logo
Check dams, causeway across Kaundinya river in Vellore inaugurated

Check dams, causeway across Kaundinya river in Vellore inaugurated

The Hindu27-05-2025
Minister for Water Resources Duraimurugan inaugurated two check dams and a causeway with vents across Kaundinya river in Gudiyatham to prevent flooding during monsoon, and provide access to key towns.
The Minister was accompanied by Collector V.R. Subbulaxmi, and senior officials of the Water Resources Department (WRD).
'The check dams will help irrigate at least 560 hectares of farmlands in the region. Moreover, local bodies can sink borewells along the facilities to draw water for consumption,' S. Kalipriyarn, Assistant Engineer, WRD (Gudiyatham), told The Hindu.
Funded by NABARD under the Permanent Floods Restoration Scheme 2023-24, the check dams were built at a cost of ₹25 crore. Each 120-metre-long and 1.2-metre-tall facility has a capacity of 2.51 mcft (million cubic feet) and can discharge 53,000 cusecs of floodwater.
They will help recharge at least 530 farmwells in the region. Around 10-12 farming villages will benefit as groundwater within a three-km radius from the facilities would increase.
After a long struggle, residents in Gudiyatham and adjoining farming villages now have a causeway, built at a cost of ₹8.41 crore using funds from NABARD. It connects Thalayatham with Sunnabupettai village across the river.
The causeway measures 104.2 metres in length and 2.7 metres in height (from the riverbed) with 10 vents. It can discharge 58,000 cusecs per minute of floodwater during monsoon. Officials said such high discharge of rainwater would prevent the facility from being flooded.
'Earlier, we had to take a detour of at least 20 km to reach Gudiyatham, Pernambut, and Pallikonda towns. School vans and ambulances had to navigate a long sandy route. The new bridge has ended our ordeal,' S. Pechiammal, a resident, said.
A 500-metre-long tiled walking track was also inaugurated. It was built at a cost of ₹2.91 crore on the left bund of the river. Steel fencing has been erected to prevent accidents, officials say.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

NABARD-funded check dam transforms Channi-Mansar Panchayat; revives agriculture in Udhampur
NABARD-funded check dam transforms Channi-Mansar Panchayat; revives agriculture in Udhampur

India Gazette

time3 days ago

  • India Gazette

NABARD-funded check dam transforms Channi-Mansar Panchayat; revives agriculture in Udhampur

Udhampur (Jammu and Kashmir) [India], July 11 (ANI): A newly constructed check dam under the Channi-Mansar Watershed Project has brought relief and renewed hope to farmers in the water-deprived Channi-Mansar Panchayat of Udhampur district. Funded by the National Bank for Agriculture and Rural Development (NABARD) at an estimated cost of Rs. 4.54 Lakh, the dam has addressed the acute water scarcity that had forced many farmers to abandon their fields. The project, aimed at soil and water conservation, has not only rejuvenated agricultural activities but also strengthened the socio-economic fabric of the village. NABARD district In-charge Siddharth said, ' A few days ago, we conducted a training for self-help groups for 30 women on bee-keeping... We also helped them with credit-linking under schemes like HADP (Holistic Agriculture Development Program). We are running Tribal Development Program... A lot of things were also conducted under the Water-Shed Program under which a well and a check dam were constructed and these are benefitting local residents in Channi-Mansar region... We provide trainings under the self-reliant schemes of PM Modi... NABARD works here in two ways - Spring-Shed, which is for reviving old water springs; and Water-Shed, which is for water and soil conservation... We are getting complete support from the state and central government...'. For years, the hilly terrain of Channi-Mansar Panchayat lacked proper water storage facilities, causing rainwater to drain away without being utilized. As a result, vast stretches of farmland turned barren, leaving farmers unable to cultivate seasonal crops. Many were compelled to leave agriculture, worsening the region's economic condition. However, the newly constructed check dam has changed the scenario by effectively harvesting rainwater, ensuring sustained irrigation for crops. A beneficiary farmer said yesterday, 'This check dam has been made after our appeal... Due to this, we have water for our crops... We thank NABARD and the Water-Shed Chairman for this dam... Even the domestic and wild animals get water for drinking from this...'. Villagers have expressed immense gratitude towards NABARD and the Government of India for the watershed project, which has not only mitigated drought-like conditions but also enhanced agricultural productivity. Farmers can now grow multiple seasonal crops, significantly boosting their income. The project has also played a crucial role in preventing soil erosion and improving groundwater levels, ensuring long-term benefits for the community. Water-Shed Project Chairman Purshotam Kumar said, 'This has benefitted a lot of people in the region... This check dam will provide water to the people, as well as animals, as they used to be deprived of it during summers... We faced a minor leak issue in March, but we got it repaired... The government of India is also appreciating this project as they promote water conservation... We also made a water observation trench for the same purpose. We request that the government provide us with more such schemes...'. (ANI)

