logo
NHBRC to unveil critical report on structural integrity of mudslide-affected homes in Durban

NHBRC to unveil critical report on structural integrity of mudslide-affected homes in Durban

IOL News05-05-2025
Umlazi households to be relocated after devastating mudslides.
Image: Supplied
The National Builders Registration Council (NHBRC), an entity of the Department of Human Settlements, is expected to present its report on the structural integrity of all mudslide-affected houses in uMlazi, south of Durban.
Department of Human Settlements Minister Thembi Simelane said in a statement on Thursday that the report and geotechnical assessments of the area, expected in the next two weeks, would help determine the intervention required.
Noting the impact the recent rains have caused to several houses during her visit to the area earlier last week, Simelane directed the immediate evacuation of families whose houses had completely collapsed or had compromised structural integrity, thus posing a danger to occupants.
The DHS minister said while they awaited the report, she was encouraged by the speed and efficiency with which the three spheres of government, National and KZN Department of Human Settlements and eThekwini Municipality have responded to her recent call to evacuate victims of mudslides at uMlazi, H Section.
Over 50 families are being evacuated to Temporary Emergency Accommodation (TEA) as they have lost their houses.
'I am out of words to express our gratitude to families that opened their houses to accommodate affected families. This is who we are. We are a warm nation. A nation that extends a helping hand to those in need', Simelane said.
The recent rains led to mudslides and the destruction of about 56 houses, which prompted the Minister to direct that the most affected families be relocated within 48 hours.
As a long-term measure, the eThekwini Municipality and the Provincial Department of Human Settlements will identify a piece of land that will be utilised to accommodate the affected households with permanent settlement.
At the beginning of April, a blaze ripped through New Rest-Egoli informal settlement in the Western Cape, leaving scores of people homeless.
The Drakenstein Local Municipality has informed the National Department of Human Settlements that 200 informal structures might have been affected by the blaze.
However, the currently compiled list of people who have come forward has a total of 360 structures that have been affected. This was being verified by the two spheres of government.
At the end of March, the Eastern Cape Amatole District Municipality was hit by heavy storms which battered the area, leaving a tale of destruction to properties and infrastructure. This affected the three municipalities in the Amatole District, which include Great Kei, Raymond Mhlaba and Amahlathi Local Municipalities.
According to a preliminary report from the deployed teams, there was a need to relocate families whose mud houses collapsed during storms to Temporary Residential Units (TRUs) and provide building materials for the communities to rebuild their destroyed structures.
Marking three months as DHS Minister in March, Simelane pointed out that she had to respond to emergencies such as floods and fires in provinces such as the Western Cape and KwaZulu-Natal.
The department said this period has enabled the minister to fully understand the challenges faced by the sector.
These include budget cuts, poor contract management leading to the abandonment of housing projects, allegations of fraud and corruption, a trust deficit between the department and its stakeholders, distressed social housing projects, and finding permanent solutions to the country's informal settlements.
She said these challenges inform them that there is no silver bullet to resolve them.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Melmoth housing project finally making progress after decade-long delays
Melmoth housing project finally making progress after decade-long delays

