
Delhi-Jaipur In 3 Hours: Trial Run On Expressway Link Begins
The trial run on the Bandikui-Jaipur Link Expressway, connecting the Delhi-Mumbai Expressway to Jaipur, started on Wednesday. The journey from Jaipur to Delhi will now take just 2.5 to 3 hours, offering a faster and smoother travel experience.
The trial run started at 8 a.m., and no toll will be levied during this trial period of ten days.
The ultramodern expressway is undergoing quality checks and facility testing through the trial runs to identify and rectify any shortcomings before toll collection officially begins in the coming days, said officials. On the first day, the expressway was opened directly for traffic.
Additionally, the Khuri Interchange has been made operational to manage traffic coming from the Manoharpur-Kauthun highway. If all goes smoothly, traffic from other interchanges will also be allowed on the expressway within a day or two.
The 67-kilometre-long, four-lane access-controlled expressway stretches from Bandikui in Dausa district to Jaipur in Rajasthan and is nearly complete.
Vehicles will be permitted to travel at speeds of up to 120 km/h on this modern roadway. Impressively, construction was completed ahead of schedule.
Once fully operational, the expressway will significantly reduce travel time and will reduce the journey from Bandikui to Jaipur to just 25-30 minutes, compared to the previous duration of over an hour, which will eventually reduce travel time from Jaipur to Delhi and so on.
Furthermore, with its link to the Delhi-Mumbai Expressway, travel time from Gurugram to Bandikui will be reduced to just three hours.
Other tracks which will be connected on the Expressway include Delhi-Mumbai Expressway, Manoharpur-Kauthun Highway (via Khuri Interchange) and additional interchanges which will be opened soon, depending on trial success.
"All preparations for toll collection are complete. As soon as we receive the green signal from higher authorities, toll operations will commence," said B.S. Joiya, Project Director, NHAI Dausa Unit.
According to officials from the National Highways Authority of India (NHAI), the 66.91-kilometre-long Bandikui-Jaipur Expressway has been constructed at a cost of Rs 1,368 crore.
During the ongoing trial phase, all vehicles except tractors, motorcycles, and other restricted categories will be allowed to pass without interruption.
Once fully operational, the new expressway is expected to significantly reduce travel time, with the journey from Jaipur to Delhi expected to take just 2.5 to 3 hours.
Proposed Toll Rates (for private cars) include Rs 150 for the 66.91 km Jaipur-Bandikui Expressway, Rs 550 to Rs 560 for the full Jaipur-Bandikui-Sohna stretch, Rs 130 for the Sohna-Gurugram six-lane highway and Rs 680 to Rs 690 total toll between Jaipur and Delhi.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
20 minutes ago
- Time of India
After 'good' trials, roads min junks L1 bidding mode
NEW DELHI: In a major policy change, all highway agencies under the road transport ministry, including the NHAI, will soon replace the least cost (L1) mode for bidding out works for preparing detailed project reports (DPRs) with highest technical score (T1) for companies. The agencies will fix cost for consultancy service (bid price) and companies will be selected on the basis of their technical competence and ratings based on their past performance. Officials said the experiment of only fixed cost and highest technical score for bidding out works in the NHAI has been "good" so far, since its introduction in Sept last year. TOI on Sept 8 had first reported this crucial change in bidding parameters. "The new provision of rating of bidders and assigning 30% marks for technical score will further bring quality players to bid for projects," said a senior official. The policy change gains importance considering that there has been major deterioration in preparation of project reports after consultancy firms bagged projects quoting very low and unsustainable prices. Poor project preparation impacts quality of work and results in delay in implementation. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like 2025 Top Trending local enterprise accounting software [Click Here] Esseps Learn More Undo In developed countries such as Japan and Australia, govt entities pay more attention and time to preparation for DPRs for perfect execution. Officials admitted that there have been several cases where the prices quoted for preparing DPRs was as low as Rs 70,000-Rs 80,000 per km. "At such a low cost, no one can prepare a good DPR. Field surveys cost more than such quoted price. That was the trigger for fixing the cost, which approximately comes to Rs 4-5 lakh for one km of 4-6 lane highway. This is barely 0.5% of the overall project cost. In most other countries the payment made for DPR preparation is around 10% of project cost," an official said. He added that provisions have been made where companies that have key personnel from top 50 reputed technical institutes, such as IITs and NITs, will get a better score. "So, the entire framework of technical score, including the marks for ratings, is aimed at getting serious and quality players to bid for DRP works,"an NHAI official said.


