logo
Opus One Gold Obtains 4.12 g/t Gold Over 7.3 m at 135 m; Including 6.1 g/t Gold Over 4 m From the First Hole of the Drilling Season on its Zone 1 Gold Discovery, on Noyell Project

Opus One Gold Obtains 4.12 g/t Gold Over 7.3 m at 135 m; Including 6.1 g/t Gold Over 4 m From the First Hole of the Drilling Season on its Zone 1 Gold Discovery, on Noyell Project

NOT FOR DISTRIBUTION TO U.S NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES
MONTREAL, May 12, 2025 (GLOBE NEWSWIRE) — Opus One Gold Corp. (TSX-V: OOR) (the 'Company' or 'Opus One') is pleased to announce that the first hole (NO-25-01) of the winter drilling program on its 100% owned Noyell project near the town of Matagami, Abitibi, Québec, returned 4.12 g/t Au over 7.3 m from 135.0 to 142.3 m. The mineralized interval represents a true width of approximately 6 m within the Zone 1 structure. This result includes a richer portion of 6.1 g/t Au over 4.0 m. A second interval, representing Zone 2, returned 4.71 g/t Au over 0.5 m from 206.5 to 207.0 m.
NO-25-01 was drilled in the upper portion of the mineralized structure, a sector that had seen very limited drilling in the past. Zone 1 was intersected at a vertical depth of 115m below surface. Drill hole location and parameters are as follows:
Following our initial observations, it was decided to extend the originally planned 7,000 m drilling program to nearly 9,000 m (8,881 m). It totals 22 holes which have now all been completed. Logging and assaying are in progress. More assay results are expected soon.
Louis Morin, Opus One CEO, commented,
'The first results of this drilling season are much better than anticipated. Those new results show that mineralized structure, near surface, is very strong and its thickness seems to increase from previous deeper intervals. Based on our preliminary visual review of the core, which indicated good evidences of mineralization (presence of an extended stockwork of quartz and sulphides), we decided to extend the drilling program as much as possible.'
Sample preparation, analysis and QAQC program
All samples are described, labelled, cut (diamond saw) and bagged at Technominex' facilities in Rouyn-Noranda. Samples are then shipped to AGAT certified Laboratory in Val D'or for preparation. Sample pulps are then shipped to various AGAT laboratories in Canada for analysis. Samples are assayed for gold using by Fire Assay (50g), with ICP-OES Finish. All samples equal or above 10 g/t Au are submitted to ore grade gravimetric finish.
Opus One's QAQC program consists of one control sample inserted, at Technominex' facility, after 9 regular samples. Control samples consist of a certified blank and various gold grades certified material.
OPUS ONE GOLD Corp.
Opus One Gold Corp. is a mining exploration company focused on discovering high quality gold and base metals deposits within strategically located properties in proven mining camps, close to existing mines in the Abitibi Greenstone Belt, north-western Quebec and north-eastern Ontario – one of the most prolific gold mining areas in the world. Opus One holds assets in the Val-d'Or and Matagami mineral districts.
