
Missisaugas of the Credit First Nation working with Therme on Ontario Place designs
Chief Claire Sault said the MCFN has been integrated "every step of the way" by Therme Canada, from the design process to plans for ongoing stewardship. Therme has a 95-year lease to build a destination spa and indoor water park on the west island of Ontario Place, the provincially-owned site on the city's lakeshore which is located within MCFN's treaty territory.
"I want us to have a footprint in our treaty area, to educate the public," Sault said. "I want our stories to be told."
She said the nation's knowledge keepers and staff have provided Therme input on ecological and environmental concerns raised by advocacy groups and some politicians.
As part of the consultation process, she said Therme reintroduced a certain species of fish, which she did not name, and added native plants to the area.
The nation also only agreed to the removal of over 800 trees on the site after Therme committed to restoring the greenery "above and beyond what's being taken out," she said.
Sault said she and some council members had met with "naysayers" about the project, though she didn't name them.
In those conversations, she said members of the nation explained "the long history of not having economic reconciliation" and MCFN's involvement in environmental issues related to the redevelopment.
Economic reconciliation refers in part to providing Indigenous communities with equitable access to opportunities for economic development, according to the federal government's website.
Sault said there will be opportunities for MCFN to secure contracts with Therme, such as for landscaping work on the site.
"My hope is that we continue down that path of building good relations, hearing difficult things when we need to or difficult feedback when we need to," she said.
"We're very open to that, but our elders always remind us to stay the course."
Development has faced criticism
Therme's plan for the west island has drawn considerable criticism.
Premier Doug Ford said in April that he was "very satisfied" with Ontario's deal with Therme, despite allegations first published by the New York TImes that Therme exaggerated its credentials in its pitch.
Critics react to allegations that Therme misrepresented itself to get Ontario Place deal
3 months ago
Duration 2:40
Ontario's government plan to build a luxury spa on the former site of Ontario Place is under the microscope again after allegations that Therme falsely presented itself to secure the 95-year deal. CBC's Shawn Jeffords has the story.
That report came after Ontario's auditor general criticized the provincial government's handling of the redevelopment in December, saying the bidding process was not "fair, transparent or accountable."
In her report, Shelley Spence said the redevelopment will likely cost the public purse roughly $2.24 billion — ballooning by more than $1.8 billion compared to projections in 2019.
Among environmental concerns about the redevelopment, local politicians and waterfront users have said the province's sewage plan for Ontario Place could pollute the West Channel.
But Sault said the MCFN will continue to follow its natural laws as the partnership with Therme moves forward.
"We're definitely committed to being good neighbours and continuing to be good neighbours to all of our treaty areas," she said. "That's not going to change."
Pavilion designs reflect MCFN storytelling
The property will include a public park featuring cultural elements of the MCFN, said Terence Radford, a partner at Trophic Design, a landscape architecture firm.
He said the site will also feature prominent use of Anishinaabemowin, allowing not only the general public to engage with the language, "but also Indigenous youth … that are living in the City of Toronto that maybe haven't had an opportunity to engage with elders or knowledge keepers to experience and engage with their language."
The property will feature an east and west pavilion that can be used as performance and event spaces, Radford said.
The pavilions draw on storytelling from MCFN elders, knowledge keepers and community members, he said. The structural designs are informed by the seasonal cycles, the calendar, the relationship to the turtle and star teachings, he said.
Design renderings for the west pavilion shows a turtle pattern embedded in its structure. Meanwhile, the east pavilion will include a viewing point to see particular constellations during the winter solstice, Radford said.
Plans also include sound and video installations within the pavilions to support an "ongoing relationship" with MCFN artists and storytellers, he said.
The redevelopment will also have two plazas. The South Shore Plaza will include artwork by an MCFN artist that tells the story of the Three Fires Confederacy, an alliance between the Potawatomi, Odawa and Ojibwe nations, renderings show.
While Toronto has visible cultural districts like Chinatown and Greektown, Radford said Indigenous people have been "largely invisible" in the city's building practices.
