Decades worth of paint to be stripped off Macdonald Bridge towers
A news release Monday said the work, dubbed Project LifeSpan, will involve stripping the towers bare of accumulated paint to allow for "thorough inspections and any required repairs to ensure their structural integrity for the next 70 years."
The towers will be wrapped in a protective enclosure to prevent paint chips, spray and debris from falling into the harbour or onto the bridge or nearby properties while painters and steelworkers are working, Steve Proctor, a spokesperson for Halifax Harbour Bridges, told CBC News in a telephone interview.
The Dartmouth tower will be finished this year and the Halifax tower is expected to be completed in 2026.
The project will require four weekend closures of the Macdonald Bridge — also known as the Old Bridge — this year for the construction and removal of a platform that will separate the work area from traffic on the bridge deck, the news release said.
Upcoming weekend closures
The first closure will begin Friday, April 25, at 7 p.m. Proctor anticipates the second closure will be in May, depending on how the first proceeds. The other two will likely be in November and December, he said.
Halifax Harbour Bridges says the A. Murray MacKay Bridge will always be open when the Macdonald is closed.
Proctor said other parts of the Macdonald Bridge have had paint previously stripped off, but it will be the first time for the towers since the span opened in 1955.
Given the salt water conditions and years of layering paint in spot touch-ups and small repairs, "there's bound to be moisture underneath there so there definitely will be some corrosion that they're going to have to look after," Proctor said.
The two-year project is valued at about $70 million, 85 people will work on it and 95 per cent of the supplies will be bought in Nova Scotia, Halifax Harbour Bridges said.
Price tag includes both years, paint and repairs
Proctor said the $70 million includes both years of the project, the repairs and the new paint.
He said the project has been in the works for three years.
Liberty Blastech, a Nova Scotia joint venture company, was selected to do the work. Halifax Harbour Bridges notes the company's partners "have extensive experience painting bridges."
"Doing painting removal at 90 metres above sea level requires a certain level of skilled individual, so this company has that skill, has Nova Scotia painters working with them, Nova Scotia supplies, that kind of thing," Proctor said.
Keeping eyes on the road
More than 40,000 cars, small trucks and buses cross the Macdonald Bridge daily.
While the work is being undertaken, Halifax Harbour Bridges is urging people to drive carefully.
"Because while it will be an intriguing situation to see dozens of people climbing up the tower, you have to pay attention to your driving," Proctor said.
MORE TOP STORIES

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles
Yahoo
8 hours ago
- Yahoo
One departed minister received now-cancelled cabinet cash allowance, premier's office says
Andrew Parsons left provincial politics in May, after serving as an MHA since 2011 and a cabinet minister since 2015. (Mike Simms/CBC - image credit) One now-retired politician availed of a new transitional allowance for outgoing cabinet ministers that was rescinded hours after being revealed by CBC News on Friday. Late Tuesday afternoon, the premier's office confirmed details of payments made under the now-cancelled policy. Those details were first reported by the business and political news website allNewfoundlandLabrador. Former energy minister Andrew Parsons "resigned while the policy was in place and has therefore received the cabinet transitional allowance," Sonja Pomeroy, a spokesperson for the premier's office, wrote in an emailed statement. ADVERTISEMENT Parsons would have been eligible for an allowance payment of around $37,000. According to Pomeroy, former premier Andrew Furey "has not received the cabinet transitional allowance and has asked that he not receive it." He had been eligible under the policy. Neither Parsons nor Furey has provided comment. Policy rescinded hours after airing of CBC report On Friday morning, CBC News revealed that the provincial cabinet had quietly approved a new transitional allowance policy for departing ministers, which came into effect April 1. It provided one month's ministerial salary for each year of service in cabinet, on a prorated basis, for a minimum of three months and a maximum of 12 months. For ministers, that worked out to a minimum payout of around $12,000, up to the full annual salary of $48,664. John Hogan left cabinet in March to run for the provincial Liberal leadership. He won, and was sworn in as Newfoundland and Labrador's 15th premier in May. (Mark Quinn/CBC) The revelation of the new payment to outgoing cabinet ministers, approved just months before an election, generated immediate public controversy. Six current cabinet