An independent qualified person, Pierre O'Dowd P.Geo, has verified and approved the data disclosed, including sampling, analytical, and test data underlying the information or opinions contained in the written disclosure as required by section 3.1 and 3.2 of NI43-101.
Forward-Looking Statements
This news release contains statements that may constitute 'forward-looking information' within the meaning of applicable Canadian securities legislation. Forward-looking information may include, among others, statements regarding the future plans, costs, objectives or performance of Opus One, or the assumptions underlying any of the foregoing. In this news release, words such as 'may', 'would', 'could', 'will', 'likely', 'believe', 'expect', 'anticipate', 'intend', 'plan', 'estimate' and similar words and the negative form thereof are used to identify forward-looking statements. Forward-looking statements should not be read as guarantees of future performance or results, and will not necessarily be accurate indications of whether, or the times at or by which, such future performance will be achieved. No assurance can be given that any events anticipated by the forward-looking information will transpire or occur, including the anticipated exploration program on the project, the results of such exploration program, the development of the project and what benefits Opus One will derive from the project, the expected demand for lithium. Forward-looking information is based on information available at the time and/or management's good-faith belief with respect to future events and are subject to known or unknown risks, uncertainties, assumptions, and other unpredictable factors, many of which are beyond Opus One' control.
These risks, uncertainties and assumptions include, but are not limited to, those described under 'Financial Instruments' and 'Risk and Uncertainties in Opus One' Annual Report for the fiscal year ended August 31
st
, 2022, a copy of which is available on SEDAR at
www.sedar.com
and could cause actual events or results to differ materially from those projected in any forward-looking statements. Opus One does not intend, nor does Opus One undertake any obligation, to update or revise any forward-looking information contained in this news release to reflect subsequent information, events or circumstances or otherwise, except if required by applicable laws.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of the release.
For more information, please contact:
Louis Morin
Chief Executive Officer & Director
Tel.: (514) 591-3988
Michael W. Kinley, CPA, CA
President, Chief Financial Officer & Director
Tel: (902) 402-0388
info@OpusOneGold.com
Visit Opus One's website:
www.OpusOneGold.com
Infographics accompanying this announcement are available at:
https://www.globenewswire.com/NewsRoom/AttachmentNg/d13a18ba-e8ed-403b-975c-65fe11162709
https://www.globenewswire.com/NewsRoom/AttachmentNg/a400ef3c-649a-4c23-81c0-b2f67ef49594
https://www.globenewswire.com/NewsRoom/AttachmentNg/a436eae4-7824-4455-835b-05f08decb5f3
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Opus One Gold Obtains 1.98 g/t Gold Over 11.9 m From Hole NO-25-21, at 400 Vertical Meters on Its Zone 1 Gold Discovery, Noyell Project
Opus One Gold Obtains 1.98 g/t Gold Over 11.9 m From Hole NO-25-21, at 400 Vertical Meters on Its Zone 1 Gold Discovery, Noyell Project

