logo
Department of Transport agrees to front up repair costs on vehicles damaged in Princes Fwy traffic chaos

Department of Transport agrees to front up repair costs on vehicles damaged in Princes Fwy traffic chaos

News.com.au13-06-2025
Victoria's Department of Transport is expected to cover repair bills for the vehicles damaged in an incident that caused traffic chaos on the Princes Freeway earlier this week.
Motorists faced hours of delays on the major route after a 200kg steel panel covering an expansion joint in the road became dislodged, causing several collisions on Wednesday morning.
One involved a truck rolling over just after 4am, with crews dispatched to clean up a massive diesel spill.
It has since been revealed the steel plate was not properly secured by road crews, leaving a large pit with the expansion joint uncovered in the dark of night.
It is understood the Department of Transport and Planning will compensate in full all drivers whose vehicles were damaged.
Affected drivers are being contacted by the department to assist with the compensation claims process.
'We apologise to everyone affected by the incident on the Princes Freeway,' the department said in a statement to NewsWire.
'The incident was caused by human error during routine maintenance works on the bridge over the Werribee River.'
While the department is not normally liable for the first $1640 worth of damages caused by road conditions, an exception has been made for this incident, the Herald Sun reported.
The bungle left traffic backed up for kilometres, with all Melbourne-bound lanes closed for hours.
Delays of up to three hours were experienced by commuters travelling between Geelong and the capital city, who were advised to take similarly congested detours or travel by train.
Aerial footage showed traffic backed up along the road in droves as drivers travelled into the city.
At the time a police spokesperson said the issues were caused by the problems with the road works.
'It is understood issues with the road contributed to the collisions, which occurred about 4.20am,' the spokesperson said.
No one was injured in the chaos, and urgent repairs were undertaken to get the road operational as soon as possible.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Toyota to recall 70,000 Camry, Corolla, RAV4 vehicles over display screen error
Toyota to recall 70,000 Camry, Corolla, RAV4 vehicles over display screen error

News.com.au

timean hour ago

  • News.com.au

Toyota to recall 70,000 Camry, Corolla, RAV4 vehicles over display screen error

Almost 70,000 Toyota vehicles sold in Australia will be urgently recalled over a potential fault, including thousands of popular sedans, hatchbacks, and SUVs. Toyota Australia on Tuesday announced it would initiate a recall of about 69,586 vehicles sold in Australia between July 2022 and April 2025. Not all vehicles sold during the time range are impacted, but include Corolla and Camry hybrids, the Kluger Hybrid, and the RAV4 Hybrid. The notice stated the vehicles may be impacted by a fault with a 12.3-inch display on the instrument panel, which showy as blank when the vehicle is started. 'Driving without speedometer and any warning may result in an increased risk of an accident in certain driving conditions,' the recall notice stated. The display would usually show combination metre system information, including warning and indicator lights, vehicles gauges, and messages. Affected vehicles will require an update to the programming, which was improperly repeatedly writing unnecessary data to the memory of the metre. As such, the metre would deteriorate earlier then expected, according to the recall notice, and would take between one to 2.5 hours to be fixed. Owners of affected vehicles were told they could 'continue to drive your car' while awaiting the fix, and to contact a dealer or a recall hotline if the error occurred. The full list of affected vehicles ins available on the Toyota website, including: C-HR Hybrid, Camry Hybrid, Corolla Hatch Hybrid, Corolla Sedan Hybrid, Corolla Hatch petrol, Corolla Sedan petrol, Corolla Cross Hybrid, Corolla Cross petrol, GR Yaris, GR Corolla, Kluger petrol, Kluger Hybrid, RAV4 petrol, and RAV4 Hybrid.

