logo
BMC to introduce new policy for development of ‘iconic buildings' in city

BMC to introduce new policy for development of ‘iconic buildings' in city

Indian Express3 days ago

Eyeing to promote world-class architecture in the city, the Brihanmumbai Municipal Corporation (BMC) has charted plans to introduce a new policy which will pave the way for the development of 'iconic buildings' in Mumbai.
On Tuesday, the civic body invited suggestions and objections from citizens to its proposal to modify the prevailing Development Control and Promotion Regulation (DCPR) 2034 to introduce a new regulation – 33(27).
While the public can send in their suggestions and objections over a period of one month, the proposal has drawn flak from a section of activists.
Earlier in March, Deputy Chief Minister Eknath Shinde had announced plans for iconic buildings in Mumbai, following which the urban development department had proposed a new chapter in the DCPR in 2034.
In a bid to make the provision, the BMC on Tuesday floated the proposal to introduce a new regulation — 33 (27) — which pertains to the development of 'iconic buildings'.
According to the proposal, a building or a premises will be eligible to be deemed 'iconic' if they have 'unique and distinctive characteristics' owing to their shape, size, aesthetics, look, concept, theme, architectural or structural design among others.
As per the clauses, no residential building will be eligible for the category with at least 40 per cent of the building remaining open to the public through some fee-based system.
The proposals for a building's iconic status will be approved by a six-member scrutiny committee, which will be lead by the civic municipal commissioner, and comprise famed members from the global architectural field, visual art, a leading personality from the business industry as well as the director of the Town Planning in Maharashtra and the Chief Engineer of the Development Plan BMC's development plan department.
Once enforced, the scrutiny committee will inspect the proposal and then submit the proposal to the government body for principal approval.
According to officials, the project proponent of a private property who submits their bid for the iconic status will be mandated to have a minimum of 1 million sqm of BUA completed or have a minimum turnover of Rs 5,000 crore per year in the last three financial years.
Speaking to The Indian Express, senior officials said that the objective of the proposal is to elevate Mumbai's existing skyline by creating new points of attraction. 'The proposal has been initiated by the government of Maharashtra while the BMC issued the notification for modification. Across the globe, we see many iconic buildings with towers that have viewing points and public spaces like malls,' said a BMC official.
However, activists including Godfrey Pimenta have alleged that the definition of 'iconic buildings' remains very vague. Writing to the chief engineer of the Development Plan department in BMC, Pimenta wrote, 'The state government has retained power to grant additional FSI on payment of premium at a rate of 50% of land rate. Mischievously there is no cap as to how much FSI can be granted by state government. We have strong reasons to believe that the new Regulation is tailor-made to suit the requirements of few pre-determined developers.'

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Kochi's IT future brightens with mulitple infra projects
Kochi's IT future brightens with mulitple infra projects

Time of India

time18 minutes ago

  • Time of India

Kochi's IT future brightens with mulitple infra projects

Kochi: With several major IT infrastructure projects in the pipeline — including a new project by a private group in Infopark Phase II and the newly inaugurated IT Twin Towers in SmartCity — hopes for Kochi's IT sector are being rekindled. Chief minister Pinarayi Vijayan, while inaugurating the Lulu IT Twin Towers on the SmartCity campus on Saturday, announced that the Lulu Group will also set up a new IT tower in Infopark Phase II, Kakkanad. The Rs 500-crore project will come up on 3.5 acres near the Brahmapuram bridge and offer 9.5 lakh square feet of built-up space. The tower is expected to generate at least 7,500 jobs, and the state govt has pledged full support for the venture. Recently, UST Global has started construction of its new campus on 8.5 acres in Infopark Phase II, which is projected to provide direct employment to around 5,000 IT and ITeS professionals. The Lulu Twin Towers itself is expected to create approximately 30,000 jobs. Following the state cabinet's approval of TECOM's exit from the SmartCity project in Dec 2024, there are renewed hopes of integrating the 246-acre SmartCity campus with Infopark Phase I. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like 5 Books Warren Buffett Wants You to Read In 2025 Blinkist: Warren Buffett's Reading List Undo A special committee submitted its recommendations in Dec, but a final govt decision is still awaited. The launch of the Twin Towers is expected to give a revitalize the long-stalled SmartCity development. Further boosting the region's IT ecosystem, industries minister P Rajeeve recently laid the foundation stone for Geojit's IT park in Infopark Phase II. The 16-storey, 1.3 lakh square foot building is scheduled for completion within two years. Additional projects include the World Trade Centre Tower III in Infopark Phase I, a 37-acre TCS campus in Kinfra Park and V-Guard's upcoming IT park, which is nearing completion. Prestige Group's Phase II project is also under consideration in SmartCity, and Infopark's extension campus at the South Metro station is expected to begin operations soon. These developments are set to increase the current IT workforce in Infopark, SmartCity, and nearby campuses from 1 lakh to an estimated 1.5 lakh. Meanwhile, Infopark authorities are awaiting final govt clearance for a proposed third campus spanning 500 acres in Kunnathunadu panchayat. The plan, jointly initiated by Infopark and the GCDA using a land pooling model, is pending approval.

