logo
Streetworks Start In Preparation For Te Ngākau Civic Precinct Reopening

Streetworks Start In Preparation For Te Ngākau Civic Precinct Reopening

Scoop2 days ago
As part of the Te Ngākau Civic Precinct project, coordinated streetworks are starting in the area in preparation for the reopening of the space in March 2026.
Te Ngākau, translated in te reo Māori as 'The Heart', is home to the capital's most important arts, cultural and performance venues. It also connects the central city and the waterfront, acting as a gateway to the harbour.
The scheduled streetworks are a coordinated approach of projects, maintenance and improvements to infrastructure by Wellington City Council, Wellington Water, and utility companies.
The combination of these different projects is likely to cause some disruption for Wellington residents, businesses and visitors during this period, but a coordinated approach will minimise the impact.
7 July - end of 2025 - Wellington Water - Wakefield Street rising main project
The section of Wakefield Street from Taranaki Street to Cuba Street will be one lane only (the westbound lane will remain open). Access for residents and businesses will remain.
14 July - 21 July 2025 - Wellington Water - Victoria Street rising main project
The intersection of Mercer St, Victoria St and Wakefield St will be closed to traffic. Pedestrian access will remain. There will be controlled vehicle access to garages on Victoria Street. Victoria Street traffic will be diverted down Harris Street to Jervois Quay.
Late July (Date TBC) - r emoval of Amora overbridge, Wakefield Street
To safely remove this bridge, the section of road underneath needs to be closed in both directions for 48 hours. This work is expected to take place on a weekend near the end of July, date will be confirmed soon.
August 2025 – January 2026 - Wellington Water - Market Lane pump station renewal Project
Market Lane will be closed to traffic at the Taranaki Street end and there will be a two-way entrance at the Cable Street end. Parallel parks along the southern side of Market Lane will be removed during this time. Pedestrian access will be unaffected.
Start of August - end of November 2025 - Wellington Water - Willeston Street pump station renewal and Victoria Street rising main project
The eastern lane of Victoria Street between Willeston Street and Harris Street will close to vehicles. The intersection of Willeston Street and Victoria Street will also be closed to vehicles, although the Victoria Street Wilson Parking Building will remain open. Pedestrian access will remain throughout.
Oct 2025 - Feb 2026 - Harris Street upgrade
Harris Street kerb and channel upgrade, along with landscaping and resurfacing. One-way eastbound vehicle access will remain during this time, and access to the Central Police Station will remain.
More information, downloadable maps and updates available at wellington.govt.nz/te-ngakau-streetworks
About Te Ngākau Civic Precinct
Te Ngākau Civic Precinct includes Te Whare Whakarauika Town Hall, Te Matapihi ki te Ao Nui Central Library, the site of the old Civic Administration Building (CAB) and Municipal Office Building (MOB), City Gallery, City to Sea Bridge, Michael Fowler Centre, former Capital E building, Civic Basement, Creche, Jack Ilott Green, and 110 Jervois Quay.
Te Ngākau is a place that Wellingtonians love, but it has been in a state of transition for a long time. The precinct was significantly impacted during the 2013 and 2016 earthquakes, resulting in seismic resilience issues for many of the buildings and structures. Some have been strengthened and redeveloped, some have been demolished to make way for new things, and the future of some is still to be decided. The area also faces challenges around resilience to future flooding events, which may become more frequent over time due to climate change and sea level rise.
Te Matapihi Central Library – practical completion Aug 2025, landscaping complete Oct 2025, opening March 2026
Te Whare Whakarauika Town Hall – project completion – July 2026 - reopening early 2027 TBD
City Gallery – project completion March 2026 - reopening August 2026 TBD
City to Sea Bridge – TBD pending judicial review outcome
Wellington Town Hall Annex development – September 2025 – July 2026
CAB site activation – July 2026 – Early 2027
Harris Street upgrade – construction from Oct 2025 to March 2026
Wakefield Street upgrade – construction April 2026 – October 2026 TBD
Civic basement strengthening and plaza landscaping – complete and open by March 2026.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Te Tai Tokerau Impact Fund Supports 15 More Regional Initiatives
Te Tai Tokerau Impact Fund Supports 15 More Regional Initiatives

Scoop

time10 hours ago

  • Scoop

Te Tai Tokerau Impact Fund Supports 15 More Regional Initiatives

The final round of the Te Tai Tokerau Impact Fund has been allocated, with 15 Northland-based projects receiving a combined $230,000 in support. The second round attracted 42 applications seeking over $700,000, highlighting strong demand for early-stage investment in community-led development. A third of the funded projects from the second round are Māori-led. 'The quality and ambition of projects coming through this fund has been very high,' says Vaughan Cooper, Head of Investment and Infrastructure at Northland Inc. 'From community wellbeing, promotion of our districts, and Mātauranga Māori, it's clear that Northlanders are ready to lead the change they want to see.' The Te Tai Tokerau Impact Fund is administered by Northland Inc and NorthChamber, with support from Transpower and Omexom. It was created to back community and kaupapa-driven projects that contribute to long-term regional resilience. Across two rounds, the fund has now distributed $430,000 to 32 projects throughout the region. Projects funded through the two rounds of allocations are already underway, with initiatives such as Girls Who Grow launching its climate-positive agriculture programme for young women into Taitokerau Northland, and the Kerikeri District Business Association and Bay of Islands Business Association rolling out a groundbreaking project focused on CCTV and community safety in the Mid and Far North. NorthChamber Chief Executive Leah McKerrow, who was part of the fund's decision-making panel, says the calibre of applications highlighted the region's determination and desire to make a difference. 'This fund gives communities the chance to lift up great ideas and turn them into action. The panel was keen to support those ideas that will make a tangible and far reaching impact. It's positive to see the difference this funding is already making on the ground in Te Tai Tokerau.' Transpower's Executive General Manager Customer and External Affairs Raewyn Moss supported this view. 'We are so pleased to see this funding empowering real opportunities for development, community-building and increased resilience across Taitokerau Northland. We look forward to the stories of the impact the funding has and the achievements from the initiatives that were successful in this funding round.'

