
The Platform Trap: Mallorca makes life miserable for the unsuspecting rail passenger
Other people's public transport is usually fun to unravel. So far this month I have variously been assured on some buses in Lithuania and Poland that I must get a ticket in advance; on others, I had to pay the driver. Some buses were cash only, others insisted on payment by card (or phone).
Flying on from Warsaw to Palma, the driver of the airport bus into town needed €5 in cash – but at least she could sell tickets, unlike increasingly many airport bus services (Lodz in Poland, for example). But last Wednesday evening, I fell foul of the Kafkaesque ticketing trap devised by Mallorca 's otherwise excellent public transport network.
The island's railway – a train line running north from Palma – has improved by leaps and bounds over the years. It is now a metro, with smart air-conditioned trains as frequently as every 10 minutes. But unlike any other such system I have seen, each platform is a stand-alone entity.
You can access the platform only by an automatic gate, and – as I discovered to my discomfort – you cannot cross from one platform to the other without exiting the automatic gate.
So what's wrong with that? Well, at a small station seven stops from central Palma, Pont d'Inca Nou, I bought a ticket at the entrance to platform 1 for a train that was departing from platform 2.
When I say 'ticket', it was just a paper receipt with a QR code, which I duly scanned. The gates allowed me onto platform 1. Where, I wondered, was the bridge, subway or street-level walkway that would allow me to cross to platform 2 to catch the Palma train that was due to arrive in two minutes?
Every railway I have ever used allows you to do that... except in Mallorca. But there is nothing to indicate the unusual arrangement. Indeed, I was able to buy a ticket to the island's capital from the wrong side of the station and go through the gates to a platform from which trains are travelling away from Palma.
Whoever programmed the whole thing presumably knew they were dispatching unknowing passengers into a transportational black hole where the normal laws of travel physics cease to exist.
No, you cannot retrace your steps because the machine has already checked you out of Pont d'Inca Nou. The only permitted journey is down to Palma, but you are trapped on a platform from which the only way is up. And yes, I did check out the fences: they are Iron Curtain grade.
All I could do was catch the next northbound train – immediately placing me at risk of a penalty, because I was going in the opposite direction – and hope a more normal arrangement prevailed at the next stop. It did not. I was unable to cross to the southbound track without exiting through the gate, which was never going to let me through because my ticket was not valid.
So I tailgated another passenger, and followed her over the pedestrian crossing that is unhelpfully located outside Stalag Platform 1, as I now knew it. As luck would have it, she had evidently overshot her station, and was heading for Platform 2. So I was able to tailgate her again (of which she was probably getting fed up). No ticket examiner appeared in the two minutes the train took to trundle to my original station, from where I was finally travelling legally.
Should you have the good fortune to find yourself in Mallorca, please do not follow in my tailgating, ticket-bending footsteps. And to TIB, the public transport provider, I say: put up signs saying 'Abandon hope, all ye who enter here'.
There is a serious point: an excellent way to cut traffic congestion in Mallorca is to encourage more rail use. But that will only happen if holidaymakers feel confident about using the trains.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


The Sun
13 hours ago
- The Sun
Europe's newest theme park finally opens with mermaid, dragon and Viking themed lands
A HUGE new theme park has finally welcomed guests in Europe after being forced to delay its opening date. Hossoland in Poland was first announced back in 2017, and has hoped to open back in May. 3 It has since opened, with the official opening date on June 27. The theme park - in the village of Brojce which is around an hour from Szczecin - is spread across 400,000sqm. And inside are four themed zones. There is The Mermaid City, with the main attraction being the Mermaid Ride rollercoaster, which is a "fairy-tale world full of underwater adventures". Kingdom of Baltambrya will have the Poseidon ride, which is a swinging hammer experience. The Dragon Valley of the Mines will be a dragon -themed land, with suspended rollercoaster Aurora. And finally there is the Land of the Vikings with the Thor rollercoaster inspired by Valhalla. Other rides include chair rides, swinging ships, driving schools and playgrounds. Overall there will be 30 attractions, although was originally meant to have 50. And it isn't fully open yet, according to guests, with some of the rides yet to be fully up and running. Inside Universal Epic Universe with incredible thrill rides and amazing food Said to want to rival Enerylandia, another theme park in Poland, some guests have been left less than impressed. One wrote: "This is supposed to be competition for Energylandia? 4 rollercoasters?" This is because Energlyandia has 18 rollercoasters which includes the world's largest hybrid coaster. Others said the ticket prices were too high for the lack of rides. Another wrote: "The park still has attractions under construction, so lets hope those will be more thrilling." Some parents said that the park is great for younger guests with lots for them to do, but that there was a lack of adult rides. Tickets cost 169PLN (£34.10) for guests over 120cm, or 1PLN (20p) for guests up to 85cm. Reduced tickets for anyone over the age of 65 or for pregnant guests are 149PLN (£30). This is for guests visiting during high season, from June 28 to August 31 with reduced tickets during the low season. The theme park will be open from 10am until 1pm in the summer season. Here is what it's like to go to Energylandia, according to a theme park expert. 3


