
Te Arawa's Mākereti Papakura to receive posthumous degree from Oxford University
In her groundbreaking research for her studies at Oxford, she explored the customs of her people of Te Arawa from a female perspective, the school said.
Her scholarship, combined with her indigenous worldview, earned her the respect of many Oxford academics at the time, and went on to be celebrated by members of Māori communities and researchers worldwide.
Papakura died in 1930, just weeks before she was due to present her thesis.
With the agreement of her family, her good friend, Rhodes Scholar and fellow Oxford anthropologist TK Penniman, posthumously published her work, in a book titled The Old-Time Māori. It became the first ethnographic study published by a Māori author and was recognised as such by the New Zealand Royal Society.
The School of Anthropology and Museum Ethnography applied to the University of Oxford's Education Committee to request that Papakura be posthumously awarded the degree of Master of Philosophy in Anthropology.
The application was supported by St Anne's College and the Pitt Rivers Museum, to which Papakura and her family donated numerous artefacts and papers both during her lifetime and after her death. The Education Committee's decision to grant the request was been warmly welcomed both in Oxford and in Aotearoa New Zealand, the school said.
The degree would be awarded at a ceremony presided over by the university's vice-chancellor later this year in Oxford's Sheldonian theatre. Members of Papakura's family and representatives of the Māori community were expected to attend.
Professor Clare Harris, Head of the School of Anthropology and Museum Ethnography, said they were delighted that the 'extraordinary achievements of Mākereti, the first indigenous woman to study at Oxford', had been recognised by the University of Oxford with the award of a posthumous MPhil degree.
'Mākereti is an inspiring figure, not only to many in Aotearoa New Zealand but to students and scholars around the world.'
June Northcroft Grant, on behalf of Papakura's family and tribe (Tūhourangi – Ngāti Wāhiao), said: 'We are grateful to Oxford University for this tribute to Mākereti's memory and to all those who have supported her story in the years since her passing. It is a testament to the lasting power of education, culture, and the determination of one woman to ensure that Māori stories would not be forgotten.
'We have always known the sacrifices she made to pursue education and the strength it took for her to continue, often in the face of considerable challenges.
'We are especially humbled that her customary tribal practices and the scholarship she possessed have been acknowledged with such careful and respectful consideration by the university's Education Committee.
'This recognition belongs to Mākereti, to our ancestors, and to the Māori community worldwide.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


NZ Herald
14 hours ago
- NZ Herald
Gisborne District Council's Natural Heritage Fund open for applications
Applications are open for an annual fund for efforts aimed at protecting native biodiversity. The Natural Heritage Fund, administered by Gisborne District Council, is open for 2026 projects. 'Private landowners or kaitiaki of whenua Māori in the district and who work to protect or enhance indigenous biodiversity —


NZ Herald
3 days ago
- NZ Herald
Rotorua conference unveils te reo Māori subject association
A new te reo Māori subject association has been launched as another means to strengthen the community of Māori educators, who say they can feel isolated. The announcement was part of the 30th annual Post Primary Teachers' Association/Te Wehengarua (PPTA) Māori Teachers' Conference held on July 6 and 7 in


Scoop
7 days ago
- Scoop
Streetworks Start In Preparation For Te Ngākau Civic Precinct Reopening
Press Release – Wellington City Council The combination of these different projects is likely to cause some disruption for Wellington residents, businesses and visitors during this period, but a coordinated approach will minimise the impact. As part of the Te Ngākau Civic Precinct project, coordinated streetworks are starting in the area in preparation for the reopening of the space in March 2026. Te Ngākau, translated in te reo Māori as 'The Heart', is home to the capital's most important arts, cultural and performance venues. It also connects the central city and the waterfront, acting as a gateway to the harbour. The scheduled streetworks are a coordinated approach of projects, maintenance and improvements to infrastructure by Wellington City Council, Wellington Water, and utility companies. The combination of these different projects is likely to cause some disruption for Wellington residents, businesses and visitors during this period, but a coordinated approach will minimise the impact. Upcoming streetworks projects: 7 July – end of 2025 – Wellington Water – Wakefield Street rising main project The section of Wakefield Street from Taranaki Street to Cuba Street will be one lane only (the westbound lane will remain open). Access for residents and businesses will remain. 14 July – 21 July 2025 – Wellington Water – Victoria Street rising main project The intersection of Mercer St, Victoria St and Wakefield St will be closed to traffic. Pedestrian access will remain. There will be controlled vehicle access to garages on Victoria Street. Victoria Street traffic will be diverted down Harris Street to Jervois Quay. Late July (Date TBC) – r emoval of Amora overbridge, Wakefield Street To safely remove this bridge, the section of road underneath needs to be closed in both directions for 48 hours. This work is expected to take place on a weekend near the end of July, date will be confirmed soon. August 2025 – January 2026 – Wellington Water – Market Lane pump station renewal Project Market Lane will be closed to traffic at the Taranaki Street end and there will be a two-way entrance at the Cable Street end. Parallel parks along the southern side of Market Lane will be removed during this time. Pedestrian access will be unaffected. Start of August – end of November 2025 – Wellington Water – Willeston Street pump station renewal and Victoria Street rising main project The eastern lane of Victoria Street between Willeston Street and Harris Street will close to vehicles. The intersection of Willeston Street and Victoria Street will also be closed to vehicles, although the Victoria Street Wilson Parking Building will remain open. Pedestrian access will remain throughout. Oct 2025 – Feb 2026 – Harris Street upgrade Harris Street kerb and channel upgrade, along with landscaping and resurfacing. One-way eastbound vehicle access will remain during this time, and access to the Central Police Station will remain. More information, downloadable maps and updates available at About Te Ngākau Civic Precinct Te Ngākau Civic Precinct includes Te Whare Whakarauika Town Hall, Te Matapihi ki te Ao Nui Central Library, the site of the old Civic Administration Building (CAB) and Municipal Office Building (MOB), City Gallery, City to Sea Bridge, Michael Fowler Centre, former Capital E building, Civic Basement, Creche, Jack Ilott Green, and 110 Jervois Quay. Te Ngākau is a place that Wellingtonians love, but it has been in a state of transition for a long time. The precinct was significantly impacted during the 2013 and 2016 earthquakes, resulting in seismic resilience issues for many of the buildings and structures. Some have been strengthened and redeveloped, some have been demolished to make way for new things, and the future of some is still to be decided. The area also faces challenges around resilience to future flooding events, which may become more frequent over time due to climate change and sea level rise. Te Matapihi Central Library – practical completion Aug 2025, landscaping complete Oct 2025, opening March 2026 Te Whare Whakarauika Town Hall – project completion – July 2026 – reopening early 2027 TBD City Gallery – project completion March 2026 – reopening August 2026 TBD City to Sea Bridge – TBD pending judicial review outcome Wellington Town Hall Annex development – September 2025 – July 2026 CAB site activation – July 2026 – Early 2027 Harris Street upgrade – construction from Oct 2025 to March 2026 Wakefield Street upgrade – construction April 2026 – October 2026 TBD Civic basement strengthening and plaza landscaping – complete and open by March 2026.