IOL News

time5 days ago

  • IOL News

Melmoth housing project finally making progress after decade-long delays

SOME of the challenges that faced the decade-long delayed Thubalethu housing project in Melmoth was the hilly terrain where the houses are built. However, retaining walls were erected to mitigate against flooding THE Thubalethu housing project in Melmoth in the background with some of the water infrastructure built since the provincial government's intervention in the delayed project. KwaZulu-Natal Human Settlements MEC Siboniso Duma inspected progress of the project yesterday KWAZULU-NATAL Human Settlements MEC Siboniso Duma accompanied by the department's officials inspects the Thubalethu housing project in Melmoth which has faced decade-long delays THIS was how some of the houses for the Thubalethu housing project, in Melmoth looked like after vandalism, illegal occupation and delays before the provincial government had to step in. TRIBUNE REPORTER THE beneficiaries of a housing project in Northern KwaZulu-Natal have regained hope of occupying the houses that have remained unoccupied and incomplete for many years, with many being vandalised in the process due to delays and a plethora of other challenges. The R168 million Thubalethu housing project in Melmoth has been beset with challenges of delays, cost overruns, vandalism, illegal occupation, and lack of power and water supply since 2012, leaving many beneficiaries destitute and living in informal settlements. The project is a national government initiative under the Human Settlements' Breaking New Ground (BNG) programme and was meant to be an extension of Thubalethu township. The project was initially for 512 units, but the final number was adjusted to 751 due to the land's topography. A total of R168 million was allocated for the project. Yesterday, Human Settlements MEC for KwaZulu-Natal, Siboniso Duma, returned to the Thubalethu community to monitor progress on the project following an April 29 visit earlier this year, accompanied by the Human Settlements Minister Thembi Simelane, who both committed to seeing the project to its finality and exerted pressure for its speedy progress. 'We remain convinced that only hard work and commitment to serve the people will end the prolonged construction of houses in Thubalethu township."We want to ensure that there is no maladministration and that there is accountability for every cent spent,' said Duma yesterday when he undertook Operation Sukuma Sakhe Cabinet Day work in the township. He monitored and inspected the work involving the department, Mthonjaneni, and King Cetshwayo municipalities. The Human Settlements Department has made available R38.5 million for the construction of the retaining walls to mitigate against flooding. Some of the houses are in hilly terrain, which maximises the risk of flooding. R61 million has been provided for the installation of bulk water services, and another R19 million for the construction of water infrastructure in the area. There's also a plan to erect water tanks and upgrade sewer and septic tanks. One of the many challenges facing the project was plumbing and sanitation. In the early stages of the project, there were reports of political bickering between the Mthonjaneni Local Municipality and the King Cetshwayo District Municipality, which further complicated the project's progress. The provincial government had to step in to nip the bickering in the bud.

The Daily Lotto results for Tuesday, 22 July 2025
The Daily Lotto results for Tuesday, 22 July 2025

The South African

time22-07-2025

  • The South African

The Daily Lotto results for Tuesday, 22 July 2025

Get Ready for Today's Daily Lotto Draw! Could tonight be your lucky night? Good Luck! 🎉 Dreaming of a big win? The Daily Lotto jackpot is up for grabs, and it's estimated at a thrilling R550 000! ADVERTISEMENT The jackpot prize money is guaranteed to be given away even if no one matches all five numbers. All it takes is a ticket to turn your dreams into reality because as the saying goes, you've got to be in it to win it! 📢 Stay tuned! The winning numbers will be updated below as soon as they're drawn at or after 21:15. TUESDAY'S DAILY LOTTO NUMBERS WINNING NUMBERS 0, 0, 0, 0, 0 Draw date: 22 July 2025 Did you miss a draw and wonder if you won? ADVERTISEMENT Click here to view past Daily Lotto results and payouts. WHEN DOES THE DRAW TAKE PLACE? The Daily Lotto draws occur every day of the week, Monday to Sunday, around 21:30 (SA time). HOW TO BUY TICKETS Buy your tickets now at your nearest participating retailer, on our website by visiting national using your computer or mobile site, via the National Lottery Mobile App, or participating banks, namely FNB, ABSA, Nedbank, Standard Bank, Capitec, TymeBank and African Bank otherwise dial 1207529# for USSD. DID YOU KNOW Winners who win R50 000 and above receive free trauma counselling from professional psychologists and financial advice from accredited financial advisors absolutely free. At the same time, winnings are paid tax-free directly into the winner's accounts. WHEN DO LOTTERY TICKET SALES CLOSE? If you are buying tickets from a lottery outlet, they close at 20:30 on the day of a draw. ELIGIBILITY Players must be 18 years old. SUMMARY OF ALL LOTTERY GAMES Monday: Daily Lotto Daily Lotto Tuesday: Daily Lotto + PowerBall and PowerBall Plus Daily Lotto + PowerBall and PowerBall Plus Wednesday: Daily Lotto + Lotto, Lotto Plus 1 and Lotto Plus 2 Daily Lotto + Lotto, Lotto Plus 1 and Lotto Plus 2 Thursday: Daily Lotto Daily Lotto Friday: Daily Lotto + PowerBall and PowerBall Plus Daily Lotto + PowerBall and PowerBall Plus Saturday: Daily Lotto + Lotto, Lotto Plus 1 and Lotto Plus 2 Daily Lotto + Lotto, Lotto Plus 1 and Lotto Plus 2 Sunday: Daily Lotto For more details and to verify the winning numbers, visit the National Lottery website. You must always confirm the official winning numbers on the National Lottery website. We do our best to post the results as accurately as possible, but the National Lottery is the only source you can use to 100% verify the results. What's the first thing you'd do if you became a millionaire overnight? Let us know by leaving a comment below, or send a WhatsApp to 060 011 021 1 Subscribe to The South African website's newsletters and follow us on WhatsApp, Facebook, X and Bluesky for the latest news.

