
IIIT-B student gets record ₹1.45 crore package as institute celebrates silver jubilee convocation
This was announced during the Silver Jubilee Convocation Ceremony held on the IIIT-B campus, where 372 students graduated across various programmes.
The convocation saw 142 students graduate from the iMTech programme, 192 from the MTech programme, 12 from MSc in Digital Society, 10 from MSc by Research, and 16 PhD scholars. Top academic performers were recognised with medals.
According to a release, this year's placement season has been especially noteworthy. 14 students received annual packages exceeding ₹60 lakh, 67 students received offers above ₹40 lakh, and more than 180 students secured packages above ₹20 lakh per annum.
Parallel to the convocation celebrations, the institute highlighted its growing global role in shaping Digital Public Infrastructure (DPI).
At a press conference, the institute's Director, Prof. Debabrata Das unveiled key initiatives led by the Centre for Digital Public Infrastructure (CDPI), a non-profit team working across 60 countries. Among IIIT-B's flagship contributions is MOSIP (Modular Open Source Identity Platform), which has issued over 136 million digital IDs in 27 countries and is expected to reach nearly one billion people within three years.
'MOSIP is a homegrown product from India to the world. It reflects IIIT-B's mission to foster ethical, scalable, and inclusive digital tools,' Prof. Das said. The platform has earned international accolades, including the Future of Government award and a 'Champion' recognition at the 2024 World Summit on the Information Society in Geneva.
He further stated that building on MOSIP's success, the institute has launched INJI, a next-generation, privacy-centric data exchange platform, now adopted by four countries. Backed by partners like the Gates Foundation and NORAD, IIIT-B's DPI ecosystem also includes projects like OpenG2P and COSS, aimed at driving policy innovation and societal transformation.
Beyond DPI, IIIT-B's other initiatives include the E-Health Research Centre's collaboration with NIMHANS on the Tele-MANAS mental health programme, the AI for Inclusion (A4I) initiative with Microsoft Philanthropies, and advanced telecom R&D through the COMET Foundation.
In recognition of its sustainability efforts, IIIT-B was awarded the International Green University Award for the third consecutive year. The governing body has also approved ₹817 crore for the construction of a new East Campus over the next seven years, the release said.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Indian Express
4 hours ago
- Indian Express
New solar cell tech developed at IIT-Bombay a gamechanger: Union minister
Union Minister for New and Renewable Energy Pralhad Joshi on Tuesday said that new solar cell technology developed at Indian Institute of Technology Bombay (IIT-B) is a 'gamechanger' and urged industry players to invest in scaling up the project. In a major boost to works happening in solar energy sector at IIT-B, Joshi announced disbursement of fourth instalment of total funding of Rs 200 crore that was assured more than a decade ago to the National Centre for Photovoltaic Research & Education (NCPRE) — the umbrella body for various research projects in renewable energy sector at the institute. In the current phase of funding, which is expected to bring Rs.83 crore, it will be through Public Private Partnership (PPP) model as government is urging industry players to invest in scaling up the project, particularly the high-efficiency 2-terminal tandem solar cell using a perovskite-silicon combination, achieving about 30 per cent power conversion efficiency, which is significantly higher than the current 20 per cent. Talking about this innovation at the IIT Bombay, the Union minister who visited the NCPRE at IIT-B, said, 'It is a game-changer for India's solar energy future. This makes India a global leader in next-gen photovoltaics and by investing in such innovations, we are driving down the cost of solar energy, making it more accessible for all Indians.' Assuring continuous support from MNRE, Joshi emphasised the need of scaling up of this technology for commercial success. 'Private investment is crucial for large-scale technology development and some of the industry representatives present for the meeting today have shown great interest,' said Joshi. Prof Dinesh Kabra head of the team which has successfully engineered a semi-transparent perovskite solar cell (PSC) said that funding in this phase will be for scaling up of this technology at commercial wafer-size. Further it will be catalysing the support for the future pilot line through which commercialisation will be made possible. 'After having formed the 4-terminal (4T) tandem structure, with this renewed funding the team will now work on developing a 2-terminal tandem structure with support from the manufacturing partner,' he said. The Indian Express had reported about the major breakthrough in the Solar Energy Sector at the IIT Bombay. The semi-transparent perovskite solar cell (PSC) which is layered over a traditional silicon-based solar cell, forming a 4-terminal (4T) tandem structure enables a better energy conversion and durability, especially in India's heat-intensive conditions. Apart from boost in efficiency over conventional solar technology, it has potential to reduce the cost of solar power at around Re 1 per kwh compared with Rs 2.5-4 per unit now.