Four dead after horror crash on Central Queensland highway
Four dead after horror crash on Central Queensland highway

ABC News

time2 hours ago

  • ABC News

Four dead after horror crash on Central Queensland highway

Four people have died in a horror crash in Central Queensland on Sunday morning, adding to the statewide toll of nine deaths since Friday. The crash happened about 10:50am on the Capricorn Highway, between Blackwater and Comet in the Central Highlands, 230 kilometres west of Rockhampton. One vehicle carrying four passengers and the second carrying two passengers crashed and caught fire. Queensland Ambulance Service treated four people, however they died at the scene. Emergency services could not provide their ages or gender. A further two men in their 20s were taken to Emerald Hospital with life-threatening injuries, including chest and abdominal injuries. Five ambulance crews attended with two Queensland Fire and Emergency Services vehicles. The RACQ Capricorn Rescue Service helicopter was called but was stood down. Queensland Police Service said it could not provide more details "due to the complexity of the incident". The Capricorn Highway between Comet and Blackwater remained closed on Sunday afternoon with a 50-kilometre detour in place through Rileys Crossing Road and Blackwater Cooroorah Road past Bedford Weir. The detour is not suitable for heavy vehicles. Police investigations are continuing. Nine people have been killed on Queensland roads since Friday, including three people in a head-on collision in Mackay on Friday night.

WA's RAC electric-highway charging project ends despite rise in EVs
WA's RAC electric-highway charging project ends despite rise in EVs

ABC News

time7 hours ago

  • ABC News

WA's RAC electric-highway charging project ends despite rise in EVs

When West Australian car insurer RAC first launched its "electric highway" installing electric vehicle chargers in WA's south-west, it was the first network of its kind in Australia and opened regional travel to EV owners for the first time. Not that there were many of them. RAC general manager of external relations Will Golsby said there were about 80 electric cars in the state in 2015, when the highway first opened. In surveys the RAC conducted 10 years ago, people were interested in EVs, but the number one concern was "range anxiety", the fear that the vehicles would be unusable outside of Perth because there was nowhere to charge them. "The original intent of the electric highways was really to open Western Australia up and enable people from Perth to travel through the south-west and allow our regional members with electric vehicles to travel to Perth," Mr Golsby told Gary Adshead on ABC Radio Perth. In 10 years, the number of fully electric vehicles in WA has grown to about 27,000, and there are about 150 charging stations across the state. The state government has spent more than $43 million on subsidies to help people buy electric vehicles and committed $21 million to extending the charging network. Mr Golsby said that, having demonstrated that owning an electric vehicle was a viable option in WA, the RAC had decided to move on, withdrawing from its involvement in the electric highway. "We wanted to open up the state to EVs," he said. "We believe there's been significant growth. We hope there will be more growth in electric vehicles." For Australian Electric Vehicle Association (AEVA) president Chris Jones, it is the end of an era in the evolution of electric transport in WA. It was Dr Jones, along with two others, who first pitched the idea of building the charging network to the RAC 10 years ago. "It started because I was unemployed and looking for something to do. I wrote a 10-page document on how you would build charging in the south-west," Dr Jones said. "We found the ideal spots and what the layout would look like, and we pitched it to anyone that would listen." Many potential funders and government agencies said no, but the RAC took the idea seriously. "They came back and said: 'You know what, this is absolutely something we should be supporting', and they did," Dr Jones said. Dr Jones said he was not surprised the highway project had now come to an end. The RAC purchased and installed electric-highway charging stations, but they were then owned and managed by local governments. "Councils weren't prepared for what it took to look after this sort of equipment," Dr Jones said. "You have to learn new skills, get familiar with new technology. You don't make much money from it." Some of those stations will continue to operate on the Chargefox network, while others will close down. In the popular south-west holiday spots of Busselton and Dunsborough, the council has decided not to continue running the charging stations. City of Busselton Mayor Phill Cronin acknowledged the charging station in Dunsborough was popular. "I don't think there's one time I've walked past and they're not being utilised," Cr Cronin said. However, he said the council had decided the charging station was not in a great location and the technology was becoming outdated. "It's just not something we feel that we should be taking on," he said, adding that a local shopping centre in Dunsborough had installed four fast charging stations in its car park, providing drivers with other options. In the case of the Busselton charging station, the council is inviting expressions of interest from businesses who would like to take over the charger. While it is the end of an era for electric driving in WA, the RAC said it had achieved what it set out to do. "It was Australia's first. Other states now claim to have the bigger, larger, longer, wider highways, but certainly this was Australia's first," Mr Golsby said. For AEVA, it was a major boost to its lobbying efforts in WA. "Buoyed by [the electric highway], we put the effort into lobbying the WA government into building a decent charging network around the state," Dr Jones said. "I think the next effort we will need to see in public charging will be workplace charging."

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store