NGT summons Guj officials over Kharai camel issue
National Green Tribunal
(NGT) recently issued fresh notices to Gujarat authorities in response to a non-compliance petition filed by the Kutch Camel Breeders Association (KCBA).
The NGT case centres on the protection of the endangered Kharai camels, known for their unique ability to swim and graze in coastal mangroves, and the preservation of their traditional breeding practices.
The KCBA has filed an execution application seeking enforcement of earlier NGT orders dated Sep 11, 2019, and Sep 16, 2021. These directives had called for measures to safeguard the camels' fragile habitat in Kutch and support the livelihoods of their breeders, who have faced increasing threats due to environmental degradation and lack of official support.
During the recent hearing, the NGT bench led by chairperson Justice Prakash Shrivastava noted the absence of key respondents, including the officials of the forest and environment department, the district collector of Kutch, despite being served notices.
In its latest order of July 9 the NGT states, "Let fresh notices be issued to all respondents. The additional chief secretary, forest and environment department, will either appear virtually or through an advocate on the next date of hearing to assist the tribunal.
The GPCB has filed a short reply affidavit. Learned counsel appearing for the GPCB submits that he will examine the issue again and ensure filing of fresh detailed affidavit before the next date of hearing."
You Can Also Check:
Ahmedabad AQI
|
Weather in Ahmedabad
|
Bank Holidays in Ahmedabad
|
Public Holidays in Ahmedabad
The Gujarat Pollution Control Board (GPCB), which was present, has been directed to re-examine the environmental concerns and submit a detailed affidavit. The next hearing is scheduled for Sep 19.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
6 hours ago
- Time of India
Illegal dumping: NGT slaps Rs 68L fine on Kurali MC
1 2 Mohali: The National Green Tribunal (NGT) has slapped a fine of Rs 68 lakh on the Kurali Municipal Council (MC) as environmental compensation for illegally dumping municipal solid waste without requisite permissions. The order came after a detailed hearing on a complaint regarding unscientific waste disposal practices by the council. The NGT's action follows findings that the municipal body was dumping solid waste at an unauthorised landfill in violation of the Solid Waste Management Rules, 2016. After hearing submissions from the Kurali MC and the Punjab Pollution Control Board (PPCB), the tribunal ordered the PPCB to recover the compensation amount from the municipal body. The fine was determined after the tribunal directed the Environmental Engineer, Regional Office, Mohali, to assess the extent of environmental damage and calculate the appropriate compensation. Following the submission of the engineer's report, the tribunal imposed the Rs 68 lakh penalty. In an earlier hearing, the NGT had already banned further dumping of waste at the current landfill site and directed the Kurali MC to identify a new location in compliance with environmental guidelines. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Get ₹2Cr life cover@ ₹700 p.m. ICICI Pru Life Insurance Plan Get Quote Undo It also denied authorisation sought by the council under the Solid Waste Management Rules due to non-compliance and multiple violations. "The present site does not conform to the provisions laid down under the Solid Waste Management Rules, 2016. Immediate steps must be taken to find and operationalise a new, compliant location for sanitary waste disposal," the tribunal's order stated. The directive is part of NGT's ongoing crackdown on environmental violations by local bodies and its broader push for compliance with scientific waste management practices. Earlier, the tribunal had constituted a survey committee comprising environmental engineers, district administration officials, and a duty magistrate. The committee's inspection revealed major lapses at the site, following which the NGT issued a blanket ban on the use of the current landfill and initiated penal proceedings against the municipal body. The Kurali MC has now been directed to urgently identify and develop a scientifically compliant solid waste management site and to submit a compliance report within the stipulated time frame. MSID:: 122446465 413 |


Indian Express
18 hours ago
- Indian Express
Illegal dumping of solid waste: Pollution board slaps Rs 10 crore fine on Thane Municipal Corporation
The Maharashtra Pollution Control Board (MPCB) has slapped a fine of Rs 10.2 crore on the Thane Municipal Corporation (TMC) for the illegal dumping of solid waste at Sabe Gaon in Diva, resulting in damage to mangrove cover. The MPCB announced the fine on July 2, on the orders of the National Green Tribunal (NGT). The MPCB officials said that the trash was dumped in land under the Coastal Regulation Zone (CRZ) category, causing destruction to mangrove cover from 2016 till 2023. The board added that the TMC continued to break environmental standards as it failed to clear the waste even after being brought to its notice about illegal dumping. The fine of Rs 10.2 crore also carries the extension of a two-year period, from 2023 to 2025, for the corporation's inability to clear the piled-up debris from the site. The dumping at the site was taking place since 2015, according to the NGO Vanashakti Foundation. The officials of the TMC did not comment on the fine. The issue was initially flagged in 2023 when Vanashakti Foundation moved a petition before the NGT. According to the petition, the land being occupied by TMC for dumping was within the CRZ and the activity of dumping had led to extreme environmental degradation, including the loss of mangrove cover. After the petition, the TMC systematically transferred its dumping activities to another spot in the periphery of the city. Even after the relocation, the initial dumping ground in Diva was still not cleared. 'We have stated that consistent dumping during several years in a CRZ area not only breached environmental practices but also caused the destruction of essential coastal green cover. The waste consists of Thane's municipal waste which has now started to enter the creek,' said Stalin D of Vanashakti. The MPCB fine follows a site visit and reports that established the TMC continued to dump on the Diva site and had not made efforts to reclaim the location.