Indian Express
5 hours ago
- Indian Express
Karnataka floats Rs 17,698-crore global tender for twin-tube tunnel road project in Bengaluru
Despite extensive criticism from several corners, Bengaluru Smart Infrastructure Limited (B-SMILE) has invited international competitive bids for the construction of a three-lane underground twin tunnel road from Hebbal Esteem Mall Junction to Silk Board KSRP Junction, aiming to transform urban mobility along the city's busy north-south corridor. The massive infrastructure initiative, with an estimated cost of Rs 17,698 crore (excluding GST), will be implemented under the modified build-own-operate-transfer (BOOT) model and includes operation and maintenance responsibilities. The project is split into two packages—Hebbal to Seshadri Road and Seshadri Road to Silk Board—with estimated costs of Rs 8,770 crore and Rs 8,928 crore, respectively. The proposed tunnel, spanning nearly 17 km, includes multiple entry and exit ramps and is expected to significantly ease congestion across central Bengaluru and reduce the time travel from 90 minutes to 45 minutes. The total concession period has been set at 34 years, including a 50-month construction timeline for each package. Tender documents will be made available on the Karnataka Public Procurement Portal starting July 15. The pre-bid meeting will be held on August 4, and the deadline for submission of tenders is September 2. B-SMILE has invited participation from contractors registered with agencies such as BBMP, CPWD, KPWD, Railways, MES, and other state or national bodies. The proposed tunnel road, if executed as planned, will be one of the most expensive and ambitious infrastructure undertakings in Bengaluru's history. Touted as a 'pet project' of Deputy Chief Minister D K Shivakumar, the initiative has come under severe criticism from Opposition BJP leaders, civic groups, mobility experts, and environmentalists. The government has floated global tenders even after the BBMP was called out for shoddy work of the detailed project report (DPR) prepared by Rodic Consultants at a cost of Rs 9 crore. The report was criticised for glaring errors including its references of traffic analysis to cities like Nashik and Malegaon in Maharashtra and downplaying environmental impact. The DPR also proposes a toll of Rs 330 (one-way) for a distance of 16.6 km. The report also highlights tolls for subsequent years are calculated on the basis of a 5 per cent annual increase in wholesale price index with a 40 per cent restriction. The base year for the toll revenue is FY 2030-31. Importantly, the toll estimates have been proposed only for cars, with no mention of other vehicles. Shivakumar had earlier said that without a toll, the tunnel road project cannot go ahead. Bangalore South MP Tejasvi Surya came down heavily on Shivakumar on Monday, criticising the proposed tunnel road project as an unscientific and elitist initiative that sidelines the needs of the common man. He also warned of legal action if the government goes ahead with the project, which he said would violate Bengaluru's Comprehensive Mobility Plan and sustainable transportation goals. The BJP MP also flagged the background of the consultants involved. He pointed out that one of the firms behind the feasibility study—part of a joint venture between Lion Consultants and Altinok—has been blacklisted in Madhya Pradesh over a National Highways Authority of India (NHAI) project, he said. Meanwhile, Rodic Consultants, which prepared the DPR, were reportedly linked to a Rs 500-crore scam in Jammu & Kashmir. Surya further alleged that the project was moving ahead without mandatory clearance from the Bengaluru Metropolitan Land Transport Authority, violating section 19 of the BMLTA Act.


The Hindu
5 hours ago
- The Hindu
Tenders invited for 16.7 km Twin Tunnel Project linking Hebbal and Silk Board
Amid mounting criticism, B-SMILE, a special purpose vehicle, has floated global tenders for the proposed Twin Tunnel Road between Esteem Mall Junction in north Bengaluru's Hebbal and Silk Board Junction in the southern part of the city. The project will be executed in two segments. According to the tender notice, issued by the Superintending Engineer of B-SMILE, the construction period has been set at 50 months, equivalent to four years and two months. If completed on schedule, Bengaluru residents can expect access to the tunnel road by the end of 2029. Despite opposition from sections of citizens and the Opposition party, the stated aim of the tunnel project is to reduce congestion and address connectivity woes. BOOT model The project will be carried out under the Build, Own, Operate, and Transfer (BOOT) model, with a total concession period of 34 years. This includes the 50-month construction period, during which the contracted companies will develop the infrastructure and subsequently operate and maintain it. The first package will cover 8.748 km between Esteem Mall Junction and Seshadri Road, Race Course Junction. The second package will cover 8.748 km from Seshadri Road to Silk Board junction. Each stretch will include two separate tunnels, each with three lanes, featuring entry and exit points along the route. As previously reported by The Hindu, at least eight Tunnel Boring Machines (TBMs) will be deployed for the construction. The estimated cost for Package 1 is ₹8,770 crore, requiring a financial guarantee of ₹43.85 crore from the selected contractor. Package 2 is estimated at ₹8,928 crore, with a required financial guarantee of ₹44.64 crore. The tender document specifies that only contractors registered with the Bruhat Bengaluru Mahanagara Palike (BBMP) or equivalent registrations with agencies such as the Central Public Works Department (CPWD), Karnataka Public Works Department (KPWD), Railways, Military Engineering Services (MES), National Highway Authority, or other state government bodies are eligible to apply. The technical bids for the project are scheduled to open on September 3.