
India adds 21.9 GW of solar, wind capacity in H1 2025; another 17 GW expected in H2
According to the report by JMK Research, the country is projected to add another 16–17 GW of solar and wind capacity in the second half of 2025.
It added that solar installations rose by 51.6 per cent while wind capacity surged by 82 per cent compared to last year.
According to the data released by the Ministry of New and Renewable Energy till June 2025, India's RE installed capacity reached 234 GW, said the report published by JMK Research.
It added that solar energy contributed about 50 per cent of the total RE segment followed by wind at 22 per cent, large hydro at 21 per cent, bio power at 5 per cent, and small hydro at 2 per cent.
From January to June 2025, about 14.3 GW of new utility-scale solar capacity was added in India, which represented about 49 per cent higher installations from H1 2024. The majority of this capacity, 10.6 GW, was added in Q2 2025 only, it noted.
'In H1 2025, India added roughly 3.2 GW of rooftop solar capacity — a 76 per cent increase over H1 2024, while in the off grid/distributed solar segment, about 816.6 MW was added which is about 18.6 per cent higher than H1 2024 installations,' it said.
According to the report, in the wind sector, about 3.5 GW of new capacity was added in H1 2025, 84 per cent higher than the 1.9 GW capacity added during H1 2024. The trend is expected to continue as new RE procurement mechanisms such as wind-solar hybrid, wind/solar with ESS, and Firm & Dispatchable Renewable Energy tenders gain traction.
In terms of state wise installations in H1 2025, three states — Gujarat, Rajasthan, and Maharashtra — together contributed over 50 per cent of India's total solar and wind capacity additions, highlighting their central role in the country's clean energy transition.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
3 days ago
- Time of India
MNRE, Odisha discuss clean energy roadmap, focus on Green Hydrogen export
New Delhi: Odisha is set to play a key role in India's clean energy transition, with the state aiming to become a major producer and exporter of Green Hydrogen derivatives and intensify rooftop solar adoption under two national flagship schemes. This was reviewed during a high-level meeting chaired by Ministry of New and Renewable Energy (MNRE) Secretary Santosh Kumar Sarangi and Odisha Chief Secretary Manoj Ahuja. Highlighting Odisha's potential, the MNRE Secretary said the state is 'uniquely positioned to play a critical role in India's Green Hydrogen scale up' and is attracting 'significant interest from domestic investors' for production of Green Hydrogen derivatives such as Green Ammonia and Green Methanol, particularly near Paradip and Gopalpur ports. According to MNRE, the National Green Hydrogen Mission (NGHM) aims to position India as a global hub for Green Hydrogen production, usage, and export. The Odisha government expressed commitment to establish the state as a preferred destination for investment in this sector. The meeting included participation from senior officials of central ministries, state departments, and Green Hydrogen developers, focusing on challenges in developing large-scale Green Hydrogen and Green Ammonia projects, particularly at the SEZ in Gopalpur. Chief Secretary Ahuja said Odisha's strategic coastal location, industrial ecosystem, and policy framework make it favourable for Green Hydrogen production and export. He also noted challenges such as water availability, large-scale renewable energy integration, and infrastructure needs. The performance of the state under the PM Surya Ghar: Muft Bijli Yojana (PMSG: MBY) was also reviewed. MNRE instructed District Collectors to expedite the pace of rooftop solar installations. Ahuja directed officials to conduct regular SLBC meetings, coordinate with vendors and bankers for prompt loan sanctions, and implement the Utility-Led Aggregation (ULA) model with focus on low-income households installing systems below 1 kW. The Ministry shared best practices from other states under PM-KUSUM to scale up agricultural solarisation. The Chief Secretary directed the state nodal agency to adopt Feeder Level Solarisation in Odisha to extend clean energy to the farming community.
&w=3840&q=100)

Business Standard
4 days ago
- Business Standard
Ireda share price slips 6% as Q1 profit plunges 36% YoY; details here
Ireda share price: Indian Renewable Energy Development Agency (Ireda) share price dropped as much as 6.24 per cent to hit an intraday low of ₹159.05 per share on Friday, July 11, 2025. At 11:05 AM, Ireda share price was trading 5.07 per cent lower at ₹161.05. In comparison, BSE Sensex was trading 0.78 per cent lower at 82,539.85 levels. Why did Ireda share price drop? Ireda shares declined today following a disappointing financial performance in the June quarter (Q1FY26). Ireda reported a 35.6 per cent year-on-year (Y-o-Y) drop in consolidated net profit, which fell to ₹246.88 crore in Q1FY26 from ₹383.70 crore in the same quarter last year (Q1FY25). Sequentially, net profit plunged over 50 per cent from ₹501.79 crore reported in the March quarter (Q4FY25), signalling a sharp slowdown in earnings momentum. While revenue from operations rose 29 per cent Y-o-Y to ₹1,947.60 crore, and grew 2.3 per cent sequentially, rising costs weighed heavily on profits. Financing costs surged to ₹1,218 crore, up from ₹975 crore in the year-ago period, impacting margins and investor sentiment. About Ireda The Indian Renewable Energy Development Agency (Ireda), established in 1987, is a public limited company under the administrative control of the Ministry of New and Renewable Energy (MNRE), Government of India. As a dedicated financial institution, Ireda plays a crucial role in promoting, developing, and extending financial support to renewable energy and energy efficiency/conservation projects across the country. The organisation operates with the motto 'Energy for Ever' and has emerged as a key driver in India's clean energy transition. Ireda holds the 'Navratna' status, granting it enhanced operational autonomy within the public sector. It is widely recognised as India's largest pure-play green financing Non-Banking Financial Company (NBFC), offering a wide range of services - from project conceptualisation and financing to post-commissioning support and assistance for equipment manufacturing and transmission.


Time of India
4 days ago
- Time of India
India adds 21.9 GW solar and wind capacity in H1 2025, up 56% YoY
New Delhi: India added about 21.9 GW of new solar and wind power capacity in the first half of 2025, marking a 56 per cent year-on-year increase compared to H1 2024, according to data released by the Ministry of New and Renewable Energy (MNRE). Between January and June 2025, solar installations rose by 51.6 per cent , while wind capacity saw an 82 per cent year-on-year growth. This brings India's total renewable energy (RE) capacity to approximately 234 GW, with solar energy accounting for about 50 per cent of the mix. Wind contributes 22 per cent , large hydro 21 per cent , bio power 5 per cent , and small hydro 2 per cent . Utility-scale solar led the additions, with 14.3 GW installed in H1 2025—a 49 per cent rise over H1 2024. Of this, nearly 10.6 GW was added in Q2 2025 alone. Rooftop solar capacity additions reached around 3.2 GW, up 76 per cent year-on-year, while off-grid and distributed solar capacity grew by 18.6 per cent , with 816.6 MW added in H1 2025. In the wind sector, India added approximately 3.5 GW in the first six months of 2025, compared to 1.9 GW in the same period last year. New procurement mechanisms such as wind-solar hybrid, solar or wind combined with energy storage systems (ESS), and Firm and Dispatchable Renewable Energy (FDRE) tenders are expected to further drive additions in this segment. Gujarat, Rajasthan, and Maharashtra together accounted for more than 50 per cent of the total solar and wind capacity additions in H1 2025, highlighting their significant role in the clean energy transition. According to JMK Research, the trend is expected to continue in the second half of the year, with an additional 16–17 GW of solar and wind capacity likely to be commissioned.