Toddler among two killed in Kennedy Road Settlement fire
Toddler among two killed in Kennedy Road Settlement fire

The Citizen

time19-07-2025

  • The Citizen

Toddler among two killed in Kennedy Road Settlement fire

Kennedy Road Informal Settlements face persistent challenges with fires and natural disasters. Bandile Zulu and Nonhle Mbango, victims of Kennedy Road Informal Settlements fire. Image: Collage/ SUpplied/ MEC for Transport and Human Settlements Siboniso Duma. A 19-month-old baby and a 25-year-old woman died in a devastating fire that swept through Kennedy Road Informal Settlements, destroying 122 shacks. According to officials, the blaze originated from a burning candle. The victims have been identified as Bandile Zulu, the 19-month-old baby, and Nonhle Mbango, 25, who had recently buried her father just weeks before the tragedy. Government response to Kennedy Road Informal Settlements fire KwaZulu-Natal MEC for Transport and Human Settlements Siboniso Duma said he engaged with Minister of Human Settlements Thembi Simelane to coordinate emergency assistance for affected families. 'We wish to report that a roving team involving officials from the national Department of Human Settlements, the provincial Department of Human Settlements, and the eThekwini Municipality is already working out a plan to speed up the delivery of building material,' Duma said. The MEC confirmed that officials from his office have already met with the bereaved families. 'We send our deepest condolences to Zulu and Mbango families. May the departed souls rest in peace,' he stated. According to Duma, relief efforts awaited the completion of verification processes by disaster management teams from eThekwini Municipality and the Department of Cooperative Governance and Traditional Affairs (Cogta). ALSO READ: 'His brother is not coming back': Heartbroken mother speaks after toddler dies in Pretoria tent fire Extended family notification Duma indicated that authorities are prioritising communication with extended family members in distant areas. 'At this stage, their focus is to ensure that extended families in Mount Frere and Umzimkhulu are properly informed about the tragedy,' he said. The MEC is working alongside Ward 25 Councillor Themba Mkhize to assist families with burial arrangements for their loved ones. Recurring disaster pattern and relocation challenges Kennedy Road Informal Settlements face persistent challenges with fires and natural disasters. 'Kennedy Road Informal Settlements are always affected by fires and natural disasters such as floods,' Duma noted. The MEC expressed concern about settlement patterns despite previous relocation efforts. Many residents who were originally relocated to alternative areas returned to the informal settlement. 'Critically, we remain worried about the fact that residents who originally lived there were relocated to the newly built houses in Waterloo and double-story homes just across Kennedy Road,' Duma stated. During a recent meeting with Minister Simelane and eThekwini Mayor Councillor Cyril Xaba, officials agreed on stronger enforcement measures. The leadership consensus focused on implementing bylaws to prevent people from reoccupying or renting shacks in the area. ALSO READ: Six-year-old Limpopo boy shot in the head by stray bullet Urban migration realities Despite enforcement challenges, Duma acknowledged the broader socio-economic factors driving the growth of informal settlements. People continue to migrate to eThekwini and other secondary cities in search of economic opportunities. 'These are realities that we are grappling with,' he said. MEC spokesperson Ndabezinhle Sibiya confirmed the government's multi-level response to the tragedy. The spokesperson emphasised that building material delivery plans are already underway, pending final verification by the disaster team. READ NEXT: George building collapse 'was entirely preventable' – report

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store