logo
Andhra Pradesh to develop India's largest ecosystem for green hydrogen

Andhra Pradesh to develop India's largest ecosystem for green hydrogen

Hans India5 days ago
Amaravati: The Green Hydrogen Valley proposed by the government of Andhra Pradesh aspires to become India's green hydrogen capital by 2030, promoting the country's largest eco-system for production of green hydrogen and its derivatives in partnership with industry and academia.
It also aims to accelerate domestic R and D and capacity building in green hydrogen technologies, including testing facilities.
Chief Minister N. Chandrababu Naidu on Monday released Green Hydrogen Valley-Amaravati declaration
The key targets under Green Hydrogen Valley include establishing Electrolyser manufacturing capacity of 2 GW by 2027 and 5 GW by 2029, 1.50 MMTPA Green Hydrogen production capacity by 2029, achieving cost reduction from Rs 460 per Kg to Rs 160-170 per Kg by 2029 and creation of transmission infrastructure (Green Energy Corridor) to evacuate 25 GW RE power by 2029.
The declaration was finalised based on the deliberations at the Green Hydrogen Summit held last week here in association with the Government of Andhra Pradesh and NREDCAP.
The summit focused on green hydrogen production, storage, and distribution; green hydrogen applications in industry, transport, and power generation; policy, standards, and capacity building for a sustainable hydrogen ecosystem.
According to the declaration, by 2030 at least 60 per cent of all electrolyser components and storage solutions deployed in the state will be produced locally, reducing import dependency. At least three new production units for electrolyser and hydrogen storage manufacturing will be established, with a combined production capacity of at least 4-5 GW for electrolyser equipment.
The Green Hydrogen Valley will establish skilling ecosystem, specialised research Hubs with dedicated green hydrogen research centres, create cross-disciplinary labs, encourage collaborations with premier institutes, promote Public-Private Partnership (PPP) models to fund breakthrough projects, incentivise joint ventures between local start-ups and global hydrogen tech firms and facilitate knowledge exchange forums, workshops, and annual innovation summits.
The Green Hydrogen Valley will establish India's first Integrated Green Hydrogen Skilling Eco System in collaboration with reputed Universities and Institutions, to offer engineer upskilling and technician certifications – training 200 specialists in the first year and 2,000 annually by 2030.
The declaration says that the Green Hydrogen Valley will spearhead the creation of a robust start-up ecosystem in the green hydrogen sector. To catalyse innovation, the state will support start-ups working across the entire green hydrogen value chain. To catalyse innovation, the state will allocate Rs 500 crore over five years to support at least 50 start-ups working across the entire green hydrogen value chain.
To support the development of green hydrogen technologies, the Government of Andhra Pradesh will promote world-class Research and Development (R and D) centres and advanced testing facilities involving SRM University-AP as the state nodal agency, to carry out advanced research in green hydrogen technologies, including the testing facilities, with active support from the Nation's Mission.
The declaration noted that Andhra Pradesh is richly endowed with solar and wind energy potential, complemented by pumped hydro storage capacity, creating favourable conditions for large-scale development of green hydrogen. The state's long coastline further strengthens its position by offering an ideal ecosystem for exporting green hydrogen and its derivatives to Southeast Asian countries.
The state government established the first thematic centre under the World Economic Forum's Centre for the Fourth Industrial Revolution (C4IR) network in collaboration with WEF's Centre for Energy and Materials (CENMAT), which focuses on energy transition and green industries, driving innovation and sustainable growth in the region.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Congress slams govt for ‘institutional sabotage' over Justice Yashwant Varma impeachment
Congress slams govt for ‘institutional sabotage' over Justice Yashwant Varma impeachment

Time of India

time19 minutes ago

  • Time of India

Congress slams govt for ‘institutional sabotage' over Justice Yashwant Varma impeachment