ministers have indicated they plan to retire when voters go to the polls. ADVERTISEMENT On Friday afternoon, Premier John Hogan announced that cabinet had met and decided to "immediately rescind" the policy, which had never been publicly disclosed. Hogan stressed that he was not in cabinet when the policy was approved, and was not involved in that decision. In an open letter to Hogan on Monday, Opposition Leader Tony Wakeham was skeptical about that explanation. "Setting aside how difficult it is to believe that the public service would not brief a new premier on issues of compensation for cabinet, your statement raises more questions than it provides answers," Wakeham wrote. The PC leader said any cabinet minister who voted to approve the allowance should be removed from the Liberal slate of candidates in the coming election. PC Leader Tony Wakeham, left, and NDP Leader Jim Dinn have both been sharply critical of the now-cancelled allowance for departing ministers and how it has been handled. (Jeremy Eaton/CBC) Meanwhile, NDP Leader Jim Dinn called on Hogan to disclose exactly who supported the decision. ADVERTISEMENT "None of these ministers are living paycheque to paycheque," Dinn said in a press release Tuesday. "To make such a selfish decision after hearing firsthand how much people are struggling is nothing short of greed." Download our free CBC News app to sign up for push alerts for CBC Newfoundland and Labrador. Sign up for our daily headlines newsletter here.
Yahoo
2 days ago
- Yahoo
She's fought for clean water for years and fears proposed Ontario permit changes will hurt First Nations
Makasa Looking Horse Henry remembers the moment she learned some people in her community had never tasted clean tap water. "A lot of people have to rely on buying water, not having any hooked-up water, piped-in water and running water in their households," she said. "This is a huge stressor on Indigenous women's mental health and Indigenous families' mental health." For the past eight years, Henry has fought for water sovereignty in a place that's been her home her entire life, Six Nations of the Grand River, which is near Brantford and is home to people from all six Haudenosaunee nations. Now, Henry says, a proposed regulation from the Ontario government could roll back years of advocacy and sideline voices of Indigenous communities like hers. "It's honestly really, really disappointing and disheartening," she said. It feels as if the proposal is designed to "keep Indigenous Peoples out of the decision-making from water extraction, and governing our own waters and governing our own lands," Henry added. The proposed regulation Under the province's current regulations, companies that want to extract groundwater must apply for a permit to take water, triggering environmental assessments, public consultation, a review of the purpose for taking water and a duty to consult Indigenous communities. Businesses that might want to take groundwater include agriculture, gravel mining and water-bottling plants. The proposed regulation would allow those permits to be transferred from one company to another without reapplying, so long as the intended use for the water and amount taken stays the same or declines. That means a business could be sold to a new owner who could inherit the water rights with minimal additional review. In an emailed statement from a Ministry of the Environment spokesperson, the province said this streamlines the permit approval process, potentially cutting months off the current approval wait time. The ministry said it would also continue to review all applicants in the streamlined process to ensure requirements are met. But according to critics, such changes to the process would bypass meaningful environmental checks. What's at stake Arlene Slocombe, executive director of Wellington Water Watchers, shares Henry's concerns. "The [Premier Doug] Ford government wants to make water-taking permits transferrable, meaning no input, no consent and no accountability if corporate ownership changes hands," she said in a phone interview with CBC News. "This move to change the water-taking permit process is essentially a water-grabbing tactic that would make water-taking permits functionally and potentially eternal once approved." Slocombe warns the regulation could lead to unchecked withdrawals from groundwater systems with unknown limits. "It's essentially like writing checks on a bank account that you don't know the balance of, and at some point, you run out," she said. "Nobody's really tallying exactly when that 'zero' mark happens." Slocombe said while most municipal wells supplying houses and businesses eventually return water to the watershed, facilities like bottling plants could permanently remove it by shipping it beyond the local ecosystem. Another major concern is the removal of the 30-day public comment period that currently accompanies water-taking applications. Slocombe said that when BlueTriton