to keep the subway flood-free,' a civic official told The Indian Express. The location of the subways are mostly saucer-shaped, which means the entry and exit point of the subway is elevated and has a slope like curvature due to which water from the adjoining areas travels down. Near the Andheri subway, the Mogra Nullah, which originates two kilometres away from it, passes downstream touching the subway. Whenever the nullah overflows, water enters the subway. Last year, the BMC had proposed a Rs 200-crore ambitious proposal to curb flooding at Andheri subway. The civic body's objective was to augment the existing drainage system to ensure that the water carrying capacity increases. The civic authorities had also planned an additional drainage line that would divert the flow of water in a separate direction towards the western side, eventually discharging the water to the nearby creek. 'During our feasibility study and estimation for the project, we found out that the carrying capacity of the drains could be increased to tackle an average rainfall of 55 mm. At present, the carrying capacity is just 20 mm and after the implementation of the proposed works, we would get only an additional cover of 35 mm of rainfall. Spending Rs 200 crore just to tackle 35 mm of rainfall will not be worth it and we had to cancel this project to chalk out a more feasible project,' an official said. Holistic parking policy Mumbai has the highest vehicle density among Metro cities. According to state government data, Mumbai's vehicle density is 2,300 cars per kilometre (km). The data also shows that the number has increased exponentially in the previous years. In 2019, the city's vehicle density was 1,840 per km, while in 2014, it was 1,150 per km. However, there is a dearth of parking spaces. In many cases, people park their vehicles on roads, leading to traffic congestion. The BMC also maintains its own street parking in areas such as Nariman Point and Colaba. The civic body's first parking policy was adapted in 2017 and was presented in the civic standing committee. Later, the BMC proposed the formulation of a Mumbai Parking Authority (MPA) in 2021, which will be an exclusive body to upgrade and regulate Mumbai's entire parking infrastructure. The proposal was then endorsed by former mayor Kishori Pednekar and the MPA was proposed to be incorporated in Mumbai's Municipal Corporation Act (MMC). However, four years since its inception, the project is yet to see the light of the day. According to a senior civic official privy to the development, the BMC had sent the proposal to the state government for approval and a decision is awaited. 'Since the project requires amendment of the MMC Act, it needs to be approved by the state government first as there is no elected representative in the civic body. The matter was sent to the state government in the last assembly session, however, they are awaiting clearances,' the official said. Bio-Medical Waste treatment facility Despite the Bombay High Court's (HC) order to relocate the city's bio medical waste treatment facility outside the city limits, the BMC continues to operate it at Govandi — one of the densely populated pockets in the eastern suburbs. A biomedical waste plant is a treatment facility that processes biological and medical waste. This plant has been operational since 2007-08 and is being maintained by the BMC through a private firm — SMS Envoclean Private Limited. The facility emits smoke after the waste items are processed in an incinerator. According to local residents, this smoke is one of the primary contributors to pollution in the area. Citizens and former elected representatives have been holding protests, urging the administration to relocate it. In October 2022, a plea was filed in the Bombay High Court (HC) by residents of Deonar, seeking immediate closure of the facility. The plea also sought penalty against the private contractor and shifting of at least half of the biomedical waste that at present is being received by Govandi plant to some other plant outside the city limits. Following this, the court sought replies and in its reply, SMS Envoclean Private Limited, had assured the HC that it will relocate the plant to a new site after obtaining necessary permissions within 13 months. In 2023, the HC directed the civic authorities to immediately relocate the plant. However, despite the court order, the plant continues to be operational at the same place. Speaking to The Indian Express, a representative of the SMS Envoclean said, 'The process of relocating the plant is underway. We are acquiring land at Taloja but some permissions are pending.' Meanwhile, a civic official said that unless the new plant is fully ready, the Govandi facility will continue to operate. 'In Mumbai, biological waste from all hospitals come to this facility. So if we stop this centre overnight, the city's entire medical system will collapse. We have to wait till the government sanctions all the relevant permissions for this project,' the official said.