
Dubai's RTA powers up with solar panels at key facilities
The solar systems are expected to generate 32 million kilowatt-hours annually, cutting around 10,000 tonnes of carbon dioxide emissions each year.
These installations are spread across various RTA facilities, including bus stations and metro depots.
The RTA is also ensuring that the panels meet Dubai Electricity and Water Authority's standards, with real-time monitoring of energy production.
"The sites where solar energy systems were installed include 16 facilities affiliated with various RTA sectors and agencies, such as bus depots in Al Quoz, Al Khawaneej and Al Rowaiyah; bus stations in Al Satwa and Oud Metha; maintenance workshops in Al Muhaisnah; as well as metro depots and other locations," said Shaikha Ahmad Al Shaikh, Director of Buildings and Facilities at the RTA's Corporate Administrative Support Services Sector.
This project supports sustainability goals, including the RTA's Zero-Emissions Strategy for 2050, the Dubai Clean Energy Strategy 2050 and the Dubai Integrated Energy Strategy 2030.
#RTA has completed a project to install solar energy systems (solar panels) at 22 of its buildings and facilities. This project aims to enhance the use of renewable energy and reduce environmental impact.
This initiative highlights our commitment to environmental sustainability… pic.twitter.com/7doCzEzIjt
— RTA (@rta_dubai) April 8, 2025
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


The National
15 hours ago
- The National
Abu Dhabi suspends company for emissions breaches in air quality clampdown
The Environment Agency Abu Dhabi has suspended operations at an industrial facility in Mussafah for exceeding emissions limits. The authority said inspections found the breaches had caused a "negative impact on local air quality". It took action against the unnamed company after receiving complaints from the public about strong smells and pollution. The agency said it will continue its monitoring and inspection operations "to help maintain a cleaner, safer and more sustainable Abu Dhabi", in a statement shared on social media on Thursday. "We call on all industrial facilities to fully comply with environmental standards to protect public health and preserve the natural environment we all depend on," it added. Mussafah is one of the capital's busiest industrial zones and is home to factories, garages, warehouses and a port. Air quality strategy In May 2024, Environment Agency Abu Dhabi set out a green action plan aimed at driving up air quality, reducing noise pollution and holding industries to account for their impact on the environment. Sheikh Hamdan bin Zayed, Ruler's Representative of Al Dhafra Region and chairman of the agency, issued a resolution under which all businesses and establishments that need environmental licences to operate must commit to supporting efforts towards cleaner air. The agency pledged to monitor ambient air quality, periodically assessing levels of pollutants to ensure they do not exceed maximum limits. Other tasks include preparing and reviewing environmental studies to set standards for development projects and infrastructure in order to manage emission levels. This followed the launch, in November 2023, of an air quality improvement plan to pinpoint pollution hotspots and curb the environmental impact of construction. The cutting-edge air-quality system developed by the environment agency aims to reduce exposure to pollution and provide cleaner air across the capital. It includes the release of detailed air-quality maps each year. Abu Dhabi last month unveiled a 25-year plan to address the growing threat of climate change and protect the emirate's precious natural resources for future generations. The comprehensive strategy will focus on bolstering the "highly vulnerable" environmental systems of groundwater, soil and biodiversity, which are viewed as critical to human health, water security and agricultural productivity. The Abu Dhabi Climate Change Adaptation Plan for the Environment Sector (2025–2050) assesses a wide variety of climate-related risks and outlines 142 strategies to be implemented by 2050, including 86 to be introduced in the next five years.


Hi Dubai
a day ago
- Hi Dubai
RTA Opens New Exit Towards Ras Al Khor Road to Ease Congestion Near Bu Kadra Interchange
Dubai's Roads and Transport Authority (RTA) will open a new exit in early August from the collector road linking Financial Centre Street to Ras Al Khor Road, near Bu Kadra Interchange. This project is part of RTA's Rapid Traffic Solutions Plan, designed to improve road efficiency and ease congestion in high-traffic zones. The new exit reduces peak-hour travel time from 13 minutes to 6 minutes—a 54% improvement—by easing pressure on the Bu Kadra Interchange and facilitating smoother access to Dubai–Al Ain Road. It also supports Dubai's ongoing urban growth and infrastructure development efforts. The project complements other recent enhancements in the Ras Al Khor area, including the widening of Exit 25 from Ras Al Khor Road to Al Khail Road, which increased capacity to 3,000 vehicles per hour and reduced travel time during peak hours from 7 to 4 minutes. News Source: Dubai Media Office


Arabian Business
a day ago
- Arabian Business
Dubai traffic to ease: RTA opens new exit to cut peak-hour travel times
Dubai's Roads and Transport Authority (RTA) will open a new exit from the collector road in early August for vehicles travelling from Financial Centre Street towards Ras Al Khor Road, near Bu Kadra Interchange. The improvement forms part of RTA's Rapid Traffic Solutions Plan, which aims to enhance road network efficiency and improve traffic flow in Ras Al Khor area. The area borders several developments, commercial zones, and industrial zones. RTA will open in early August a new exit from the collector road for vehicles travelling from Financial Centre Street towards Ras Al Khor Road, near Bu Kadra Interchange. This improvement forms part of RTA's Rapid Traffic Solutions Plan, aimed at enhancing road network efficiency… — Dubai Media Office (@DXBMediaOffice) July 31, 2025 New exit eases Dubai traffic flow 'RTA is committed to the continuous enhancement of roads and infrastructure in line with Dubai's urban development,' the authority said in a statement. The new exit improves traffic movement at Bu Kadra Interchange by reducing travel time for vehicles using the collector road from Financial Centre Street towards Ras Al Khor Road. The improvement also eases congestion for vehicles heading towards Dubai–Al Ain Road. Peak-hour travel time has been cut by 54 per cent, from 13 minutes to 6 minutes, as a result of the new exit. The development complements a series of traffic improvements in Ras Al Khor area. Exit 25 from Ras Al Khor Road to Al Khail Road in the direction of Al Meydan Street was widened from a single lane to two lanes over a 500-metre stretch. The upgrade doubled capacity to 3,000 vehicles per hour, reducing queues and cutting peak-period travel time from 7 minutes to 4 minutes. This has improved traffic flow at the junction.