Rates rises are due to people voting against rates rises
Rates rises are due to people voting against rates rises

The Spinoff

time17 hours ago

  • The Spinoff

Rates rises are due to people voting against rates rises

We ignored our crumbling infrastructure for decades. But having to pay to fix it made people mad. Now it's time to ignore our crumbling infrastructure for decades again. Nicola Willis didn't muck around with niceties when asked to justify the government's plans to cap council rates rises on RNZ. 'Councils don't always do a great job of spending your money like you would spend it. There are wasteful projects – there is evidence of that,' the finance minister said, before ending with a devastating own. 'There will be pushback because when you take candy away from kids in a candy store, they don't really like it. But at the same time, we are on the side of ratepayers.' In other words, we're doing this for the people who think councils are pissing their hard-earned cash up against a gold-plated bike lane. Willis is far from alone in her sentiments. Calling local government wasteful and profligate is reliable go-to if you want to lure spittle-flecked callers to a talkback station or red-faced men to the local Facebook community page. It's been at the heart of hundreds of mayoral campaigns. Recently Ray Chung has tried harnessing the anger, launching a campaign for the Wellington mayoralty centred around a pledge to freeze rates for three years by scrapping 'wasteful projects' and spending smarter. But when you ask for specific examples from these waste disposers, many of them start to founder. Questioned by RNZ's Corin Dann on what he'd cut to make up for the revenue loss caused by his rate freeze, Chung pointed to the council's ballooning staff numbers. 'Our staff numbers have just gone up exponentially and really, I have no idea what a lot of these people do,' he said. Dann moved on, but RNZ went back to fact-check later. It found staff numbers had been mostly static at Wellington City Council for several years, and actually went down in 2024. This is a common theme. The Post has run stories freaking people out about the cost of Wellington's new bike network. Newstalk ZB's Heather du Plessis-Allan has criticised it for spending on a bike lane in Karori, and has repeatedly brought up a single $84,000 bike rack. Wellington council could get rid of everything they're complaining about and still not save the average ratepayer enough for a single extra bag of sour coke lollies per annum. Cycling spending, including pedestrian and bus improvements, accounts for 1% of its investment over the next 10 years, and 0.17% of its recent 17% rates rises, or roughly 72c per ratepayer. The primary culprit for Wellington's rates rise is less wasteful spending and more a long-shirked repair bill. Politicians put off investment in Wellington's pipe network for decades, until eventually it started alternating between leaking and spraying human excrement on passersby. Thanks to her tightwad predecessors, the current mayor Tory Whanau has had to spend tens of millions of dollars to stop the citizens of our nation's capital being drowned in a huge poonami. It's the same story almost everywhere. Councils have underinvested in core services for decades in an effort to keep rates artificially low for the Willises and du Plessis-Allans of the world. Local government rates, as a percentage of the economy, have stayed relatively static for more than 100 years, while central government tax has grown from under 10% to more than 30% in the same time. Meanwhile, pipes, roads, and public buildings have been left to decay. Now the bill has come due. Just fixing the nation's water infrastructure is estimated to cost between $120 and $185 billion over the next 30 years. Council balance sheets are already groaning under the strain. When Auckland councillor Richard Hills first got voted in eight years ago, Watercare's annual budget was $250 million. It's now $1.3 billion. Ten-year transport spending was $20 billion. It's now $63 billion, most of which goes to roads and public transport. As this is happening, the same ratepayers and politicians that benefitted from burying their heads in the sand are complaining they're going to have to pick up some of the tab they've been running up for decades. Local government NZ chairman Sam Broughton describes a kind of doom spiral, where politicians who are upfront about the costs facing council get voted out by the people who want to keep kicking the can down the road, preferably until after they're dead and it's someone else's problem to deal with. 'And so then someone saying 'we're going to keep rates low' gets elected, and you just end up going round and round without dealing with the real issue, which is basic infrastructure needs to be invested in.' The best argument against councils isn't that they're spending too much; it's the opposite. They've failed to provide necessary infrastructure and housing growth for at least the last 50 years, in deference to an ill-informed, unrepresentative voter base that still complains their undercooked investment plans are extravagant. Now, as the pipes spit poo particles, they're having to play catch up. But delaying investment is like not going to the doctor to check your weird-looking mole. The cost, when it arrives, is far greater. It's making the people who've always been mad at spending even more mad. They're talking to National MPs. They're heading to the polls in October. Buckle up, we've got another bill to pass on to the next generation.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store