
Bharat Gaurav train to cover Saptha Moksha Kshetra Yatra
According to ancient scriptures and Puranic legends, these destinations are deeply embedded in Sanatana Dharma symbolising a complete spiritual awakening including Ayodhya, Mathura, Kashi, Ujjain, Dwaraka, Gaya, and Matru Gaya.
The package will commence on September 9. This train facilitates tourists to board from Gudur, Nellore, Ongole, Chirala, Guntur, Miryalaguda, Nalgonda, Hyderabad, and Kazipet. The total duration of the tour package is 15 days.
This Special Tourist Train is well equipped with a variety of amenities, including PA systems for announcements onboard, dedicated coach security and tour managers, travel insurance, hotels, sightseeing and transfers, and unlimited South Indian meals onboard and off board. The tourists may carry only luggage needed for night stay or sightseeing that will make their journey hassle–free. The fares range from 3 AC (Comfort) Rs 45,750, 2 AC (Deluxe) Rs 54,100, and 1 AC (Luxury) Rs 69,500. Tourists can book only by contacting 93550 21516 and to book online they may visit www.tourtimes.in.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


News18
an hour ago
- News18
Uttarakhand Rain Havoc: Rockfall Damages Canopy On Haridwar-Dehradun Train Track, Services Suspended
Last Updated: In a statement, Himanshu Shekhar, CPRO, Northern Railways, confirmed that the damage is not major and that no loss of life has been reported Indian Railways suspended train operations on the Haridwar-Dehradun section in Uttarakhand on Tuesday evening after a large chunk of rock fell on the track canopy near tunnel T2. Speaking to News18, a ministry official said that the incident occurred around 6.45 pm in the single-line electrified section between Haridwar and Motichur, under the Moradabad Division. Motichur is about 50 km from Dehradun. 'The tunnel watchman reported the rockfall by phone at 6.45 pm to the Haridwar Station Master, following which engineering personnel, including the Assistant Divisional Engineer (ADEN) and Permanent Way Inspector (PWI), rushed to the site. The team reached the location by 7.30 pm to assess the damage," the official said. The rockfall damaged a canopy structure on one vertical support, prompting authorities to suspend train movement in the section as a precautionary measure. Senior divisional officers headed to the site. In a statement, Himanshu Shekhar, CPRO, Northern Railways, confirmed that the damage is not major and that no loss of life has been reported. Parts of Uttarakhand on Tuesday received massive rainfall, leading to reports of damage across the state. A massive mudslide caused by a cloudburst in Uttarkashi washed away high-altitude villages in Dharali. Four people were killed, and at least 130 people, who were initially feared trapped or missing, have been rescued. Several buildings, including 20 hotels, were washed away. The Indian Army has confirmed that nine soldiers are feared missing from a camp in the lower Harsil area. The India Meteorological Department has predicted heavy rainfall over Uttarakhand during the next three days. The state has been under heavy rainfall, with several people killed in the last two days. The Rudraprayag district also faced a landslide that buried two shops under boulders and debris falling from the hillside. A man was swept away by the strong currents of the Bhakhra stream near Haldwani on Monday. On Sunday, two people drowned in a swollen stream near Bhujiyaghat on Haldwani Road. view comments First Published: Disclaimer: Comments reflect users' views, not News18's. Please keep discussions respectful and constructive. Abusive, defamatory, or illegal comments will be removed. News18 may disable any comment at its discretion. By posting, you agree to our Terms of Use and Privacy Policy.


Time of India
2 hours ago
- Time of India
No reprieve for Himachal, heavy rain causes more landslides, flash floods
Kullu: Landslides and flash floods triggered by heavy rain caused havoc in Himachal Pradesh on Tuesday, blocking roads, disrupting water and power supply, and throwing life out of gear. In Kinnaur, the district administration suspended the annual Kinner Kailash pilgrimage due to inclement weather. In all, 446 roads were blocked in the state, including the Chandigarh-Manali highway, which was closed on Monday evening due to rockfall at several spots. It stayed closed in the morning due to landslides near Pandoh and Aut in Mandi district. In Thalout, a village near Pandoh in Mandi district, shops stayed closed due to the danger of landslides hitting their property. Thalout is located on the Chandigarh-Manali highway. Many areas and highway points near Mandi were submerged in the morning as the Suketi rivulet started overflowing. The rivulet and rainwater entered many houses and shops, as well as the highway and roads in Nagchala, Dadaur, Lunapani, Ratti, Gagal, and Behna. In Behna, many cars were submerged in the overflowing water. In Mandi town, where the Suketi rivulet merges into the Beas, water reached the steps of the ancient Panchvaktra temple. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Ranked: The Most Stunning Underrated Coastal Getaways in Europe Learn More Heavy rainfall also triggered landslides in Tarna, Mandi. In Gohar sub-division of Mandi, which was struck by cloudbursts on July 1, a flash flood damaged at least three houses in Lot village. Water level in the rivulets of Thunag, which was hit worst by the recent disaster, also started rising Monday evening. The Jyuni rivulet in Pandoh was also flowing above the danger mark. Many residents vacated their houses built on its bank. Mandi deputy commissioner Apoorv Devgan said due to heavy rain and landslides in the last 24 hours, extensive damage was caused to roads, drinking water and electricity supply, and other essential infrastructure. Devgan said the Mandi zone of public works department (PWD) alone reported an estimated loss of about Rs 23 crore, and the water department incurred a loss of Rs 31 crore in the last 24 hours. "All possible efforts are being made to restore road connectivity and water and electricity supply," said Devgan. Landslide threat in Banjar, Anni In Kullu, potential landslide threats are giving residents of many villages in the Banjar and Anni sub-divisions sleepless nights. A primary school in Baloo village of Anni sub-division was damaged in a landslide on Tuesday. The residents of Malana, which is presently cut off from the rest of the district, also worked on building a wooden bridge on Malana rivulet for the second day on Tuesday. The old bridge was washed away in a flash flood on July 1. Flash flood in Kinnaur too In Kinnaur, a flash flood in the Ribba rivulet blocked National Highway 5, and washed away agricultural land. NH 5 was also blocked at landslide-prone Nigulsari due to shooting stones. Flood gates opened, alert in Punjab, HP The flood gates of Pandoh dam and Koldam were opened on Tuesday, even as authorities had sounded an alert in advance for areas downstream. Kangra administration has already issued an alert in the downstream areas of Pong dam in the district and neighbouring Punjab after water level reached above 1,365 feet in the dam. Highway traffic diverted As roadblocks created a huge traffic jam on the Manali-Chandigarh highway, the administration diverted Kullu and Mandi-bound traffic through the alternate routes of Mandi-Kamand-Bajaura-Kullu and Pandoh-Gohar-Chailchowk-Sundernagar. However, only light vehicles were allowed to take these routes, and heavy vehicles stayed on the highway, which was not reopened until the filing of this report.


