
ISRO launches Indo-us unique earth observing mission NISAR into space
This is the first collaborative mission between ISRO and NASA – costing $1.5 billion and with a mission life of five years – in which the unique satellite's dual-band Synthetic Aperture Radar (SAR) will employ advanced, novel SweepSAR technique, to provide high-resolution and large swath imagery. The 2,393-kg NISAR satellite will image the global land and ice-covered surfaces, including islands, sea ice and selected oceans every 12 days.
The lift-off of the 51.7-metre-tall GSLV F-16, carrying the 2,393-kg NISAR satellite, took place at the end of a 27.30-hour countdown from SDSC-SHAR's second launch. Precisely 19 minutes after lift-off, ISRO's launcher GSLV F-16 injected NISAR into a Sun Synchronous Polar Orbit (SSPO) at an orbit altitude of 747 km – the first time that ISRO's GSLV (Geostationary Satellite Launch Vehicle) has placed a satellite in a sun-synchronous orbit, as all earlier GSLV launches had placed satellites in Geosynchronous Transfer Orbit (GTO). ISRO Chairman and Secretary, Department of Space, V Narayanan, said after the successful launch and satellite's orbital insertion, 'All the vehicle system performances were quite normal as expected and as predicted. Today, we achieved the intended orbit. Actually, we have got an orbit with a dispersion (deviation from desired orbit) of less than 3 km, as against the permissible level of 20 km... all parameters are as expected.' He added that GSLV F-16's cryogenic upper stage corrections and a host of mission simulations were carried out very systematically and meticulously.
Chaitra Rao, Project Spacecraft Director, NISAR, said that as per schedule, NISAR's solar panels were deployed and the satellite was appropriately titled. The first 90 days of the mission will be dedicated to commissioning, or In-Orbit Checkout (IOC), to prepare NISAR for science operations. Commissioning is divided into sub-phases of initial checks and calibrations of mainframe elements followed by NASA's Jet Propulsion Laboratory (JPL) engineering payload and instrument checkout.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


News18
16 minutes ago
- News18
What is 3I/ATLAS? All You Need to Know about the Interstellar Object
NASA confirms discovery of 3I/ATLAS, a rare interstellar object passing through our solar system. Know all about it:


Time of India
an hour ago
- Time of India
Isro, Bengaluru firm start 10-day analogue mission in Ladakh from today
BENGALURU: On a cold, wind-brushed outpost at 14,000 feet in Ladakh, two hand-picked analogue crew will begin living in isolation to simulate the physiological and psychological effects of a space mission starting Friday (August 1). Tired of too many ads? go ad free now The analogue mission is being conducted by Isro at a facility — Himalayan Outpost for Planetary Exploration (HOPE) — established at Tso Kar, Ladakh, by Bengaluru-based firm Protoplanet . It was formally inaugurated by Isro chairman V Narayanan on Thursday. The two analogue crew, Rahul Mogalapalli, a PhD researcher at Purdue University, and Yaman Akot, a planetary science graduate from the University of Aberdeen, were selected from 135 applicants based on Isro guidelines. The high-altitude site, selected for its terrain similarities to the Moon and Mars, will be the setting for a 10-day human isolation experiment, designed to test and refine protocols for long-duration spaceflight. Protoplanet's initiative has backing from the Mars Society and Mars Society Australia, which have pioneered similar analogue stations in Arctic and desert regions. The station was established in collaboration with multiple institutions, with Mahindra providing ground logistics and mobility support for this inaugural mission. Both candidates have prior experience in confined habitat simulations and underwent comprehensive medical, psychological, and physical fitness assessments before being shortlisted. A 15-day pre-mission training phase was completed at lower altitudes before deployment to HOPE. The core of the study involves monitoring genetic and psychosocial changes under high-altitude stress. Scientists will track biological markers before, during, and after the mission, collecting blood, stool, and urine samples to understand what are known as 'omics' responses. Tired of too many ads? go ad free now These include genomics, proteomics, and metabolomics markers triggered by high-altitude stress, confinement, and group dynamics. Isro will also monitor psychological stress indicators such as sleep cycles, decision-making ability, mood variations, and social interaction under prolonged confinement. The aim is to better understand how such extreme environments influence human behaviour and biology over time. The effort is part of Isro's broader and long-term ambitions for lunar and planetary crewed missions. Though the current mission is led by Isro's Human Space Flight Centre, Protoplanet will continue to operate the HOPE station for future missions, inviting private firms, academic institutions, and sector experts to participate in joint studies. The semi-permanent structure is modular and dismantlable, allowing it to be reused and adapted for different mission formats. Officials said more detailed analogue simulations in other parts of the Himalayas and elsewhere in India are being planned. These are expected to test other critical aspects of future crewed missions, including surface mobility, habitat design, and life support systems. Further results from the ongoing mission and future phases are expected to be announced later in the year.


The Hindu
8 hours ago
- The Hindu
New phase: On the NISAR mission
The GSLV-F16 mission lifted off from Sriharikota on July 30, placing the NASA ISRO Synthetic Aperture Radar (NISAR) satellite into a sun synchronous orbit. The ascent capped a decade-long bilateral effort and opened a new phase in global earth observation cooperation. NISAR is a 2.8-tonne observatory that combines a NASA-built L-band radar with an ISRO-made S-band radar — also a first. They allow NISAR to detect surface changes measuring only a few centimetres, even through clouds and vegetation. NISAR will supply freely accessible data on ground deformation, glacier flow, biomass, land use changes, and sea ice dynamics. As its dawn-dusk orbit repeats every 12 days, its radars will be able to revisit the same point under nearly identical lighting conditions. This geometry, coupled with a duty cycle exceeding 50% in the L-band, has been designed to yield closely spaced time series observations that can quantify geological processes. Indeed, its various engineering firsts lead up to NISAR's unusually broad science agenda: map mangrove extent, urban subsidence, crop-soil interactions, and calving rates in polar ice shelves in a single orbital cycle. Its data could help support the Sendai Framework on reducing disaster risk and refine IPCC models. For ISRO, flying a flagship payload on the GSLV Mk II rocket is notable for a vehicle once dubbed 'naughty boy' for its early-career setbacks. The ISRO-NASA partnership would also have eased technology transfer between the two countries. Developing the S-band radar would have demanded tighter tolerances in radiofrequency electronics, thermal stability, and data throughput than previous Indian satellites. From a diplomatic standpoint, the launch confirms that India can be trusted with high-value hardware and demanding integration schedules, although it is still learning to shape joint missions on equal terms. The 12-metre reflector, the Ka band downlink, and much of the flight software stack were imported, and the key design reviews were led by NASA. Achieving parity will require larger domestic investments in advanced materials, deep-space communications, and systems engineering plus earlier Indian involvement in framing the scientific agenda of future multilateral missions. NISAR's data downlink rate also presents a challenge. ISRO must expand its Ka-band ground network, automate cloud-based processing, and release analysis-ready products within hours if state agencies are to make timely use of the data. Sustaining the time-wise data will also depend on authorising follow-on SAR spacecraft before 2030 and finalising data-sharing rules that encourage private analytics while protecting sensitive scenes. Addressing these gaps will determine how fully NISAR's potential is realised in India.