logo
Vizag Metro Rail to have two metro depots, near VIMS and Vizag Port

Vizag Metro Rail to have two metro depots, near VIMS and Vizag Port

The Hindu24-06-2025
As part of the Vizag Metro Rail (VMR) project, two Metro Rail Depots (MRD) are proposed to be set up at two different locations, Old Dairy Farm (ODF) near Visakhapatnam Institute of Medical Sciences (VIMS), and near Visakhapatnam Port Authority (VPA), in the city.
In particular, the Metro Depot is a crucial part of infrastructure that ensures the efficient and safe operation of the metro system.
The MRD is a facility that stores, maintains and repairs metro trains/cars. It serves as an operational base for the metro system, providing parking, servicing and administrative functions. The depots are equipped with various facilities including inspection lines, maintenance workshops and train wash plants. They are also storage centres to keep the train coaches/cars when they are not in service, ensuring that they are readily available for the next operational period.
This MRD also serves as a central hub for train movements like shunting and manning. Depots often have administrative offices to manage metro operations and staff.
For this, each depot requires at least 35 to 40 acres of land.
The VMR requires about 100 (99.75) acres of land for the entire 46.23 km phase-1 on the three corridors in the city. The potential investment for land alone is about ₹890 crore.
As part of the land acquisition process, a social impact assessment (SIA) is currently being conducted. The land requirement includes about nine acres of private land and about 87 acres of government land. Visakhapatnam district authorities are currently working on it with the SIA team, as per the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement (RFCTLARR) Act, 2013.
The SIA survey was officially announced on May 30, 2025, through an official notification by the district Collector's office. The SIA aims to verify the public interest of the project, land requirement, explore alternative land options and impact on local food security.
According to the data submitted by A.P. Metro Rail Corporation (APMRC), the land to be acquired or alienated includes more than 9 acres of private land, and 87 acres of government land (36 acres of VPT, 4 acres of railways, 47 acres Animal Husbandry and other departments at the Old Dairy Farm, and less than one acre of D-patta houses.
'Yes, the Visakhapatnam district administration is currently working on land allocation related works. We are waiting for a call from the Visakhapatnam Collector, who may receive the final SIA report soon,' APMRC Managing Director N.P Ramakrishna Reddy told The Hindu on June 23 (Monday).
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Fair compensation act restricts multi-crop land acquisition: Minister
Fair compensation act restricts multi-crop land acquisition: Minister

Time of India

time4 hours ago

  • Time of India

Fair compensation act restricts multi-crop land acquisition: Minister

Bathinda: Union minister of state for agriculture Ramnath Thakur has made it clear that land can be acquired for public purposes under the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement (RFCTLARR) Act, 2013, but its Section 10 restricts the acquisition of multi-crop irrigated land, unless in exceptional cases where no alternative land is available. The Act came into force on Jan 1, 2014. The statement was made in a written reply to a question from Bathinda MP Harsimrat Kaur Badal on Tuesday. The response comes amid a controversy in Punjab, where the state govt's land pooling policy aiming to acquire nearly 65,000 acres of fertile land, is facing opposition from farmers. The minister said that data on conversion of agricultural land for non-agricultural purposes is maintained at the state level, as land is a state subject. However, the RFCTLARR Act strongly discourages such conversions. To mitigate the impact on farmers, the Act provides for compensatory mechanisms, including monetary compensation, rehabilitation and resettlement benefits, and in some cases, land-for-land compensation, according to the minister. Despite a marginal decline in cultivable land, Thakur provided a positive outlook on the agriculture sector's performance. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like This Tiny Hearing Aid is Transforming Lives Across The UK Hear True Learn More Undo Citing the "Land Use Statistics-at a Glance 2023-24" report, he stated that the net sown area has remained relatively stable. Further, the gross cropped area has expanded significantly, rising from 201.3 million hectares in 2013-14 to 217.8 million hectares in 2023-24. Implementation of various govt initiatives and technological advancements have contributed to a continuous rise in cropping intensity. Harsimrat's question sought details on whether the govt acknowledged the decline in agricultural land, the factors contributing to it, and the specific steps taken to prevent the diversion of agricultural land for non-agricultural purposes.

Land acquired for public projects cannot be reclaimed by owners: HC
Land acquired for public projects cannot be reclaimed by owners: HC

Time of India

time5 days ago

  • Time of India

Land acquired for public projects cannot be reclaimed by owners: HC

Hyderabad: Telangana high court on Thursday clarified that land once acquired for public projects cannot be claimed back by the property owners on the grounds that it has not been fully utilised for the purpose, even if the owners are willing to return the compensation. A division bench, comprising Chief Justice Aparesh Kumar Singh and Justice GM Mohiuddin, made these observations while hearing a writ appeal challenging an earlier order of the court dismissing the land owner's request to hand over the unutilised land in connection with land acquired in Datarpalli village, Gajwel of Siddipet district for the Pranahitha Chevella irrigation project. The judges said they did not find any error in the earlier high court judgement, and in the absence of any provisions in the Act as urged by the petitioner, they cannot entertain such an appeal. You Can Also Check: Hyderabad AQI | Weather in Hyderabad | Bank Holidays in Hyderabad | Public Holidays in Hyderabad The high court had in Oct 2024 dismissed a petition filed by Andalu, whose 1.08 acre land was acquired in 2012 for the Pranahitha-Chevella project. She contended that only 18 guntas of the land was used and sought the return of the unused 30 guntas, offering to pay for it. The court held that the land was acquired under the Land Acquisition Act, 1894, which does not contain any provision for the return of unutilised land, unlike the 2013 (Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement) Act. Since the acquisition was completed before the 2013 Act came into force, and compensation was already paid and possession taken, the petitioner could not claim the land back, the court said.

Edappally Canal development hits land hurdle
Edappally Canal development hits land hurdle

Time of India

time6 days ago

  • Time of India

Edappally Canal development hits land hurdle

Kochi: Development of Edappally Canal under Integrated Urban Regeneration and Water Transport System (IURWTS) project is yet to begin as revenue authorities are yet to hand over the land to Kochi Metro Rail Ltd (KMRL). State govt recently granted administrative approval for the Rs 3,700-cr IURWTS project of KMRL, which aims to revitalize six canals in the city, including Edappally Canal. Though district administration completed social impact assessment (SIA) study for land acquisition for the canal widening works, the handing over of land is delayed indefinitely due to various reasons, including local protests against the survey process. The IURWTS project envisages acquisition of 42.67 hectares required for widening the canal to the required width of 16.5m. KMRL, after conducting detailed flood plain modelling, duly vetted by CWPRS Pune, ascertained the width requirement based on flood containment capacity and navigation requirements. KMRL has also taken into consideration high court orders pertaining to the canals for maintaining the legacy width of the canals as per available revenue documents. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like When Knee Pain Hits, Start Eating These Foods, and Feel Your Pain Go Away (It's Genius) Read More Undo SIA for other canals will also begin soon. Under the project, Edappally, Market, Thevara, Perandoor, Chilavannoor and Konthuruthy canals will be rejuvenated. The once-navigable canals are now in a state of ruin mainly due to illegal encroachments and dumping of waste.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store