
28.8 mm rain floods homes, roads, hits traffic in Bengaluru
'These are low-lying areas and some houses were flooded. Steps are being taken to help the residents,' said an official. At East End in Jayanagar, a tree fell on a parked car and a jeep, damaging them. No injuries were reported.
Shajahan, a resident of Sai Layout, went ballistic against the BBMP, saying, 'Nearly 250 homes in the layout were affected. The ground floor of my house is flooded, and there is 2 feet of water inside my house. Last year, too, we faced a similar problem and I had to take up a rented house paying Rs 25,000 because of this issue. It has been recurring for the last 10 years, but no one has worked towards a solution.'
It was a hellish experience for motorists on roads. Kamesh, a resident of Balagere, said his car got stuck near Panathur S Cross in 2 feet of water and he had to push the vehicle with the help of his father.
BBMP Chief Commissioner Maheshwar Rao rushed to the control room at the BBMP head office and directed officials to clear stagnated water from roads, clear uprooted trees and coordinate with the traffic police. The traffic police sent out alerts about slow-moving traffic in several places. East End Road towards Mount Carmel School Road was temporarily closed as a tree fell on the stretch.
The upper ramp of Domlur flyover and many areas in Koramangala were waterlogged. Traffic was also slow near Manyata Tech Park.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
33 minutes ago
- Time of India
Newly constructed Bokaro railway stn leaks rainwater
1 2 Bokaro: The Bokaro Steel City railway station, currently being redeveloped under the Indian Railways' Amrit Bharat Station Scheme at an estimated cost of Rs 34 crore, has reported leaks following rain. Hyped as a future world-class station, the leaks in the newly constructed sections raised questions over construction quality. Adra railway division's divisional railway manager Sumit Narula on Monday was at the station for an on-ground inspection. While walking through platforms and building premises, he was taken aback to see rainwater dripping from multiple ceiling spots. Strict instructions were given to fix the issues immediately. TNN


News18
2 hours ago
- News18
Punjab minister reviews arrangements to deal with potential floods
Chandigarh, Jul 29 (PTI) Punjab Water Resources Minister Barinder Kumar Goyal on Tuesday reviewed the arrangements made by his department to deal with any potential floods. He said the government has completed the cleaning of the state's drainage systems and strengthened embankments to tackle any flood-like situation. Many parts of Punjab have received moderate to heavy rain in recent days. Goyal said the state government has completed 1,220 projects worth Rs 276 crore to tackle any potential flood situation. These include river revetment work, installation of studs, strengthening operations and desilting of drains. Additionally, 600 check dams have been constructed and 1,104 more are under construction. Besides, 3,905 soak pits are being created, over 53,400 bamboo saplings have been planted and 226 kilometres of vetiver grass has been cultivated. Vetiver grass is used for erosion control. Goyal said that out of the 850 drains, 601 required cleaning this year, which has been completed. So far, 4,766 kilometres of drains have been cleaned. Goyal said the Water Resources Department has implemented several strategic measures to handle emergencies, including the procurement of 8.76 lakh sandbags. Of these, 3.24 lakh sandbags have been filled and kept ready. For rapid response during emergencies, locations of sandbags have been uploaded onto the Geographic Information System (GIS), he said. For the first time, the minister said, the department has purchased 10,300 jumbo bags to enable quick breach filling. Goyal said water levels in all major dams in the state are within the safe limit and there is no cause for concern. The Bhakra dam currently stands at 1,618.38 feet, which corresponds to the average requirement of the past 20 years. The dam has a maximum capacity of 1,680 feet and is currently 47 feet below the 2023 flood level, he said. The Pong dam, which has a maximum capacity of 1,390 feet, stands at 1,346.15 feet — 30.78 feet lower than the 2023 flood level. The Ranjit Sagar dam, with a maximum capacity of 1,731.55 feet, currently stands at 1,664.72 feet — 5.49 feet below the 20-year average and 54 feet below the 2023 flood year level. PTI SUN DIV DIV view comments First Published: July 29, 2025, 22:30 IST Disclaimer: Comments reflect users' views, not News18's. Please keep discussions respectful and constructive. Abusive, defamatory, or illegal comments will be removed. News18 may disable any comment at its discretion. By posting, you agree to our Terms of Use and Privacy Policy.


Time of India
4 hours ago
- Time of India
Residents struggle as parts of city remain inundated
1 2 Patna: As downpour continued in Patna, several parts of the city remained inundated on Tuesday. Workers of the civic body were still pumping out the sewage-mixed rainwater from multiple affected areas, as residents waded through ankle to knee-deep water in areas like Patliputra Colony, Patel Nagar, Lohanipur, Kadamkuan, Rajbanshi Nagar, Digha, Danapur, Kankerbagh, Patna City and Phulwarisharif. Anuradha Jha, a resident of Gardanibagh, said the waterlogging situation in Gardanibagh Road number 1 remained the same since Monday. Aman Rajpur Singh said water entered houses in Bazaar Samiti area. "People have been living in waterlogged houses for the last 24 hours. There is no help till now," he said. Roshan Goswami, a resident of Danapur, said that the local residents have been facing waterlogging since Sunday night. "There are snakes in water. We are left with no groceries or vegetables. Dirty drain water have inundated our lane. I invested Rs 70,000 to make a small pathway, but the water crosses the line every year," he complained. Meanwhile, urban development and housing minister Jibesh Kumar, along with road construction minister Nitin Nabin, inspected different waterlogged areas. Patna municipal commissioner Animesh Parashar and mayor Sita Sahu also separately reviewed the situation. The urban development minister also held a review meeting regarding the drainage system in Patna with all MLAs from the region, MLCs, and senior officials from the department. Jibesh instructed the officials to ensure that water be pumped out from the affected areas by night. He directed the officials to use suction machines in low-lying areas to remove water and suggested bringing in more machines and pumps from nearby municipal bodies if needed. He also emphasised employing experts and engineers from other departments to ensure water is drained from all areas of the capital. The department's secretary, Abhay Kumar Singh, said that since Monday evening, 348 complaints were received on the helpline number concerned, all of which were resolved. "Patna recorded a total of 175.4 millimetres of rain in 12 hours from Sunday night to Monday morning. Water was drained from about 90% areas, but subsequent rainfall on Monday night and Tuesday morning led to waterlogging again," he said. Parashar said 19 QRT teams (at headquarters and zonal levels), along with the officials of Patna Municipal Corporation (PMC) and Buidco, were deployed across the city day and night. "The staff is monitoring the water level of sump houses in real time using walkie-talkies and with the help of CCTV cameras. Additional pumping machines have been deployed in all zones. The staff has been assigned duties in three shifts at sump houses, and the drainage system is being kept active," he said. There are 56 permanent sump houses in Patna and 36 temporary drainage pumping stations (DPS). A total of 364 pumps — 265 electric and 99 diesel sets — are being used this time. Of these, 256 pumps are installed at permanent DPS, and 83 at the temporary DPS. Meanwhile, a resident, Niranjan Paswan, asked why the PMC and Buidco did not use the same system to know in advance, how many drains are choked, how many drainage workers are deployed, and how many water entry-exit points are blocked by garbage. If the check is done regularly, it can drastically reduce waterlogging, he suggested.