
Six Vanarmare tribals to get welfare benefits for first time
For the first time, members of the Vanarmare tribal community of Nirankal will receive regular financial assistance under a govt welfare scheme.
Govt has sanctioned the Dayanand Social Security Scheme (DSSS) for six tribals from the community, comprising three senior citizens aged 65 to 67 years, and three persons with disabilities aged 45, 48, and 54 years.
Last month, the social welfare department went out to meet the community and observed that none of them were availing themselves of any social welfare schemes.
'They will begin receiving Rs 2,000 each under the scheme from July, which will be credited to them in Aug,' director of social welfare Ajit Panchwadlar told
TOI
. 'Rs 2,000 is a huge amount for them considering their present living conditions. This money will help take care of their needs, including medication, and earn them respect in their families. Taking this money back home will turn them into an important member of their families,' he said.
'This is not a one-time gift. This is the first time the govt has reached out to them to extend a govt welfare scheme,' Panchwadkar said. The govt is also looking at proper housing for them and is considering rehabilitating them.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Scroll.in
28 minutes ago
- Scroll.in
CSIR NET answer key 2025 out at csirnet.nta.ac.in; raise objections by August 3
The National Testing Agency (NTA) is released the provisional answer key of the Joint CSIR-UGC NET June 2025. Candidates can download the answer key from the official website and submit suggestions, if any, by August 3, 2025. A fee of Rs 200 per suggestion applies. 'Challenges made by the candidates will be verified by a panel of Subject Experts. If the challenges of any candidates is found correct, the Answer Key will be revised and applied in the response of all the candidates accordingly. Based on the Final Answer Key, the result will be prepared and declared,' reads the notification. Here's the official notification. The exam was conducted on July 28, 2025, for 1,95,241 candidates. The CSIR-UGC NET is a national-level examination conducted to determine eligibility for Junior Research Fellowship (JRF), Assistant Professorship, and Ph.D. admissions in universities and research institutions across India. Steps to download CSIR UGC NET 2025 answer key


Time of India
an hour ago
- Time of India
J&K: Footbridge between Narsoo and Swena collapses mid-construction; officials blame rain, begin probe
NEW DELHI: An under-construction footbridge connecting Swena and Narsoo blocks in Udhampur district collapsed recently. Built at an estimated cost of Rs 1.58 crore, the bridge was meant to fulfill a reliable connectivity between the two blocks. Tired of too many ads? go ad free now However, with construction still underway and the bridge in its launching stage, the structure gave way during recent rains, triggering an official probe and renewed appeals for accountability and urgent reconstruction. The collapse occurred between the villages of Dharmsthal and Narda, an area where geographical challenges like landslides and heavy rainfall are not uncommon. Officials and community leaders have weighed in, pointing to possible structural flaws, environmental triggers, and supervisory lapses. Narsoo village sarpanch Ashok Kumar Sharma acknowledged the importance of the project while attributing the collapse to natural causes rather than negligence. He said to news agency ANI, "Built to meet long-standing demand, it aims to provide transportation and access to schools, which people previously lacked... The incident was not due to negligence; instead, a storm with rain and strong winds caused rocks to slide, damaging the bridge. People expected to get the bridge soon, but it will take another 5-6 months. A committee should be formed, and the bridge's design should be changed." Subhash Chander, district development council of Narsoo, emphasized swift action and accountability, he added "It was a long-overdue demand. When work started, people were happy. The bridge connects two blocks, Narsoo and Sewna. After learning about what happened, we contacted the department, informed the local MLA, and Union Minister Dr Jitendra Singh, who sent teams. Tired of too many ads? go ad free now An inquiry should be conducted to determine if there may be a technical fault. We appeal for it to be rebuilt soon. Whoever is found guilty, an action should be taken against them." Additional District Development Commissioner (ADDC) Udhampur, Rajinder Singh, provided details about the project status and the potential causes behind the collapse: "A few days ago, the district administration became aware that someone informed DC ma'am about a footbridge between Dharmsthal and Narda that collapsed due to rain. The under-construction bridge, built at Rs 1.58 crore, had been under construction for 1.5 years. The bridge was in the launching stage. According to regulations, its fastening may not have been done properly, which probably caused the collapse." (With agency inputs)


New Indian Express
an hour ago
- New Indian Express
White grub infestation in Dharmapuri sugarcane fields
DHARMAPURI: Sugarcane fields across Dharmapuri district have slowly started to turn a yellowish brown hue over the past few weeks. While one might assume this to be caused by lack of nutrients or due to arid, dry climatic conditions prevailing in Dharmapuri, but this is not the case. The aforementioned sign is one of the symptoms of the damage done by white grubs, the larvae of scarab beetles. Farmers have blamed the spread of the insect on the mills and the agriculture department's failure to identify the infestation, which is spread across the district. White grubs afflict the root of sugarcane. Speaking to TNIE, S Chinnasamy, a sugarcane farmer, said, "The two mills in the district, the Dharmapuri Cooperative Sugarmill (DCS) and the Subramaniya Siva Cooperative Sugarmill (SSCS), have affixed a total target of 12,000 acres for cane cultivation across the district. White grubs have been feeding off the roots of the sugarcane, leading to the wilting of our sugarcane. Farmers stand to lose their sugarcanes. The situation is dire, especially considering the investments we have put into the cultivation. Each farmer has invested somewhere between Rs 20,000 per acre for cultivation, and if the infestation is not curbed, we stand to face massive losses". G Murali, a farmer from Morappur, said, "The white grub infestation should have been identified much earlier. Even the fields cultivated by the SSCS are affected. The lack of timely awareness is the cause of the infestation. While it is true that we have faced these insects in the past, most farmers are struggling to control the spread of insects. So it is only a matter of time till we lose our crops".