Hamilton Spectator

time6 days ago

  • Hamilton Spectator

Opus One Gold Obtains 1.98 g/t Gold Over 11.9 m From Hole NO-25-21, at 400 Vertical Meters on Its Zone 1 Gold Discovery, Noyell Project

NOT FOR DISTRIBUTION TO U.S NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES MONTREAL, July 29, 2025 (GLOBE NEWSWIRE) — Opus One Gold Corp (TSX-V: OOR) (the 'Company' or 'Opus One') is pleased to announce that drill hole NO-25-21 from the winter drilling program on its 100% owned Noyell project near the town of Matagami, Abitibi, Québec, Canada, returned 1.98 g/t Au over 11.9 m from 474.8 to 486.7 m. The mineralized interval represents a true width of approximately 10.6 m within the Zone 1 structure. Hole NO-25-21 was drilled at an intermediate depth of 400 m in the eastern portion of Zone 1. This wide interval confirms the steep eastern plunge on Zone 1 which culminates with the excellent results obtained in hole NO-25-13, one of the deepest holes of the campaign so far (released in June). This hole was initially planned to intersect Zone 1 approximately 50 m deeper than it did but, strong deviation flattened the trajectory of the hole in an unusual fashion and the depth target was not attained. Nevertheless, this hole confirms the continuity of the mineralization in a key area of Zone 1. Both holes NO-25-20 and NO-25-22 explored the eastern extension of Zone 1 at depths of 300 and 500 m. Both holes intersected Zone 1 but returned only marginal results. These results were the last ones from the winter drilling program of 2025 on Noyell. 2025 Drill hole location and parameters are as follows: 2025 WINTER FINAL DRILLING RESULTS Louis Morin, Opus One CEO commented: ' All results of the 2025 winter drilling program on Noyell have now been released. The program has been a real success and a game changer for Opus One. We have discovered a significant area of strong gold mineralization near surface and we have demonstrated that the mineralization extends from surface, below 20 m of overburden, down to at least 500 m vertical. In the weeks to come, we will finalize our review of the results and propose a new interpretation for Zone 1.' Sample preparation, analysis and QAQC program All core recovered is NQ size. All samples are described, labelled, cut (diamond saw) and bagged at Technominex' facilities in Rouyn-Noranda. Samples are then shipped to AGAT certified Laboratory in Val-d'Or for preparation. Sample pulps are then shipped to various AGAT laboratories in Canada for analysis. Samples are assayed for gold using by Fire Assay (50g), with ICP-OES Finish. All samples equal or above 10 g/t Au are submitted to ore grade gravimetric finish. Opus One's QAQC program consists of one control sample inserted, at Technominex' facility, after 9 regular samples. Control samples consist of a certified blank and various gold grades certified material. OPUS ONE Resources Inc. Opus One Resources Inc. is a mining exploration company focused on discovering high quality gold and base metals deposits within strategically located properties in proven mining camps, close to existing mines in the Abitibi Greenstone Belt, north-western Quebec and north-eastern Ontario - one of the most prolific gold mining areas in the world. Opus One holds assets in the Val-d'Or and Matagami mineral districts. An independent qualified person, Pierre O'Dowd has verified and approved the data disclosed, including sampling, analytical, and test data underlying the information or opinions contained in the written disclosure as required by section 3.1 and 3.2 of NI43-101. Forward-Looking Statements This news release contains statements that may constitute 'forward-looking information' within the meaning of applicable Canadian securities legislation. Forward-looking information may include, among others, statements regarding the future plans, costs, objectives or performance of Opus One, or the assumptions underlying any of the foregoing. In this news release, words such as 'may', 'would', 'could', 'will', 'likely', 'believe', 'expect', 'anticipate', 'intend', 'plan', 'estimate' and similar words and the negative form thereof are used to identify forward-looking statements. Forward-looking statements should not be read as guarantees of future performance or results, and will not necessarily be accurate indications of whether, or the times at or by which, such future performance will be achieved. No assurance can be given that any events anticipated by the forward-looking information will transpire or occur, including the anticipated exploration program on the project, the results of such exploration program, the development of the project and what benefits Opus One will derive from the project, the expected demand for lithium. Forward-looking information is based on information available at the time and/or management's good-faith belief with respect to future events and are subject to known or unknown risks, uncertainties, assumptions, and other unpredictable factors, many of which are beyond Opus One's control. These risks, uncertainties and assumptions include, but are not limited to, those described under 'Financial Instruments' and 'Risk and Uncertainties in Opus One's Annual Report for the fiscal year ended August 31 st , 2024, a copy of which is available on SEDAR at and could cause actual events or results to differ materially from those projected in any forward-looking statements. Opus One does not intend, nor does Opus One undertake any obligation, to update or revise any forward-looking information contained in this news release to reflect subsequent information, events or circumstances or otherwise, except if required by applicable laws. Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of the release. For more information, please contact: Louis Morin Chief Executive Officer & Director Tel.: (514) 591-3988 Michael W. Kinley, CPA, CA President, Chief Financial Officer & Director Tel: (902) 402-0388 info@ Visit Opus One's website: Photos accompanying this announcement are available at:

Details on meeting between Luka Doncic and Rob Pelinka in May
Details on meeting between Luka Doncic and Rob Pelinka in May

