
Urgent repairs under way at 15th Century Oxburgh Hall in Norfolk
"If the water drops too low, the brickwork is exposed, which has an impact on the structural integrity of the hall itself," she said.
Workers are expected to remain at the site until the end of June and will also repair the sluice and culverts.The moat is fed via an underground channel from the River Gadder, with culverts allowing water in and out. The sluice gate controls the amount of water draining out of the moat and back to the Gadder. The Oxburgh Estate is owned by the National Trust but has been the family home of the Bedingfelds for more than 500 years, and they still live in private apartments at the hall.
Follow Norfolk news on BBC Sounds, Facebook, Instagram and X.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


BBC News
20 hours ago
- BBC News
Fire crews tackle gorse blaze in Torquay
Fire crews have tackled a gorse blaze in Torquay, from the town and Paignton responded after they received multiple calls about the fire on Rock End Avenue, in the Wellswood 20 sq m of gorse on the cliff was damaged by the blaze, Devon and Somerset Fire and Rescue Service used one jet and portable lighting to tackle the blaze.


The Independent
21 hours ago
- The Independent
RNLI rescues 19 migrants from English Channel after dinghy capsizes
Dramatic footage released by the Royal National Lifeboat Institution (RNLI) shows volunteers rescuing migrants from the English Channel after their small boat capsized in 2024. The never-before-seen footage, released on Tuesday, depicts the Dover RNLI crew responding to a mayday call when a dinghy with 19 individuals onboard sank. All of the migrants were successfully rescued from the water by the volunteers, who threw flotation devices and helped them onto the lifeboat. The RNLI reported responding to 114 separate crossing incidents in 2024, saving the lives of 58 migrants, including children. Watch the video in full above.


BBC News
21 hours ago
- BBC News
Maryport Christ Church window damage delays museum opening
Damage to the windows of a Grade II listed church have been blamed for yet another delay in its Church in Maryport, Cumbria, is undergoing major renovation to reopen as the town's Maritime was initially expected to finish in spring 2024, but Cumberland Council, which is behind the project, said the museum would now open in autumn authority said some of the building's windows were more damaged than initially thought, leading to delays in repairing and replacing them. "Our priority for Christ Church is to preserve and protect a building which is part of the fabric of Maryport and give it a long and successful future," said Mark Fryer, the Labour council's said working on old buildings was "never an exact science" and it was difficult to know what materials had been used in the initial construction and how they had been treated over time."While it is frustrating that the restoration has proved complicated, we are determined to get it right," he council said the issue did not affect the stained windows of the church, just those containing leaded Church is more than 150 years old and the local authority said the building had "suffered decades of deterioration" before it was bought in 2020. Follow BBC Cumbria on X, Facebook, Nextdoor and Instagram.