&w=3840&q=100)
Southern Railway used faulty coaches in 2023 Nilgiri train: CAG flags risk
"Ministry of Railways may develop a robust mechanism for development of prototype coaches in consultation with RDSO and only after successful trial run, regular production of coaches should be started to avoid creation of ineffective and deficient coaches," the CAG said in its recommendations and observed that it didn't get any reply from the ministry on the said issue.
The full report contained 25 audit findings from various railway zones across the country and pointed out cases of undercharges or overpayments of Rs 543.17 crore.
One of the audit findings with regard to the Nilgiri Mountain Railway (NMR) under Southern Railways (SR) has not only pointed out financial deficiency worth Rs 27.91 crore but also highlighted how "Railway's improper decision which is in the nature of compromising the safety of the passengers by introducing the deficient coaches to serve as Special train without sanction of the Ministry of Railways, is also a serious lapse on the part of the Railways." The audit said that to replace the 100-year-old 28 coaches, operational between 45.88-km-long Mettupalayam and Udagamandalam stations, SR approached the Railway Ministry in May 2015 to advise Integral Coach Factory (ICF) to design and develop a prototype coach to suit NMR.
The ministry advised ICF in July 2015 to manufacture a prototype coach for NMR in consultation with Research, Design and Standards Organisation (RDSO), based on inputs given by SR.
ICF initially manufactured 15 coaches and delivered them to SR after which a trial run was conducted from Mettupalayam to Udagamandalam on April 2, 2019, with the first four coaches. The report noticed that the trial was not conducted on the section having a gradient.
"SR noticed (March 2020) that there was an increase in weight of the new coaches by around 5 tonnes each and advised ICF to reduce the weight in the remaining 13 coaches yet to be manufactured. However, no action was taken by ICF in this regard and 13 more NMR coaches were manufactured and delivered to SR in three lots," the report said.
It added that in all, 28 NMR coaches were manufactured by ICF and delivered to SR at a total cost of Rs 27.91 crore, but the freezing of the design, layouts and manufacturing of these coaches were done without any consultation with RDSO and also without ascertaining the manufacturing and successful trial of the prototype coach.
The report found that the SR modified six coaches, but even after modification, wheel slip in the locomotive was experienced during the trial run in the gradient section despite the weather being supportive with clear skies and dry weather.
"Despite deficiencies noticed in the trial run, SR introduced weekly special train services from 15/7/2023 between MTP (Mettupalayam) and UAM (Udagamandalam) with the newly manufactured NMR coaches which were put to use in the special trains. Presently (May 2024), 15 out of the total 28 new NMR coaches have been put to use for operation as weekly special trains without approval of the Railway Board," the CAG report said.
It added, "Thus, an imprudent decision was taken to manufacture 28 new NMR coaches without any consultation with RDSO and also without ascertaining the manufacturing and successful trial of the prototype coach despite clear instruction of MoR (July 2015)." The audit has stated that freezing the design and layout by SR and manufacturing the coaches by ICF without addressing the core issues of weight of the coaches and hauling capacity of the locomotive was also a premature decision, which was attributed to the manufacturing of these deficient coaches.
Hence, the coaches manufactured at a cost of 27.91 crore could not be put to effective use even after the lapse of more than three years of manufacturing, the audit report stated.
It has also expressed dissatisfaction with the response of the Southern Railways, which said that deficiencies noticed during the trial run were advised to ICF for rectification.
"As regards operation of new NMR coaches, it was stated that 18 coaches are being used in weekend/joyride special trains and further service will be improved once sanction is received from the Railway Board," the report said regarding SR responses.
"The reply of the SR Administration was not acceptable. Nothing has been stated in the reply regarding manufacturing of 28 new NMR coaches without any consultation with RDSO and also without ascertaining the manufacturing and successful trial of the prototype coach despite clear instruction of MoR," the audit said.