Yahoo

time16-07-2025

  • Yahoo

Details on meeting between Luka Doncic and Rob Pelinka in May

Just four days after the Los Angeles Lakers were knocked out of the NBA playoffs by the Minnesota Timberwolves, Luka Doncic, their new generational superstar, and Lara Beth Seager, his manager, met with Lakers general manager Rob Pelinka and coach JJ Redick at an upscale restaurant in West Hollywood, Calif. Ever since the Lakers landed Doncic in a seismic trade on Feb. 1, it has been clear that their aim has been to build a championship team around and for him. That meant LeBron James was no longer their most important player or biggest concern. Advertisement An ESPN article by Ramona Shelburne and Brian Windhorst outlined what was discussed between everyone at that meeting. "The purpose of the meeting was as clear as their choice of door: Doncic is the face of the franchise now, and the Lakers wanted him -- and everyone else -- to know it. "Over a bottle of Opus One, Pelinka and Redick explained not only their strategy in building the team around Doncic's skill set, sources told ESPN, but also the complexities of the NBA's new collective bargaining agreement and how they planned to navigate them. "That exquisite bottle of wine might have helped Doncic digest Pelinka's explanation of arcane topics such as the second apron, the value of preserving salary cap space to help acquire an age-appropriate star alongside of him and what remained of the Lakers' draft assets. Pelinka had made it a working dinner, toting in a thick binder. "That binder, with those offseason Lakers plans and longer-range strategies and dreams, used to be presented to James at meetings like these. On the agenda, the concepts of chasing players the team eventually landed -- such as Anthony Davis and Russell Westbrook -- and those they ultimately didn't. "Pelinka has talked often to Doncic and Seager in the 3½ months since he acquired the young star from the Dallas Mavericks in one of the most shocking trades in NBA history." Almost immediately after landing Doncic, the Lakers went to work looking to build a winning roster. They agreed to send Dalton Knecht, Cam Reddish and draft compensation to the Charlotte Hornets for Mark Williams, a young and promising center. But the oft-injured Williams failed his physical, and there went that attempt to address the team's gaping hole at the 5 spot. Last week, L.A. appeared to plug that hole by signing Denadre Ayton in free agency. They still have some work to do in order to become a championship contender, but since Doncic is 26 years of age, they can have a relaxed sense of urgency. This article originally appeared on LeBron Wire: Details on meeting between Luka Doncic and Rob Pelinka in May

Details on meeting between Luka Doncic and Rob Pelinka in May
Details on meeting between Luka Doncic and Rob Pelinka in May

USA Today

time12-07-2025

  • USA Today

Details on meeting between Luka Doncic and Rob Pelinka in May

Just four days after the Los Angeles Lakers were knocked out of the NBA playoffs by the Minnesota Timberwolves, Luka Doncic, their new generational superstar, and Lara Beth Seager, his manager, met with Lakers general manager Rob Pelinka and coach JJ Redick at an upscale restaurant in West Hollywood, Calif. Ever since the Lakers landed Doncic in a seismic trade on Feb. 1, it has been clear that their aim has been to build a championship team around and for him. That meant LeBron James was no longer their most important player or biggest concern. An ESPN article by Ramona Shelburne and Brian Windhorst outlined what was discussed between everyone at that meeting. "The purpose of the meeting was as clear as their choice of door: Doncic is the face of the franchise now, and the Lakers wanted him -- and everyone else -- to know it. "Over a bottle of Opus One, Pelinka and Redick explained not only their strategy in building the team around Doncic's skill set, sources told ESPN, but also the complexities of the NBA's new collective bargaining agreement and how they planned to navigate them. "That exquisite bottle of wine might have helped Doncic digest Pelinka's explanation of arcane topics such as the second apron, the value of preserving salary cap space to help acquire an age-appropriate star alongside of him and what remained of the Lakers' draft assets. Pelinka had made it a working dinner, toting in a thick binder. "That binder, with those offseason Lakers plans and longer-range strategies and dreams, used to be presented to James at meetings like these. On the agenda, the concepts of chasing players the team eventually landed -- such as Anthony Davis and Russell Westbrook -- and those they ultimately didn't. "Pelinka has talked often to Doncic and Seager in the 3½ months since he acquired the young star from the Dallas Mavericks in one of the most shocking trades in NBA history." Almost immediately after landing Doncic, the Lakers went to work looking to build a winning roster. They agreed to send Dalton Knecht, Cam Reddish and draft compensation to the Charlotte Hornets for Mark Williams, a young and promising center. But the oft-injured Williams failed his physical, and there went that attempt to address the team's gaping hole at the 5 spot. Last week, L.A. appeared to plug that hole by signing Denadre Ayton in free agency. They still have some work to do in order to become a championship contender, but since Doncic is 26 years of age, they can have a relaxed sense of urgency.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store