Time of India
26 minutes ago
- Time of India
Autorikshaw drivers demand action against unauthorised autos in city
Kalaburagi: The proliferation of unauthorised autorickshaws and bike taxis in Kalaburagi has significantly impacted the livelihood of permitted autorickshaw drivers. The Autorickshaw Drivers' Association has highlighted that there are approximately 1,000 electric autos operating without proper permits, while another 1,500 to 2,000 autos with taluk licenses are plying within city limits. The situation has been further compounded by the govt's guarantee power scheme, which has resulted in a 50% reduction in the earnings of legitimate auto drivers. Licensed drivers are struggling to meet their financial obligations, including house rent, children's education fees, and vehicle loan repayments. The association's president, Laxmikant Malipatil, has urged immediate action from authorities to address this growing concern. He emphasised the need for stricter enforcement measures and the confiscation of unauthorised vehicles operating within the city limits. The challenges faced by auto drivers are exemplified by drivers like Mallikarjun, who previously earned between Rs 13,000 to Rs 15,000 monthly by transporting school children. Recent traffic police regulations regarding safety measures have restricted the number of school children that can be transported, reducing his monthly earnings to approximately Rs 8,000. Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Gold Is Surging in 2025 — Smart Traders Are Already In IC Markets Learn More Undo by Taboola by Taboola The association has called for a comprehensive solution that addresses both the issue of unauthorised vehicles and the financial hardships faced by permitted drivers. They suggest implementing stricter monitoring systems, regular enforcement drives, and measures to protect the interests of authorised auto drivers who have invested in obtaining proper permits and licenses. Local authorities are being urged to take swift action to regulate the transport sector effectively, while ensuring the livelihood of legitimate auto drivers is protected. If authorities control the operation of illegal autorickshaws in Kalaburagi city, the licensed rickshaw operators would experience increased passenger demand for their services. Speaking to TOI, Kalaburagi city police commissioner Sharanappa SD stated that the police department and RTO are jointly seizing autorickshaws, and around 300 non-permit autorickshaws have already been seized. This process will continue throughout the year. If anyone can provide information about specific unauthorised autorickshaws, those too will be seized, he assured.


NDTV
2 hours ago
- NDTV
FASTag Annual Pass: 8 Key Questions Answered Ahead Of Its Launch
The FASTag annual pass will be launched next month on August 15. It was introduced by the Road Transport and Highways Minister, Nitin Gadkari, who claimed that it would benefit the users and provide hassle-free travel. The Annual Pass will be available only for private vehicles, such as cars, jeeps and vans, at designated National Highway (NH) and National Expressway (NE) fee plazas for one year or 200 trips (whichever comes first). There will be no per-trip charges. Here Are 8 Frequently Asked Questions Around FASTag Annual Pass Q1. Where to get the Annual Pass? The government said that the Annual Pass can be activated only on the Rajmargyatra mobile application and the National Highways Authority of India (NHAI) website. Q2. How will the Annual Pass be activated? The Annual Pass will be activated after verifying the eligibility of the vehicle and the associated FASTag. The user must make a payment of Rs3,000 for the base year 2025-26 through the Rajmargyatra mobile application or the NHAI website after verification. The pass will be activated on the registered FASTag normally within two hours. Q3. If I already have a FASTag, do I need to buy a new one for the Annual Pass? The government has said that the Annual Pass can be activated on your existing FASTag; there's no need to buy a new one. But make sure the FASTag is properly affixed on the vehicle's windshield, linked to a valid Vehicle Registration Number (VRN), not blacklisted. Q4. How long is the Annual Pass valid? The Annual Pass is valid for one year from the date of activation or 200 transactions (trips), whichever comes first. Once the Annual Pass completes either 200 trips or one year from the date of activation, it will automatically revert to a regular FASTag. The user can reactivate. Q5. Can an Annual Pass be transferred to another vehicle? No, the pass is non-transferable and is valid only for the vehicle on which the FASTag is affixed and registered. If a user uses it on another vehicle, it will be deactivated. Q6. Can I get an Annual Pass if my FASTag is registered using a chassis number? The Annual Pass can't be issued on FASTags registered only with a chassis number. The users need to update the VRN to activate the Annual Pass. Q7. What counts as a single trip under the Annual Pass? As per NHAI, for point-based fee plazas, each crossing of fee plaza counts as one trip. A round trip (to and fro) counts as two trips. Meanwhile, for closed tolling fee plazas, one pair of entry and exit counts as one trip. Q8. Is the Annual Pass mandatory, or what if a road user doesn't want to opt for the Annual Pass? The Annual Pass is not mandatory; the existing FASTag system will continue to operate as is. If users don't want to opt for the Annual Pass, they can continue to use their FASTag for regular transactions.