applied for its permit to run its Aberfoyle water-bottling operation, more than 32,000 people submitted feedback. Under the new rules, a permit transfer would not require any public input. Nor would it require consultation with Indigenous groups. "Again, something else that they're trying to push and take our voices out of the entire conversation," said Henry. "We're not going anywhere and they need to respect us as sovereign nations." The economics of water-taking Roy Brouwer, executive director of the University of Waterloo's Water Institute and an economics professor, said the province is undervaluing the true cost of its water. He said that when he moved to Waterloo region a decade or so ago, the cost was under $5 for 1,000 cubic metres of water (one million litres). Since then, the cost has increased, but not in a way that reflects limited supply or environmental impact. "They just added $500 like a round number, $500 on the permit," he said. "It has all the appearances of an administrative fee. And it doesn't necessarily reflect the scarcity costs of the resource now and into the future, benefiting multiple users," said Brouwer. He believes the transfer system, as proposed, ignores the fact that water is limited. Brouwer said he's also concerned about the environmental impact. "Over time … what you initially identified as a maybe limited or moderate ecological risk is perhaps a bigger risk because you actually do the pumping and you can actually observe what is happening to the natural environment." The fight in Aberfoyle Henry was a vocal critic of the former Nestlé bottling plant in Aberfoyle, later sold to BlueTriton and now owned by Ice River Springs. Despite it being part of the application process, indigenous consultation was minimal. "Nobody knew in my community that water extraction … was happening. And with the lack of consultation, not even the governments knew that that was happening either," she said. "Our people had no idea." Over the years, she's held groundwater awareness rallies — sometimes by herself — and delivered cease-and-desist letters on behalf of her band council. She said she secured those by "going to meetings at our long house and letting our clan mothers, faith keepers and chiefs know what was happening. And so they said deliver the cease-and-desist to them. And so that's what I did." Ice River Springs, an Ontario-based bottling company and the newest owner of the Aberfoyle water-bottling facility, has yet to apply for its water-taking permit. In an emailed statement to CBC News, executive vice-president and co-owner Sandy Gott said the company "supports initiatives that maintain environmental protection" and it would do its work "with respect for the communities in which [they] operate." Concerns about being cut out The public comment period for Ontario's proposed water permit regulation runs until Aug. 1. After that, it moves to a review and decision stage. There is no fixed timeline for when a final decision will be made. Henry said she's concerned about being cut out of the process entirely. "Right now, they're trying to take every single thing that they can and they're trying to take more water," she said. "And so we're just trying to fight with everything we have to protect our waters and our lands. They go hand in hand."
Yahoo
5 days ago
- Yahoo
Grieg Seafood sells operations in Canada and northern Norway
Grieg Seafood has sold its operations in Canada and northern Norway to Cermaq — a global salmon farming company based out of Oslo. The sale includes assets and operations in Marystown, on Newfoundland's Burin Peninsula. The company employs 110 people in the community, operating 14 seawater licences in Placentia Bay and a land-based freshwater facility with offices in Marystown. In a news release on Thursday, Grieg said Cermaq is "well placed to take the Newfoundland region further." "Cermaq shares our values of farming with the lowest possible environmental impact and highest possible fish welfare, as well as of respecting and contributing to the rural and Indigenous communities where the operations take place," wrote company CEO Nina Willumsen. "We are confident that the region is in the best hands and that it will continue to create local value long into the future." In February, Grieg hit pause on its plans to expand the large-scale salmon operation in Marystown. The decision was largely driven by an inability to find a financing partner and the threat of economic tariffs from the United States. Construction of the 17,500-square-metre post-smolt facility had also been delayed in October 2020 due to the COVID-19 pandemic. Grieg's first harvest from Placentia Bay came in 2023 with roughly 5,000 tonnes of salmon. The company told CBC News on Thursday it would not do interviews. Download our free CBC News app to sign up for push alerts for CBC Newfoundland and Labrador. Sign up for our daily headlines newsletter here. Click here to visit our landing page.