
India completes 48 GW inter-state transmission network for renewable energy
solar and wind power
, while 159 GW is under construction, Parliament was informed on Monday.
A 340 Giga Watt (GW) Inter-State Transmission System (ISTS) network has been planned to evacuate 230 GW of solar and wind power connected to ISTS, Minister of State of Power Shripad Naik said in a reply to Rajya Sabha.
"As of now, out of the total planned capacity, 48 GW has been completed, 159 GW is under construction, 21 GW is under bidding, and 112 GW is under planning.
"Transmission schemes are approved by the Ministry of Power or the competent authority in line with the scheduled commissioning dates of renewable energy capacities," he said.
For
Intra-State Transmission System
(InSTS), the Minister said
Green Energy Corridor
(GEC)-I Scheme is under implementation in Karnataka, Madhya Pradesh, Rajasthan, Tamil Nadu, Andhra Pradesh, Gujarat, Himachal Pradesh, and Maharashtra with a cost of ₹10,141.68 crore.
The GEC-II scheme is under implementation in Gujarat, Himachal Pradesh, Karnataka, Kerala, Rajasthan, Tamil Nadu and Uttar Pradesh at a cost of ₹12,031.33 crore.
Further, the states have been advised to prepare respective plans for InSTS with a 10-year horizon, Naik said.
On power demand, the Minister said in June the peak demand touched the level of 2,43,118 MW and peak demand met was at 2,42,493 MW having a difference of 625 MW.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
17 hours ago
- Time of India
UAE: Ras Al Khaimah sees 654,000 visitors as tourism sector records best-ever H1, revenue up 9%
RAKTDA reports strongest-ever first half tourism results of 654,000 arrivals/Image: Shutterstock TL;DR: 654,000 visitors arrived in Ras Al Khaimah during H1 2025, a record high, up 6% year-on-year, with tourism revenues rising 9%. MICE and wedding tourism exploded by 36%, fueled by global events and destination weddings. Growth was driven by new direct flights (to markets like Romania, Poland, Uzbekistan, Belarus) and major hotel expansions like Fairmont, Four Seasons, Taj, and NH Collection. Ras Al Khaimah Tourism Development Authority (RAKTDA) announced a record-shattering figure of 654,000 visitor arrivals for the first half of 2025, marking a 6% increase from the same period in 2024. Tourism revenues surged by 9%, reflecting the success of strategy execution across connectivity, hospitality investment, and event programming. Growth drivers & market insights Connectivity enhancements significantly improved accessibility, with new direct flights operating from markets including Romania (+65%), Poland (+56%), Uzbekistan (+47%), and Belarus (+30%). Meanwhile, traditional markets such as India (+25%), China (+9.2%), Russia (+7%), and the UK (+5%) also delivered record-level visitor volumes as per WAM. Tourism segments & revenue growth A standout performer was the MICE and weddings segment, which saw a 36% revenue jump, thanks to tailored incentive programs and global event hosting. Ras Al Khaimah's growing reputation in business, incentive, and celebration tourism is now firmly established. Signature events included the RAK Half Marathon, UAE Tour Jebel Jais Stage, HIGHLANDER Hiking Challenge, and the inaugural Jais Ride cycling event. Hospitality expansion & infrastructure Supporting this surge, multiple high-profile hotel investments were announced. Major forthcoming projects include: Fairmont Al Marjan Island (250 keys) Four Seasons Resort at Mina Al Arab (150 rooms) Taj Wellington Mews Al Marjan Island (336 apartments) NH Collection Ras Al Khaimah (156 rooms) Additionally, the recent opening of Rove Al Marjan Island caters to mid-market beach tourism. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like 20 Legendary Cars from the Past Undo These developments align with RAKTDA's strategic plan to double hotel key count by 2030. Strategic partnerships & innovation RAKTDA formalised several destination-boosting MoUs: A collaboration with Fujairah Adventures enhances inter-Emirate travel itineraries. Alliances with leading Chinese OTAs ( etc.) and Saudi agencies are broadening market reach. Tech partnerships with Huawei and Open World anchor RAK's push into smart tourism and blockchain-enabled engagement platforms. Why it matters Ras Al Khaimah's H1 performance not only reinforces its upward trajectory in tourism but also underscores the effectiveness of its diversified strategy: Solid growth in visitor numbers and revenue benchmarks its standing among the UAE's fastest-growing tourism hubs. Dependable connectivity and hotel investment fuel long-term capacity and market appeal. MICE and destination events deliver premium economic value and global visibility. All of this supports RAKTDA's ambition to host 3.5 million visitors annually by 2030. The 654,000 visitor milestone for H1 2025 represents a defining moment for Ras Al Khaimah's tourism sector. With rising revenues, boosted infrastructure, and record-breaking events, the emirate is firmly establishing itself as a resilient, immersive, and internationally competitive destination. As hotel investments ramp up and connectivity strengthens, Ras Al Khaimah appears well-positioned to deliver on its Vision 2030 tourism goals. FAQ 1. How many visitors arrived in Ras Al Khaimah in H1 2025? 654,000, representing a 6% increase year-on-year. 2. How much did tourism revenue grow? Tourism revenue rose by 9% compared to H1 2024. 3. Which segments saw the strongest growth? The MICE and weddings sector saw a 36% increase in revenue, powered by conferences, events, and destination ceremonies. 4. Which markets contributed most strongly? Notable year-on-year increases came from Romania, Poland, Uzbekistan, Belarus, India, China, Russia, and the UK. 5. What is Ras Al Khaimah's annual tourism target? The aim is to reach 3.5 million visitors annually by 2030, supported by major hotel developments and enhanced air routes.


