logo
Major update in Air India crash probe references key issue thought to be its cause

Major update in Air India crash probe references key issue thought to be its cause

Daily Mirror23-07-2025
Air India has inspected its entire fleet of Boeing 787 Dreamliners and Boeing 737 planes following the horror crash last month, which killed 261 people, including dozens of Brits
Air India has confirmed it has found no issues in the locking mechanism of fuel control switches for its Boeing aircrafts.

The company has given the key update after the doomed Air India flight 171 crash, which killed 261 people last month. The Boeing 787 jetliner - bound for Gatwick Airport - careered into a medical college in Ahmedabad, India, moments after take-off.

The airline has now inspected its entire fleet of both Boeing 787s and Boeing 787 Dreamliners. It said in a statement today: "In the inspections, no issues were found with the said locking mechanism."

Such a fault would typically starve both engines of fuel, something which was highlighted as a possible cause in a preliminary investigation by third-party authorities this month. The two findings jar, but Air India reminded reporters it has some 33 Dreamliners in its fleet and subsidiary and low-cost unit Air India Express operates more than 70 Boeing 737 jets.
Last week, India's aviation regulator ordered all airlines operating several Boeing models to examine fuel control switches and submit their findings to the regulator by July 21.

In the past few weeks, the airline has faced disruptions in services amid heightened scrutiny and additional safety inspections, leading to flight delays, cancellations and growing passenger anxiety.
On Monday, an Air India Airbus 320 flight veered off the runway as it landed during heavy rainfall at Mumbai International Airport, partially damaging the underside of one of the plane's engines and leading to a temporary runway closure.
The flight had flown from Kochi in the southern state of Kerala. The airline said in a statement that all passengers and crew members disembarked safely and the aircraft was grounded for checks.

In another incident, an Air India flight from Hong Kong had a fire in its auxiliary power unit on Tuesday while passengers were exiting the aircraft after it landed in New Delhi.
'The auxiliary power unit was automatically shut down as per system design. There was some damage to the aircraft, however, passengers and crew members disembarked normally, and are safe,' the airline said. Its statement added the aircraft was grounded for investigation and the aviation safety regulator notified.
Indian conglomerate Tata Sons took over Air India in 2022, returning the debt-saddled national carrier to private ownership after decades of government control.
The $2.4 billion (£1.7 billion) deal was seen as the government's effort to sell off a loss-making, state-run businesses. It also was in some ways a homecoming for Air India, which was launched by the Tata family in 1932.
Since the takeover, Air India has ordered hundreds of new planes worth more than $70 billion (£51 billion), redesigned its branding and livery and absorbed smaller airlines that Tata held stakes in. The company additionally has committed millions of dollars to digital overhauls of aircrafts and refurbishing interiors of more than five dozen legacy planes.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Boeing St. Louis defense workers set to strike from Monday after rejecting latest offer
Boeing St. Louis defense workers set to strike from Monday after rejecting latest offer

Reuters

time24 minutes ago

  • Reuters

Boeing St. Louis defense workers set to strike from Monday after rejecting latest offer

Aug 3 (Reuters) - Union members who assemble Boeing's (BA.N), opens new tab fighter jets in the St. Louis area rejected the U.S. planemaker's latest contract offer on Sunday and will strike at midnight on Monday, the International Association of Machinists and Aerospace Workers union (IAM) said. "IAM District 837 members ... deserve a contract that reflects their skill, dedication, and the critical role they play in our nation's defense," the union's Business Representative Tom Boelling said. Boeing said it was ready for the action. "We are prepared for a strike and have fully implemented our contingency plan," Boeing Air Dominance vice president and general manager Dan Gillian said in an emailed statement to Reuters. "We're disappointed our employees in St. Louis rejected an offer that featured 40% average wage growth," he added. Boeing's original proposal included a 20% general wage increase over four years and a $5,000 ratification bonus, as well as more vacation time and sick leave. The union had rejected the offer, saying it was insufficient. Last week, Boeing sent a new contract offer to the union with some minor compensation changes that would benefit senior union members, according to the company. The offer also kept current overtime policies, which Boeing had proposed modifying in the last contract offer. The workers assemble Boeing's fighter jets and the MQ-25, an aerial refueling drone being developed for the U.S. Navy. Boeing's defense division is expanding manufacturing facilities in the St. Louis area for the new U.S. Air Force fighter, the F-47A, after it won the contract this year. The upcoming strike by the union, representing 3,200 employees, would be much smaller than the one Boeing was hit with last fall, when 33,000 machinists at Boeing's commercial plane division walked out for nearly two months. That strike ended with approval of a four-year contract that included a 38% wage increase.

US Boeing defense workers slated to strike after rejecting latest offer
US Boeing defense workers slated to strike after rejecting latest offer

The Guardian

time24 minutes ago

  • The Guardian

US Boeing defense workers slated to strike after rejecting latest offer

More than 3,200 unionized workers who assemble Boeing's fighter jets in the St Louis area rejected Boeing's latest offer on Sunday and will strike at midnight on Monday, the International Association of Machinists and Aerospace Workers union said. 'IAM District 837 members ... deserve a contract that reflects their skill, dedication, and the critical role they play in our nation's defense,' the union's business representative, Tom Boelling, said. Last week, Boeing sent a new contract offer to the union with some minor compensation changes that would benefit senior union members, according to the company. The offer also kept current overtime policies, which Boeing had proposed modifying in the last contract offer. The union had rejected the previous offer, saying that the offer was insufficient. Boeing did not immediately respond to a Reuters request for comment outside regular business hours. The workers assemble Boeing's fighter jets and the MQ-25, an aerial refueling drone being developed for the US navy. This would be the first strike that Boeing has faced at its St Louis defense hub since 1996. Boeing's defense division is expanding manufacturing facilities in the St Louis area for the new US Air Force fighter, the F-47, after it won the contract this year.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store