Time of India
2 hours ago
- Time of India
Karnataka bus strike leaves several long-distance commuters in lurch
Bengaluru: During the 10-hour shutdown, most districts bore the brunt of the transport strike, with Kalyana Karnataka region witnessing just 30% of services in operation. Or, two of three buses were not plying in large swathes of this cluster. Employees of state-owned road transport corporations launched an indefinite bus strike Tuesday, demanding payment of 38 months' pending arrears and a wage hike. The strike was subsequently suspended by late afternoon after the Karnataka high court stepped for the second time in 24 hours, this time, declaring the shutdown illegal and holding striking employees in contempt. The Majestic bus stand — the nerve centre for those travelling out of Bengaluru — wore a new look since early Tuesday: Private buses driving into bus bays, a no-go area otherwise. With KSRTC operating barely 58% of its fleet, passengers were stranded without access to long-distance buses. You Can Also Check: Bengaluru AQI | Weather in Bengaluru | Bank Holidays in Bengaluru | Public Holidays in Bengaluru To bail out the passengers, regional transport offices deployed maxicabs and private buses to help them reach their destinations. Many who reached the terminal unaware of the strike were left waiting for buses to Mangaluru, Shivamogga, Hassan, Hubballi, Davanagere and other destinations. Even those who booked tickets online faced difficulties. Prasad Kumar, a stranded passenger, said: "We booked tickets online to travel to Mangaluru, but received no cancellation message. We came to know about the non-availability of the bus only after arriving at the terminal. We had no option but to take a private bus." Fear of suspension? Employees fall in line Thousands of transport employees were caught in a pincer, with the govt and the high court calling the strike illegal and trade unions struggling to get the govt to blink on salary arrears and revision hanging fire for several years. HV Ananth Subba Rao, president of KSRTC Staff and Workers' Federation, alleged the state govt showed indifference to their long-pending demands. "For over a year, we have been demanding that the govt clear 38 months' arrears. The CM agreed to clearing just 14 months'. This is not acceptable," he said. Cash-strapped road transport corporations are estimated to require Rs 1,800 crore to clear the 38 months' arrears. Many drivers and conductors expressed frustration at the delay. Their query is simple and straight: If the state could spend Rs 13,000 crore on Shakti (free bus travel) scheme, couldn't it release Rs 1,800 crore to pay off arrears. "We worked day in and day out during the pandemic and after the Shakti scheme. It's distressing that our rightful arrears aren't paid," some of them said. A driver and a conductor on BMTC's Majestic-HAL route said: "I wanted to join the strike, but I was scared. In 2021, I was wrongly booked for protesting though I was home, unwell. I lost my job and stayed jobless for two years. With kids to raise and to pay Rs 12,000 rent, it was a struggle. I got my job back only because of a high court order. I do support the strike, but I can't state so openly. We're being made to report a day in advance to ensure we don't skip duty. We work just to survive — even that's being denied. Suspension is the biggest fear. What do we do if our only livelihood is taken away?" Another driver on Halasuru route said they were reporting to work out of respect for the court and fear (of losing the only job they have). "If we're not paid properly, how do we survive?" he asked. How BMTC ducked the strike blow With the dust of the 2021 strike refusing to die down, Tuesday's strike had minimal impact on BMTC's city operations, although services to the outskirts were affected. Four years ago, about 4,000 employees reportedly faced action for joining a strike. BMTC operated 1,500 electric buses managed by private operators. By 4pm when the strike was suspended, BMTC had completed 6,010 out of 6,014 schedules for the day, nearly netting a 100% rate. The bitter experience of the 15-day strike in April 2021 refuses to go away. A driver said: "Many employees spent 2-3 years without a job due to disciplinary action. They feared joining the strike (this time) would invite more trouble. Also, there's no unity among unions. They could have waited for a day — as per the court's order — for clarity. This strike didn't achieve any major goal." City bus services operated by the Bangalore Metropolitan Transport Corporation were partially affected during morning hours. According to BMTC officials, 3,040 out of 3,121 scheduled services were operational as of 9am. Services from Majestic bus stand, including most night-halt buses and general shift schedules, operated without any hitch.