It added, "Further it is evident from the reply of the SR administration that the deficient coaches were put to use for operation without obtaining sanction from the Railway Board.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles

New Indian Express
an hour ago
- New Indian Express
India planted 1.78 lakh hectares under CAMPA in 2019-2023; gaps in fund use: Report
NEW DELHI: India raised 1,78,261 hectares of compensatory afforestation against a target of 2,09,297 hectares between 2019-20 and 2023-24, achieving 85 per cent of the planned area, the Supreme Court-mandated Central Empowered Committee has said in a report. The report filed earlier this month revealed that utilisation of funds under the Compensatory Afforestation Fund Management and Planning Authority (CAMPA) varies sharply across states. According to the report, Gujarat, Chandigarh, Mizoram and Madhya Pradesh recorded full achievement of their targets. Madhya Pradesh planted 21,746.82 hectares, fully achieving its target of 21,107.68 hectares. Karnataka also met nearly its entire target, covering 2,761.26 hectares against 2,775.12 hectares. Arunachal Pradesh planted 20,719.46 hectares against 21,478.03 hectares, achieving 96.6 per cent. Uttar Pradesh reported 96.4 per cent achievement, planting 5,877.16 hectares against 6,096.7 hectares. Assam covered 1,149.64 hectares against 1,191.82 hectares, achieving 93.8 per cent. Sikkim planted 609.52 hectares, achieving 92.3 per cent, while Punjab achieved 4,019.72 hectares against 4,471.94 hectares, about 89.9 per cent. In contrast, Meghalaya had one of the lowest coverage, achieving only 114.56 hectares against a target of 514.76 hectares or 22.3 per cent. Manipur planted 666.94 hectares against 1,759.84 hectares, achieving 37.9 per cent. Kerala covered 171.80 hectares against 433.06 hectares, achieving 39.7 per cent. West Bengal achieved only 748.25 hectares against 1,911.74 hectares, about 39.2 per cent. Tamil Nadu planted 84.76 hectares against 262.39 hectares, achieving 32.3 per cent. Andhra Pradesh reported 3,471.88 hectares against 8,663.46 hectares, covering only 40.1 per cent. The report also reviewed the use of CAMPA funds during this period. National CAMPA approved Rs 38,516 crore for state annual plans between 2019-20 and 2023-24. States released Rs 29,311 crore to their forest departments, of which Rs 26,001 crore was utilised. This means only 67.5 per cent of the approved outlay was spent. Utilisation varied widely, with Manipur, Andhra Pradesh and Arunachal Pradesh utilising 100 per cent, 100 per cent and 97.8 per cent of the funds released to them, respectively. Mizoram reported utilisation above 91 per cent, Sikkim 97.7 per cent, Karnataka 96.6 per cent and Odisha 87.9 per cent. Chhattisgarh recorded 95 per cent utilisation of the funds released, and Gujarat spent more than it released, utilising 116 per cent due to carryover balances.


Scroll.in
2 hours ago
- Scroll.in
RPSC AAE applications begins for 281 posts; here's apply link
The Rajasthan Public Service Commission (RPSC) has opened the online application window for recruitment to the posts of Assistant Agriculture Engineer - 2025 (Advt. 03/2025-26). Eligible candidates can register for the posts at or till August 26, 2025. The recruitment drive aims to fill 281 AAE posts. Applicants can check the eligibility criteria, age limit, pay scale, and other details available in the notification below: Assistant Agriculture Engineer - 2025 (Advt. 03/2025-26) notification. Application Fee Candidates from General/Unreserved categories will have to pay an examination fee of Rs 600 while SC/ST/OBC/PwBD and other reserved category candidates will pay Rs 400 at the time of application. Steps to register for AEE posts 2025
&w=3840&q=100)

Business Standard
2 hours ago
- Business Standard
India planted 178K hectares in 2019-2023; gaps in fund use: Report