The Sun
14 hours ago
- The Sun
New huge airport terminal to open in Europe's best value country as part of £210million renovation
A MAJOR airport is getting a huge new terminal as part of a multi-million pound expansion across the country. Zaha Hadid Architects (ZHA) will be designing Vilnius' new arrivals terminal with designs directly influenced by Lithuanian culture. 6 6 6 References to Lithuanian cultural heritage in the airport include geometric elements in the style of the traditional art forms like 'sodai straw gardens'. The Lithuanian art form involves making hanging ornaments from stalks. ZHA said: "Evoking the experience of being immersed within traditional sodai, the terminal's pleated roof finished in timber from local forests defines the interiors and reflects the art form's delicate, interconnected geometries." The timber roof will also feature geometric skylights. Works on the airport terminal will begin at the start of 2027 and are expected to be completed by the end of 2029. Once finished, the new terminal will allow the airport - which is currently at full capacity - to serve up to 10.6 million passengers each year. The new terminal is part of the Lithuanian Airports' 2052 masterplan to boost the region's connectivity to the rest of the globe, which will cost €250million (£213.8million) between now and 2052. Vilnius Airport is currently the largest airport in Lithuania and by 2052, around 17 million passengers are expected to use the airports in Vilnius, Kaunas, and Palanga, each year. Further development plans for Vilnius Airport include high-speed and local rail services, buses, taxis, cycle and pedestrian routes and increased direct flights from Vilnius. The airport also recently opened a new departure terminal in February increasing passenger throughput from 1,200 to 2,400 passengers per hour. The new £7billion mega terminal opening at Changi Airport The terminal has two floors, including a check-in area with a s elf-service baggage claim area, additional cafes and a connection to the existing passenger terminal by a gallery. Lithuania's Minister of Transport and Communications, Eugenijus Sabutis said: "The arrivals terminal of Vilnius Airport requires updating - it has long since ceased to meet today's needs or the airport's future capacity and vision. "As the gateway to Lithuania, the terminal creates the first impression for everyone arriving into the country. "The very high quality of ideas in the design competition proposed the most modern, convenient solutions that can adapt to the airport's future requirements." ZHA also won the contest to revamp the Lithuanian capital's main train station - which is just three kilometres from the airport. 6 6 Plans for the station which first opened in 1861, include a bridge-concourse above the tracks with footbridges and bike lanes, additional seating and trees and a new bus depot and car parking. In 2024, Vilnius was crowned as the cheapest-value city in Europe by the Post Office Travel Money City Costs Barometer. The survey compared 12 typical holiday items including a range of drinks, an evening meal for two with wine, a two-night stay at a three-star hotel, sightseeing experiences and transport. In total, Vilnius came in at £237 - which was over 10 per cent cheaper than the runner up, Lisbon. Lithuania was also recently named as one of Lonely Planet's top European destinations for 2025. A regional UK airport has also revealed a major masterplan with new flights to US and Middle East… and millions more passengers. Plus, a new UK airport terminal has opened after a £100million expansion and it now has faster security and more restaurants. 6


Daily Mail
2 days ago
- Daily Mail
Aussie sums up the most infuriating problem with Sydney - and most people would agree
An outraged commuter has slammed Sydney 's public transport system after she spent two and a half hours getting home due to cancellations. Monique, who shared her frustration on TikTok, said she was left stranded and forced to share an Uber with two strangers during peak-hour traffic as a result. 'Sydney trains need to be fixed, because every month I am deserted on a random platform with no idea how to get home,' she said. 'They literally took us forward, then dumped us here and said, hey we're not going to your destination anymore. 'Then we get out, we have to go back to the way we came. Get off at another station for them to say, there's literally no trains.' The commuter said there were no bus replacements. A staff member advised Monique and two other passengers to go to another platform and catch a train to Central Station, where they could catch another train home. 'We run to that platform, we miss it, and then everything else is cancelled after that,' Monique said. With no other option to get home, she booked an Uber, which was cancelled twice. Monique eventually shared an Uber with two strangers and travelled to a nearby station, hoping to reconnect with a functioning train line. One passenger was picked up by a family member, while another attempted to board a short, five-minute train journey, only to find that one service had been cancelled and the next wasn't scheduled for another 40 minutes. Monique then accepted a lift from a couple to her parked car. Social media users shared their own stories of frustration with one Penrith commuter saying it took them three and a half hours. One said it took them six and a half hours to travel from Warwick Farm to Burwood, while another said they spent $200 on alternative transport to get from Central Station to Parramatta. 'Two-and-a-half hours was stranded in Cabramatta, then a train finally shows up, takes us to Lidcombe, then a 400 to 500m line up for bus replacement,' one said. 'Sydney trains are a burden on Sydneysiders.' Another said Sydney's public transport was one of the 'worst in the world'. 'Something is always happening every month,' she said. Sydney's rail network has faced recurring service disruptions, delays, and infrastructure issues in recent months. In May, thousands of commuters across the city experienced two days of disruption when a train hit an overhead power line at Strathfield Station. In the same month, flooding across tracks caused major delays just as Vivid kicked off. NSW Premier Chris Minns said at the time $1.5billion a year was spent on rail infrastructure and maintenance, so punters should expect a more reliable network.