Madurantakam tank, one of the ancient and large water bodies in Chengalpattu district, set for a makeover by September
Madurantakam tank, one of the ancient and large water bodies in Chengalpattu district, set for a makeover by September

The Hindu

time4 days ago

  • The Hindu

Madurantakam tank, one of the ancient and large water bodies in Chengalpattu district, set for a makeover by September

Madurantakam tank, one of the largest water bodies in Chengalpattu district, will finally receive its long-awaited makeover. The Water Resource Department is set to restore the water body with an additional storage capacity in two months and reduce inundation in surrounding localities. The tank, which has a historical significance and constructed across the Kiliyar river (Palar river's tributary), is undergoing a major restoration worth nearly Rs.172.66 crore after several years. Though the work was initiated in June 2022, the project has missed a few deadlines in the past two years. They wanted the works to be completed soon as it was a vital source of drinking water and irrigation needs for several villages in Madurantakam. an organic farmer in Madurantakam, said, 'My house is within one km from the tank. The dried-up water body last year had an impact on groundwater level that dropped by up to 10 feet. This year, the tank has water. It must be rejuvenated soon to help irrigate lands in villages dependent on it.' Spread over 1,058 hectares, the tank would soon be able to store nearly 791 million cubic feet once the work is completed. According to the department, extreme weather events between 2022 and 2024, including cyclone Michaung, pushed the deadline beyond two years. The deadline was extended to September 2025 to complete the work. Officials of the WRD said the tank would have an enhanced storage capacity after 1985-86. Nearly 90% of the work, including deepening the tank bed, repairing damaged sluices and forming new foreshore bund for 18.5 km, has been finished so far. The foreshore bund would prevent inundation of agricultural lands in the vicinity. The tank's weirs have been remodelled to facilitate more storage space. 'We have completed 92% of the work to construct a spillway with 12 radial shutters. This will be a dam-like structure to control release of floodwater when the tank touches its full level. It will have a capacity to discharge up to 1.12 lakh cubic feet per second of water,' said an official. The department has also accelerated work to improve Nelvoy Maduvu channel and Kiliyar river, which bring water to Madurantakam tank. The project is expected to improve access of drinking water to 38 villages, including Vedanthangal and Pudupattu, and irrigate nearly 3,077.47 hectare of land three times a year. The facelift would also revive the tank as a habitat for migratory birds. There are also plans to add recreational facilities along with the Tourism department in the second phase.

Minister Duraimurugan inaugurates built at a cost of ₹24.82 crore dyke across Palar near Katpadi
Minister Duraimurugan inaugurates built at a cost of ₹24.82 crore dyke across Palar near Katpadi

The Hindu

time4 days ago

  • The Hindu

Minister Duraimurugan inaugurates built at a cost of ₹24.82 crore dyke across Palar near Katpadi

Minister for Water Resources Duraimurugan inaugurated the ₹24.82 crore new dyke built across the Palar river at Arumparuthi village near Katpadi in Vellore on Wednesday, ending a long-standing demand of farmers in the region. Officials of the Water Resources Department (WRD), which executed the work, said that the new dyke at Arumparuthi is among the five dykes built at Katpadi and Gudiyatham taluk across the Palar river and its tributary, Malataru, in Vellore. 'The new facility will help us to cultivate at least three seasons in a year. It also contributes to the depletion of water resources in the area,' said K. Vembu, a farmer. Other new dykes are being built at Shenbakkam (Vellore Corporation), Kugaiyanallore, Masigam villages in the district. In Ranipet, a dyke at Thiruparkadal village near Walajah town is under construction. Among these, the dyke at Thiruparkadal village is the longest facility (1,345 metres), whereas the dyke in Masigam village near Katpadi across Malataru river is the shortest one (220 metres). 'Dykes help to store excess rainwater that gets discharged into the Palar river. Such a facility was built depending on the depletion of the groundwater level in identified areas along the river,' R. Ramkumar, Assistant Engineer (AE), PWD (Katpadi), told The Hindu. On average, each dyke helps to recharge groundwater for about three-km radius around the facility. It will help to irrigate around 20,000 hectares of farmland in at least 30 villages. Paddy is the chief crop in these villages due to less water usage. Built under the National Agriculture Development Scheme, the new dyke at Arumparuthi village is 720 metres long, 85 metres wide across the river and eight metres in depth. Apart from irrigation, the new dyke helps to recharge 251 farmwells in Katpadi area. It will also increase the groundwater level to a distance of at least three km in its vicinity. WRD officials said that at present, civic bodies, including Vellore Corporation, have borewells near the new dyke to draw water for domestic consumption. The new facility will help to increase water level in these bore wells.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store