India raised 1,78,261 hectares of compensatory afforestation against a target of 2,09,297 hectares between 2019-20 and 2023-24, achieving 85 per cent of the planned area, the Supreme Court-mandated Central Empowered Committee has said in a report. The report filed earlier this month revealed that utilisation of funds under the Compensatory Afforestation Fund Management and Planning Authority (CAMPA) varies sharply across states. According to the report, Gujarat, Chandigarh, Mizoram and Madhya Pradesh recorded full achievement of their targets. Madhya Pradesh planted 21,746.82 hectares, fully achieving its target of 21,107.68 hectares. Karnataka also met nearly its entire target, covering 2,761.26 hectares against 2,775.12 hectares. Arunachal Pradesh planted 20,719.46 hectares against 21,478.03 hectares, achieving 96.6 per cent. Uttar Pradesh reported 96.4 per cent achievement, planting 5,877.16 hectares against 6,096.7 hectares. Assam covered 1,149.64 hectares against 1,191.82 hectares, achieving 93.8 per cent. Sikkim planted 609.52 hectares, achieving 92.3 per cent, while Punjab achieved 4,019.72 hectares against 4,471.94 hectares, about 89.9 per cent. In contrast, Meghalaya had one of the lowest coverage, achieving only 114.56 hectares against a target of 514.76 hectares or 22.3 per cent. Manipur planted 666.94 hectares against 1,759.84 hectares, achieving 37.9 per cent. Kerala covered 171.80 hectares against 433.06 hectares, achieving 39.7 per cent. West Bengal achieved only 748.25 hectares against 1,911.74 hectares, about 39.2 per cent. Tamil Nadu planted 84.76 hectares against 262.39 hectares, achieving 32.3 per cent. Andhra Pradesh reported 3,471.88 hectares against 8,663.46 hectares, covering only 40.1 per cent. The report also reviewed the use of CAMPA funds during this period. National CAMPA approved Rs 38,516 crore for state annual plans between 2019-20 and 2023-24. States released Rs 29,311 crore to their forest departments, of which Rs 26,001 crore was utilised. This means only 67.5 per cent of the approved outlay was spent. Utilisation varied widely, with Manipur, Andhra Pradesh and Arunachal Pradesh utilising 100 per cent, 100 per cent and 97.8 per cent of the funds released to them, respectively. Mizoram reported utilisation above 91 per cent, Sikkim 97.7 per cent, Karnataka 96.6 per cent and Odisha 87.9 per cent. Chhattisgarh recorded 95 per cent utilisation of the funds released, and Gujarat spent more than it released, utilising 116 per cent due to carryover balances. Several states lagged behind. Tamil Nadu used only 67.9 per cent of the funds released, while Jammu and Kashmir spent 62.5 per cent. Haryana also underperformed, using 57.4 per cent. West Bengal spent 81.1 per cent and Delhi just 26.9 per cent, the lowest among all states. Telangana reported 60.4 per cent utilisation, and Andaman & Nicobar Islands spent 53.1 per cent of the released funds. The CEC said that "delays in submission of annual plans by states, late release of funds, and the lack of dedicated CAMPA offices affect seasonal forestry operations". Monitoring of survival rates remains weak, and multiple layers in the fund release process contribute to underutilisation, it said. Despite these shortcomings, it said progress under the statutory framework has been "significant" given initial difficulties, including disruptions caused by the COVID-19 pandemic. With thousands of hectares of natural forests lost each year to development projects, the report warns that gaps in plantation survival and underutilisation of funds undermine the very purpose of the CAMPA mechanism. The compensatory afforestation regime originated from a series of orders in the landmark TN Godavarman Thirumulpad vs Union of India case of 1995. In these orders, the Supreme Court mandated that when forest land is diverted for non-forest purposes, user agencies must provide funds to compensate for the loss through afforestation on non-forest land or degraded forest land. To formalise and regulate the management of these funds, Parliament enacted the Compensatory Afforestation Fund (CAF) Act, 2016. The Act established the National and State CAMPA to manage the money collected from user agencies. The CAF Rules, 2018, provided the framework for how these funds should be used. The Act and Rules specify that the money transferred to states and union territories can only be used for afforestation, regeneration of degraded forests, wildlife protection and other activities aimed at ecological restoration.