Hans India
a day ago
- Hans India
Medak selected for BEE's ADEETIE scheme for pharma
Hyderabad: In a significant move to strengthen India's MSME sector and promote sustainable industrial practices, the Ministry of Power has launched the Assistance in Deploying Energy Efficient Technologies in Industries and Establishments (ADEETIE) scheme, backed by a Rs 1,000-crore central budget. Launched nationally from Panipat, the scheme is being implemented by the Bureau of Energy Efficiency (BEE) and is designed to fast-track the adoption of advanced energy-efficient technologies in MSMEs—an economic backbone employing millions and driving innovation across sectors. BEE has selected 5 states for implementing ADEETIE scheme including Telangana to promote global energy efficiency technologies in pharma industry. Apart from Baddi, Madgaon, Ahmedabad and Bidar, Medak in the Telangana was selected under ADEETIE Scheme for Pharma. As part of the national rollout, BEE has appealed to all State Governments to take immediate and focused action in scaling up implementation of the ADEETIE scheme. States have been urged to engage their State Designated Agencies (SDAs) to proactively educate stakeholders, identify eligible clusters, and provide end-to-end support to MSMEs for seamless technology transition. The Ministry of Power has specially acknowledged the proactive role of states like Telangana, Andhra Pradesh, Kerala, Karnataka and Tamil Nadu, while calling upon all states to rise to the occasion and make ADEETIE a turning point in India's clean industrial growth. 'ADEETIE is a big boon to the MSME sector,' said Akash Tripathi, Additional Secretary, Ministry of Power and Director General, BEE. 'We urge all states to capitalize on this opportunity from the very beginning to ensure the scheme's success and maximize benefits for their industries.' Of the Rs 1,000-crore budget, Rs 875 crore is earmarked as interest subvention to ease access to concessional finance for energy-efficient upgrades, while Rs 50 crore is allocated for implementation and capacity-building. The initiative is expected to leverage total investments of over Rs 9,000 crore, including significant lending by MSMEs themselves. The scheme provides comprehensive support—from Investment Grade Energy Audits (IGEA) and Detailed Project Reports (DPRs) to financing assistance and Monitoring & Verification (M&V)—ensuring measurable energy savings, reduced costs, and enhanced productivity. MilindDeore, Secretary, BEE, emphasised the importance of state-level engagement: 'The role of SDAs is crucial in outreach, handholding, and scaling the scheme. By working closely with stakeholders, states can ensure their MSMEs become globally competitive and environmentally responsible.' ADEETIE is operational across 60 industrial clusters and 14 energy-intensive sectors, including textiles, foundries, and food processing, among others. A phased, cluster-specific approach is being adopted to tailor interventions and ensure measurable outcomes. The Centre sees this scheme as a pivotal tool not just for post-pandemic recovery, but for long-term sustainability, job creation, and achieving India's climate and net-zero goals.


Indian Express
a day ago
- Indian Express
ED took up 5,892 PMLA cases since 2015, got convictions of 15: Govt to Rajya Sabha
The Finance Ministry has informed Rajya Sabha that the Enforcement Directorate (ED) took up 5,892 cases under the Prevention of Money Laundering Act (PMLA) since 2015 and secured the conviction of 15 people from these cases during the period. Union Minister of State for Finance Pankaj Chaudhary said in a written reply: 'In these cases, 1,398 Prosecution Complaints (PCs), including 353 Supplementary PCs have been filed before the respective Special Courts under PMLA. Out of which, so far, the Special Courts have framed charges in 300 Prosecution Complaints including 66 Supplementary PCs and the PMLA Special Courts have convicted 15 persons in eight conviction orders in these cases till June 30.' The minister said that the ED has filed closure reports before the special PMLA court in 49 of the total cases. In an annual report 2024-25, ED Director Rahul Navin said: 'In the early years of administering PMLA, most cases pertained to drug-related offences. Till March 2014, only 1,883 Enforcement Case Information Reports (ECIRs) had been registered — averaging fewer than 200 annually — and just 84 Prosecution Complaints (PCs) were filed, with assets under attachment only Rs 5,171.32 crore.' 'Between April 2014 and March 2024, there has been a significant scale-up in enforcement activity, with 5,113 PMLA investigations initiated — averaging 511 ECIRs annually — and 1,332 PCs filed. I am pleased to report that building on this momentum, in FY- 2024-25, 775 new PMLA investigations were launched, 333 PCs were filed, and notably, 34 individuals were convicted,' he said.