New Delhi: The Congress on Saturday accused the government of " institutional sabotage " for refusing to admit the Opposition-backed impeachment motion against Justice Yashwant Varma in the Rajya Sabha , while proceeding with a similar motion in the Lok Sabha signed by both ruling and Opposition MPs. Senior Congress leader and lawyer Abhishek Singhvi said the Centre had ignored former RS Chairman Jagdeep Dhankhar's move to make the Opposition motion "property of the House" before his resignation. He warned that the government's conduct could give Justice Varma procedural grounds to challenge the impeachment. Explore courses from Top Institutes in Please select course: Select a Course Category Operations Management Product Management healthcare PGDM Finance Public Policy Leadership Healthcare others Data Science CXO Technology Degree Digital Marketing Management MBA Data Analytics Data Science MCA Project Management Cybersecurity Design Thinking Artificial Intelligence Others Skills you'll gain: Quality Management & Lean Six Sigma Analytical Tools Supply Chain Management & Strategies Service Operations Management Duration: 10 Months IIM Lucknow IIML Executive Programme in Strategic Operations Management & Supply Chain Analytics Starts on Jan 27, 2024 Get Details Rejecting Parliamentary Affairs Minister Kiren Rijiju 's claim that the RS motion was never admitted, Singhvi asked: "Didn't Chairman Dhankhar, by his words, make the issue property of the House? If not, why did he consult the law minister on introducing similar motions in both Houses?" by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Want to know more? click here Undo Singhvi said instead of appreciating bipartisan cooperation on Justice Varma's impeachment, the ruling party was treating it as "a race to show who did it first," displaying "ego and invincibility notions." He also linked the episode to Dhankhar's abrupt resignation, questioning if he was forced out and if MPs were pressured to sign additional papers. Singhvi added that the Congress had first raised corruption allegations in the Varma case, while the BJP was silent. Live Events Singhvi further alleged double standards, pointing to the government's inaction on a pending impeachment notice against Justice Shekhar Yadav over hate speech. He said the AICC legal department would hold a conference on August 2 on challenges to the Constitution.

Sent Rs 3 lakh crore to Tamil Nadu: PM refutes MK Stalin's claim on central funds
Sent Rs 3 lakh crore to Tamil Nadu: PM refutes MK Stalin's claim on central funds

India Today

time28 minutes ago

  • India Today

Sent Rs 3 lakh crore to Tamil Nadu: PM refutes MK Stalin's claim on central funds

Prime Minister Narendra Modi on Saturday refuted Tamil Nadu Chief Minister MK Stalin's claim that the state was denied its rightful share of funds by the Centre, and said that Rs 3 lakh crore was disbursed to the south Indian state in the last 10 years, which was thrice as much as the UPA government released from 2004 to 2014. The PM said that as many as 11 new medical colleges have also been set up in Tamil Nadu in the last 11 years with the Centre's help. Notably, DMK chief Stalin has been continuously complaining about the Modi government not releasing enough funds for Tamil Nadu. After the Niti Aayog meeting in New Delhi in May, Stalin said that due to a few states not signing the Memorandum of Understanding (MoU) with the Ministry of Education on the PM Shri scheme, the Samagra Shiksha Abhiyan funding was denied. He said that specifically, for the year 2024-2025, nearly Rs 2,200 crore in Union funding was withheld from Tamil Nadu. On Saturday, PM Modi addressed a public rally in Tamil Nadu's Thoothukudi, where he inaugurated infrastructural projects worth Rs 4,900 crore. PM Modi reached Thoothukudi directly from the Maldives where he completed a two-day state visit and signed a number of key agreements with President Mohamed Muizzu.

Demand to extend Kundannoor-Angamaly bypass to Kodungallur
Demand to extend Kundannoor-Angamaly bypass to Kodungallur

Time of India

time29 minutes ago

  • Time of India

Demand to extend Kundannoor-Angamaly bypass to Kodungallur

Kochi: Aiming to decongest the key road stretch connecting Kodungallur and Angamaly, a fresh demand is being raised to extend the ongoing Kundannoor-Angamaly Bypass Road project on national highway (NH) 544 up to Kodungallur. Tired of too many ads? go ad free now Benny Behanan, MP, has approached Union minister of road transport and highways Nitin Gadkari with the demand to construct a six-lane highway connecting Kodungallur and Angamaly. The MP said that the minister promised a proper step on the demand. NHAI has begun land acquisition procedures for the bypass road of NH 544, from Kundannoor to Angamaly, and the processes are in the final stage. "Linking the proposed Kundannoor-Angamaly highway with Angamaly-Kodungallur Road by constructing a six-lane highway towards Kodungallur from Angamaly town will help reduce traffic congestion in Kochi city and its surrounding areas. If the six-lane highway is constructed, it will enable travellers from northern part of Kerala to reach Kochi airport and cargo vehicles to reach Vallarpadam container terminal without any hindrance and in a timely manner. Additionally, the project will contribute to commercial progress of these regions," said Behanan. The MP has demanded the Union minister to include the project, which costs around Rs 2,500 crore, in the Bharatmala project or the national highways development project. During his meeting with Gadkari, Behanan pointed out that NHAI authorities are turning a blind eye to the public demand for construction of flyovers or underpasses at Perambra, Muringoor, Chirangara and Koratti areas on NH 544 stretching from Angamaly to Thrissur. "As national highway authorities are not ready to consider the proposal yet, the stretch of highway is experiencing severe traffic congestion. The minister assured that a permanent solution will be provided for this issue," said the MP.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store