logo
Disruption after busy road in Kesgrave gets temporary lights

Disruption after busy road in Kesgrave gets temporary lights

BBC News11-04-2025
Temporary traffic lights put up after a water valve cover was damaged have resulted in long delays on a busy road.Main Road in Kesgrave, Suffolk, connects Ipswich to east Suffolk and is the main route through the town.Queues have been forming in both directions, with traffic backing up on the roundabout to Ropes Drive.It is not known how long the work is expected to take. Anglian Water has been approached for comment.
A spokesperson for Suffolk Highways said: "Suffolk Highways has attended the site to install temporary traffic management as a safety precaution until the service valve cover can be repaired by Anglian Water."
Debbie McCallum, the Conservative county councillor for Kesgrave and Rushmere St Andrew, said she had contacted highways bosses because the town council had been receiving calls about the issue.McCallum said: "It's annoying for all [who] travel this busy road but it needs to be solved for safety reasons."She said she hoped the work would be completed before Monday.
Follow Suffolk news on BBC Sounds, Facebook, Instagram and X.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Belgian Grand Prix practice - radio & text
Belgian Grand Prix practice - radio & text

BBC News

time11 hours ago

  • BBC News

Belgian Grand Prix practice - radio & text

Update: Date: 11:21 BST Title: Coming up Content: There's just the one practice session this weekend because the Belgian Grand Prix features a sprint race. Here's today's key timings (all BST): Practice session: 11:30-12:30 (BBC Radio 5 Sports Extra 2, BBC Sounds and smart speakers) Sprint qualifying: 15:30-16:14 (BBC Radio 5 Sports Extra 2, BBC Sounds and smart speakers) Update: Date: 11:18 BST Title: Norris feeling 'more of a threat' Content: Andrew BensonBBC F1 correspondent at Spa-Francorchamps Lando Norris says he feels 'more of a threat' to McLaren team-mate Oscar Piastri after progress made in his understanding and feel for the car in recent races. Norris comes to the Belgian Grand Prix on the back of consecutive victories in Austria and Britain, albeit he inherited the Silverstone win after Piastri was penalised for driving ing dangerously behind the safety car. 'Do I feel more of a threat now? Yes,' Norris said. 'But am I happy enough still with where I'm at, where the car is and my harmony with the car? It's still not to the level that I want.' A new part in the front suspension of the McLaren - which was introduced to help Norris feel the front tyres more, but which Piastri does not feel he needs and is not using - has helped Norris, but he has also worked on his driving with the team behind the scenes. Yet he says he still does not feel quite back to the the level he was at last year, when he was consistently the fastest McLaren driver. 'I certainly feel happier. Austria was a place I felt the happiest, even happier than I was in Silverstone. With the car, with the knowledge of where I can push, how I can push and all those things. 'We're still trying to work on things to give me more from the car in order to allow me to unlock that more often, like I was doing last season,' said Norris. 'The most positive thing from those two weekends was just that the pace was better from the off and I was more comfortable with the car and in understanding how to get the most pace from it. At times that brings more of a smile to my face than just winning the race itself. Because it's progress, it's seen progress and that's always a very good thing, it's a very rewarding thing.' Update: Date: 11:15 BST Title: Title battle heating up Content: Things are heating up in the title race as we move into the second half of the seaosn. After winning the past two grands prix, Lando Norris has narrowed the gap in the drivers' championship to his McLaren team-mate Oscar Piastri to eight points. Will Norris complete a hat-trick of race wins at the Belgium Grand Prix this weekend?

North Northamptonshire to spend £5m on transport upgrades
North Northamptonshire to spend £5m on transport upgrades

BBC News

time16 hours ago

  • BBC News

North Northamptonshire to spend £5m on transport upgrades

More than £5m will be spent on resurfacing roads in the north of the county as part of a wider £7.7m package to improve local funding, from the Local Transport Grant, will support multiple projects focused on road maintenance, traffic safety and bridge repairs in North Northamptonshire. The largest share of the investment - £5.095m - has been allocated to resurfacing works across the Northamptonshire Reform UK councillor Chris McGiffen, said: "This funding is significantly more than the council has received for general transport improvements to date and gives an opportunity to deliver schemes that have previously been unaffordable." Other major investments include £1.2m for replacing a weak bridge deck on Station Road in Earls Barton and £500,000 for waterproofing at Irthlingborough viaduct. A further £350,000 has been earmarked for a new pedestrian crossing on the A509 at projects include bus gate enforcement cameras in Kettering and Corby, £270,000 for new vehicle-activated signs, and £40,000 to close a road to tackle of the local authority, Martin Griffiths, said the works would support long-term improvements to local roads. "This funding, alongside the wider plans for highways, should mean residents start to see a difference," he added.A sum of £7.7m from the local transport grant for 2025-26 - rising to £54m by 2029-30 - can be used for road maintenance, safety upgrades and traffic signal projects are expected to be completed by summer 2026. Follow Northamptonshire news on BBC Sounds, Facebook, Instagram and X.

Brough's resurfacing works face three-week delay
Brough's resurfacing works face three-week delay

BBC News

timea day ago

  • BBC News

Brough's resurfacing works face three-week delay

A three-week delay will impact the start of roadworks in £300,000 scheme, which includes upgrading roads and paths along Welton Road from Moor Road to Cave Road, had been due to start in the project will instead begin on 10 August so it can include the crossroads at Welton Road, Skillings Lane and Elloughton Road, East Riding of Yorkshire Council Paul West said work had been timed to prevent as much disruption as possible. The first stage will be carried out on 10 August between 16:30 BST and 00:00 BST at the crossroads, up to the Morrisons work will start the following day along Welton Road between Moor Lane roundabout and the supermarket entrance and will be carried out daily between 09:00 BST until 17:00 BST for one work will go ahead on 17 and 31 from the crossroads to the Cave Road junction will also be under way from 09:00 BST until 17:00 BST on 18 August and are due to be completed on 29 resurfacing will then start on Welton Road from the Moor Road roundabout to the new roundabout with Water Lane on 1 until 9 of Welton Road will be closed to traffic and diversions will be put in place during working hours, the council said. Listen to highlights from Hull and East Yorkshire on BBC Sounds, watch the latest episode of Look North or tell us about a story you think we should be covering here. Download the BBC News app from the App Store for iPhone and iPad or Google Play for Android devices

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store