Nuvoco gets 952cr Vadraj assets after ED issues NOC
Nuvoco gets 952cr Vadraj assets after ED issues NOC

Time of India

time18 minutes ago

  • Time of India

Nuvoco gets 952cr Vadraj assets after ED issues NOC

Mumbai: The special court allowed the restitution of attached properties valued at Rs 952 crore of Vadraj Cement (ABG Cement) to a company that acquired it through a resolution plan approved by the National Company Law Tribunal, after the Enforcement Directorate issued a No Objection Certificate (NOC). The ABG group obtained a loan from Infrastructure Leasing & Financial Services Ltd (IL&FS), which IL&FS later declared non-performing. Consequently, in the IL&FS money laundering case in 2020, the ED provisionally attached the Surat plant of Vadraj Cement. Subsequently, Nuvoco Vistas Corporation, a subsidiary of the Nirma Group, purchased the cement firm through the NCLT resolution plan. Nuvoco then approached the court to request the restoration of the cement plant. The ED stated that the ABG group had obtained Rs 952 crore in financial assistance from IL&FS, which was subsequently declared non-performing. The ED attached the immovable properties of Vadraj Cement, including its Surat Cement Plant, and the adjudicating authority confirmed the attachment in 2021. The ED filed a chargesheet with the court related to the issue. You Can Also Check: Mumbai AQI | Weather in Mumbai | Bank Holidays in Mumbai | Public Holidays in Mumbai Vadraj Cement had also obtained loans from Punjab National Bank (Rs 2,122 crore), Union Bank (Rs 1,620 crore), Indian Overseas Bank (Rs 1,419 crore), Central Bank of India (Rs 1,391 crore), and JC Flower ARC (Rs 677 crore). by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Profit Trick - Read More vividtrendlab Click Here Undo A proceeding was initiated against the company under the Insolvency and Bankruptcy Code before the NCLT. Nuvoco Vistas Corporation Ltd., a subsidiary of the Nirma Group, purchased the cement company through a resolution plan in which it agreed to pay Rs 1,706 crore to the financial creditors in lieu of acquiring Vadraj Cement Ltd, the ED said in a press release issued on Saturday. Nuvoco Vistas Corporation filed an application before the special court, which allowed the restoration of the assets after the ED's NOC. It is alleged that the former top management of IL&FS Group gave dubious loans to many companies who defaulted the payment, causing losses to the group.

DDA to offer residential plots for auction in south Delhi area
DDA to offer residential plots for auction in south Delhi area

Time of India

timean hour ago

  • Time of India

DDA to offer residential plots for auction in south Delhi area

New Delhi: Delhi Development Authority (DDA) has prepared its strategy to offer residential plots in prime locations during its forthcoming auction scheme. Focusing on flatted development so far, the authority recently began the process to engage a specialist firm to mark out 118 plots in D6 Vasant Kunj in south Delhi. Tired of too many ads? go ad free now DDA has issued a notice inviting tenders to select an experienced agency for the demarcation, along with developing the surrounding roads and services such as stormwater drains and the laying of pipelines for sewerage and water supply, said an official. "The idea is to prepare the site for the e-auction," he added. The authority has also identified sites for developing surface parking, which will cater to the Ganga, Yamuna, Narmada and Saraswati blocks of Sector D6 Vasant Kunj Mega Housing. DDA developed these societies in and around 2010. "There has been a demand for proper parking space. It will benefit the residents of 1,904 flats by easing the parking issues. On the other hand, the plotted development will help the public or buyers who prefer it," said the official. Delhi Development Authority has decided on a timeline of 365 days for the completion of the tasks after the award of work. "The maximum time allowed for planning and design, including vetting from the competent authority, will be three months, and the time allowed for the actual execution of work is nine months after the allotment of work," said the official. The tasks include planning and designing services like drains, sewerage, water supply, rainwater harvesting and approval of the same from the local civic body. "The preparation and submitting completion plans of all the above-mentioned services will be done as per the direction of the engineer-in-charge," stated the project plan. Works also include providing and laying factory paver blocks in footpaths, parks and lawns; driveways of required strength, thickness and size at various sites; making connections of drain or sewer line with existing manhole; disposal of building rubbish, dismantled or waste materials from sites by mechanical means, including loading, transporting and dumping etc, it added. Tired of too many ads? go ad free now According to the notice inviting tender, the entire work costing around Rs 7.5 crore will be done as per the guidelines of Central Public Works Department while National Green Tribunal's norms are to be adhered to. The proposal of the development projects should ensure minimal felling of trees, it pointed out. "All the alternative proposals should also be analysed and kept on record. No tree should be felled/translocated in the area identified for development projects by any field staff, unless formal and final permission is received from the forest department," the notice emphasised.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store