Time of India
19 hours ago
- Time of India
PPCB imposes fresh environmental penalty on Jagraon civic body for solid waste violations
Chandigarh: In a renewed crackdown on persistent violations of environmental norms, the Punjab Pollution Control Board (PPCB) has directed the imposition of fresh environmental compensation on the Jagraon municipal council (MC). This action cites its continued failure to comply with the Solid Waste Management Rules, 2016, and non-implementation of earlier directives issued by the National Green Tribunal (NGT). The fresh penalty comes even as a previously imposed environmental compensation of Rs 88 lakh—covering violations from April 1, 2021, to Dec 31, 2024 — remains partially unpaid. According to the PPCB, only Rs 20 lakh was deposited by the council so far, with the remaining Rs 59 lakh still pending. In its compliance affidavit submitted to the NGT, the board confirmed that it directed its environmental engineer in Ludhiana to calculate additional environmental compensation for violations observed between Jan 1 and June 26, 2025. The case began with a complaint highlighting the illegal dumping of municipal solid waste in a pond near Maa Bhadar Kali Temple in Jagraon and the pollution caused in the surrounding areas. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like American Investor Warren Buffett Recommends: 5 Books For Turning Your Life Around Blinkist: Warren Buffett's Reading List Undo Acting on this, the NGT, on Sept 19, 2024, ordered the council to clean the pond, remediate legacy waste, stop further dumping by Dec 31, 2024, and submit a compliance report by Jan 15, 2025. However, PPCB inspections revealed incomplete implementation. During a site visit on June 18, 2025, PPCB found that while the pond was cleared using the Seechewal Model, the legacy waste excavated from the pond was dumped at an adjacent site where no scientific processing had begun. Some plastic waste was also found scattered at the location. Based on these findings, PPCB issued a notice and conducted a hearing before its chairperson on June 26, 2025. Following the hearing, the PPCB chairperson directed the immediate imposition of fresh environmental compensation and instructed Jagraon council to deposit the full outstanding amount without further delay. The council was ordered to begin the remediation of the waste removed from the pond and submit a progress report within seven days through the PPCB's regional office-III in Ludhiana. The council was also asked to ensure full compliance with all 11 activities under Rule 22 of the Solid Waste Management Rules, 2016, and submit a point-wise compliance report with target dates within a month. It was further directed to apply for the required authorisation under the rules, explore the use of vermi-composting techniques for wet waste, and submit a proposal accordingly. In addition, the council was told to adopt waste reduction measures through Reduce, Reuse, and Recycle (3R) initiatives, and to handle all types of waste in an environmentally sound manner. The council was also instructed to regularly inspect and take action against violators of the ban on single-use plastics and against individuals found dumping or burning waste in open areas or water bodies. To monitor compliance, PPCB's assistant environmental engineer from Ludhiana visited the site again on June 27 in the presence of the executive officer of the council. The inspection confirmed that all municipal solid waste was removed from the pond and that rejuvenation work under the Seechewal Model was completed. The total pond area is about seven acres—three acres were previously used as a dumping site, while the remaining four acres remain under semi-arid vegetation. The legacy waste from the old dump site was processed, but the waste removed from the pond still lies at the old dump site, with no remediation started yet due to wet conditions caused by recent rains. MSID:: 122391241 413 |