Queues of lorries and holidaymakers at Port of Dover
The vehicles are moving very slowly through Dover from the A20, and down Jubilee Way towards the port in Kent.
A spokesperson from the Port of Dover has said that the traffic into the port is currently causing delays of around an hour.
A traffic control system is in place, and one traffic warden told an eyewitness they had received a lot of verbal abuse from drivers on Thursday morning.
Doug Bannister, chief executive at the Port of Dover said his organisation has been 'preparing for a busy summer' and have brought in measures to 'minimise disruption'.
He said: 'We know how vital it is to keep things moving, not just for holidaymakers but for our local community too.
'That's why we've boosted staff levels, strengthened traffic management, added welfare facilities and introduced AI-powered forecasting – all to minimise disruption and ensure both residents and travellers have the best possible experience during this busy season.'
Port of Dover say they are expecting nearly 40,000 cars this weekend and more than 270,000 in the next six weeks.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles
Yahoo
40 minutes ago
- Yahoo
Plan to build new motorway services area beside M27
Planners are being urged to approve a multi-million-pound proposal to build a new motorway services area on the M27. Welcome Break Group has submitted an outline application to transform more than 30 acres of farmland land next to junction 11 at Fareham. The huge scheme incudes several food and drink outlets and almost 550 parking spaces, plus a children's play area and a dog walking zone. A planning statement that accompanies the application cites the current shortage of facilities for drivers in the region. "The absence of roadside service provision means the nationally prescribed safety and welfare provision for motorway/trunk road users is not being met." Drivers on the M27 will be provided with a new motorway service area if the scheme is approved (Image: Newsquest) The statement says the proposed development would create about 276 jobs once it was fully operational. "A further 27-28 jobs are likely to be created or supported by indirect or induced expenditure - services bought-in to the application site, or spending outside the site by employees." Citing the potential benefits of the scheme it adds: "The application should be approved without delay." READ MORE: M27 speed cameras: New 50mph sped limit will last until the end of 2025 Welcome has chosen a site on the northern side of the motorway next to the eastbound carriageway, but says the service area would also be accessible by westbound traffic. The main building would deliver a raft of facilities including shops, toilets, and showers. A petrol station and a drive-thru coffee shop are also planned. An aerial view of the proposed site, which is next to junction 11 of the M27 near Fareham (Image: Welcome Break/Google Earth) A design and access statement says the scheme would help meet the safety and welfare needs of motorists using the M27 and connecting roads. "The proposal would provide multiple food and drink offers and parking and fuelling facilities for both light vehicles and HGVs. Importantly, it would also offer much needed EV charging infrastructure." Jobs would be created both during the construction and operational phases of the project. READ MORE: Developer aims to transform Windhover Roundabout site next to M27 The planned development includes more than 50 EV charging points, plus 16 parking spaces for caravans, 16 for motorcycles, and 53 for HGVs. The scheme would also deliver seven coach bays. Apart from an isolated property at Boarhunt Road, the nearest homes are said to be 320 metres away at Downend Road. If the application is approved by Fareham Borough Council, a more detailed proposal would also have to be given the green light before work could start.


CBS News
5 hours ago
- CBS News
Semi-trailer truck, at least 2 cars involved in serious crash on I-80/94 in south Chicago suburbs
Multiple cars and a semi-tractor trailer were involved in a catastrophic crash at the junction of I-80/94 and Illinois Route 394 in the south Chicago suburb of Lansing. The truck sustained major front-end damage, and two cars were demolished. One of the cars had a white sheet over it, indicating that someone inside had died. All traffic coming off the Tri-State Tollway (I-294) onto eastbound I-80/94 was held up at the scene. Some semi-trailer trucks were able to get by on the right shoulder. Details on the crash were not immediately available.
Yahoo
7 hours ago
- Yahoo
This Bonkers Underwater Jetpack Lets You Zip Through the Water Like a Dolphin
CudaJet has made soaring through the seas as simple as putting on a backpack. The British company has unveiled a new underwater jetpack that allows you to zip through the water at speeds of up to roughly 7 mph. (That probably feels much faster than it sounds.) More from Robb Report Global Auction Sales Dropped 6% in the First Half of 2025: Report Goose Island Just Unveiled the 2025 Lineup for Its Cult-Favorite Bourbon County Stout Maserati and Alfa Romeo Might Team Up on a New Supercar With a Manual Transmission The all-electric hydrodynamic device is the brainchild of Archie O'Brien. The British designer developed the first 'Cuda' prototype in 2018, putting in a further 30,000 hours of development before releasing the first commercial version in 2023. The design has been further refined since, with the 2025 edition being lighter and more juiced-up than previous models. The underwater jetpack is entirely hands-free, unlike Seabobs and other sea scooters that require a tight grip. The backpack-like design, which weighs around 31 pounds all up, allows you to dive and spin like a dolphin at a speed of nine feet per second. The harness itself is made of heavy-duty fabric, with a high-grade limestone neoprene wrapping around the body. The back panel incorporates a carbon fiber skeleton to help everything stay stiff and secure against the thrust. Speaking of which, the jetpack is equipped with a patented propulsion system that generates nearly 90 pounds of thrust. The electric motor drives a specially designed impeller that produces a powerful water jet, displacing about four gallons of water per second and pushing the user forward with remarkable force. Rated to 131 feet (40 meters), the jetpack is fitted with a 1 kWh lithium polymer battery that enables about 90 minutes of diving and can be fully charged in 75 minutes. The jetpack is connected to an ergonomic controller with a full-color, hardened display that shows your performance, battery levels, and current depth. The brand says the system is intuitive, requiring only about five minutes of use before the diver becomes comfortable. CudaJet is not the only one making this style of underwater jetpack—XiaoTun recently launched a Kickstarter campaign for a similar but slightly more affordable device—but the British company claims it created the world's first. The jetpacks are made to order in the U.K., with a three-month lead time required for each. The regular 2025 model is priced at $30,778. CudaJet has also released a premium Founder's Edition. Limited to 20, this exclusive numbered edition showcases a distinctive livery that combines jet black with gold highlights and a shimmering top coat. It also includes a lifetime warranty, in-water training, and first access to future products. CudaJet hasn't listed a price for the Founder's Edition, but says only 14 units are remaining. Click here to read the full article.