Involving MCFN in projects such as this one will help educate residents about the land that they live on, he said.
The redevelopment is set to be completed by 2029.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Globe and Mail
an hour ago
- Globe and Mail
Gran Tierra Energy Reports Record Production in Q2 2025
Gran Tierra Energy Inc ( (GTE)) has released its Q2 earnings. Here is a breakdown of the information Gran Tierra Energy Inc presented to its investors. Elevate Your Investing Strategy: Take advantage of TipRanks Premium at 50% off! Unlock powerful investing tools, advanced data, and expert analyst insights to help you invest with confidence. Gran Tierra Energy Inc. is an independent international energy company focused on oil and natural gas exploration and production, with operations primarily in Canada, Colombia, and Ecuador. The company is known for its diversified portfolio and disciplined approach to reservoir management. In its second quarter of 2025, Gran Tierra Energy Inc. reported record production levels, achieving an average of 47,196 barrels of oil equivalent per day. The company also announced a funds flow from operations of $54 million and an adjusted EBITDA of $77 million. Additionally, Gran Tierra signed a mandate letter for a $200 million funding facility and entered a binding agreement to exit the UK North Sea. Key financial highlights include a net loss of $13 million, a decrease from the previous quarter, and a 44% increase in production compared to the same quarter last year. The company achieved a record of 32 million hours without a lost time injury and reported the lowest operating costs per barrel since early 2022. Gran Tierra's strategic moves, such as successful drilling in Colombia and Canada, and exploration in Ecuador, contributed to these outcomes. Gran Tierra continues to optimize its portfolio by divesting from non-core assets, such as the UK North Sea, and focusing on its core operations in South America and Canada. The company is also enhancing its financial flexibility through strategic funding arrangements and a disciplined hedging strategy. Looking ahead, Gran Tierra Energy Inc. remains committed to its strategy of disciplined capital allocation and balanced growth, with plans for further exploration and development in its key operational areas. The management anticipates continued strong performance and long-term value generation for stakeholders.


CTV News
2 hours ago
- CTV News
North Bay gets $400K from province for smashing housing targets
Nipissing MPP Vic Fedeli announced $400,000 in provincial funding for North Bay on Friday for exceeding housing targets. The city built nearly 400 homes last year - five times the requirement. The funds will support more new builds and local infrastructure.


Globe and Mail
2 hours ago
- Globe and Mail
Shell Plc Reports Strong Cash Flow and Strategic Advances
Shell Plc ( (SHEL)) has released its Q2 earnings. Here is a breakdown of the information Shell Plc presented to its investors. Elevate Your Investing Strategy: Take advantage of TipRanks Premium at 50% off! Unlock powerful investing tools, advanced data, and expert analyst insights to help you invest with confidence. Shell Plc, a leading global energy company, is engaged in the exploration, production, refining, and marketing of oil and natural gas, as well as the production and marketing of chemicals. The company is known for its significant investments in renewable energy and its commitment to reducing carbon emissions. In its latest earnings report, Shell Plc reported strong cash flows and operational performance despite a challenging macroeconomic environment. The company highlighted its strategic advancements in deep-water projects in Nigeria and Brazil and celebrated the shipment of its first LNG cargo from Canada. Key financial metrics from the report include adjusted earnings of $4.3 billion and cash flow from operations (CFFO) of $11.9 billion. Shell maintained a strong balance sheet with a gearing of 19% and announced a $3.5 billion share buyback program. The company achieved $0.8 billion in structural cost reductions in the first half of 2025, contributing to a cumulative reduction of $3.9 billion since 2022. The company continues to strengthen its LNG position and aims for a 4-5% annual growth rate in LNG sales by 2030. Shell also enhanced its deep-water portfolio with new projects in Brazil and Nigeria. Despite lower trading results, the company remains committed to its strategic goals. Looking ahead, Shell's management remains focused on performance and discipline, with a stable cash capex outlook of $20-22 billion for 2025. The company is poised to continue its strategic initiatives in both traditional and renewable energy sectors, aiming for long-term growth and sustainability.