logo
India Ratings assigns 'BBB+/A2' rating to the bank facilities of Indo Tech Transformers

India Ratings assigns 'BBB+/A2' rating to the bank facilities of Indo Tech Transformers

Indo Tech Transformers (ITL) said that India Ratings and Research has assigned 'IND BBB+/Stable/IND A2' rating to the bank facilities of the company.
India Ratings said that the ratings are supported by the significant improvement in ITL's revenue during FY22-FY25, backed by strong demand for transformers and increased realisations.
Additionally, the ratings factor in the companys healthy EBITDA margins, comfortable credit metrics and promoters more than three decades of experience in the transformer industry. However, the ratings are constrained by volatility in raw material prices and the working capital-intensive nature of operations.
The agency further said that a a substantial improvement in the scale of operations, along with maintaining the liquidity position and the credit metrics, all on a sustained basis, could be positive for the ratings.
However, any significant deterioration in scale of operations and/or large unanticipated debt-funded capex along with any substantial cash outflow to group entities, resulting in deterioration in the liquidity position and credit metrics, with the interest coverage falling below 4x, on a sustained basis, could be negative for the ratings.
Indo tech Transformers (ITL) manufactures electrical transformers. Its product portfolio comprises power and large power transformers up to 200 MVA/ 230 KV and distribution transformers up to 5MVA/33KV. The companys production facilities are located at Kancheepuram and Chennai, Tamil Nadu, with an aggregate installed capacity of 9684 MVA as on 31 March 2025.
The company's net profit declined 17.95% to Rs 20.98 crore despite a 17.94% increase in net sales to Rs 206.06 crore in Q4 FY25 as compared with Q4 FY24.
The scrip fell 3.19% to currently trade at Rs 2090 on the BSE today.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Urban launches slimmest 67W GaN Charger ‘Lumen' in India, priced at Rs 1,799
Urban launches slimmest 67W GaN Charger ‘Lumen' in India, priced at Rs 1,799

Time of India

time11 minutes ago

  • Time of India

Urban launches slimmest 67W GaN Charger ‘Lumen' in India, priced at Rs 1,799

URBAN Smart Wearables has unveiled its first slimmest charger — Lumen 67W GaN Charger in India. Roughly the size of a credit card, the ultra-flat charger claimed to deliver up to four times faster charging than standard models, while fitting flush against walls and sockets—making it ideal for tight spaces and travel. Price and availability The charger is BIS-certified and built with smart chip technology to ensure safe and efficient performance. It's available at an introductory price of Rs 1,799 on Amazon, Flipkart, and offline retail stores across India. Powered by Gallium Nitride (GaN) technology, Lumen offers a 67W output with dual ports (USB-A and Type-C), allowing users to charge two devices simultaneously. It supports a wide range of gadgets including MacBooks, iPhones, Android phones, tablets, and Windows laptops, and comes with interchangeable global plugs for US, UK, and EU sockets. Designed for modern lifestyles, Lumen features: Foldable, ultra-slim design for easy portability Smart voltage adjustment to protect against thermal surges Matte soft-touch finish for a premium look and feel Fast-charging capability: up to 60% in 30 minutes for select devices Speaking at the launch, URBAN Co-Founder Aashish Kumbhat said, 'With Lumen, we've solved the everyday hassle of bulky chargers and slow charging—without compromising on aesthetics or ease. It's a premium product built for performance and convenience.' AI Masterclass for Students. Upskill Young Ones Today!– Join Now

Anuh Pharma gains after inaugurating new manufacturing block in Maharashtra
Anuh Pharma gains after inaugurating new manufacturing block in Maharashtra

Business Standard

time16 minutes ago

  • Business Standard

Anuh Pharma gains after inaugurating new manufacturing block in Maharashtra

Anuh Pharma rose 2.46% to Rs 106.20 after the company announced the inauguration of its new manufacturing unit, Block INT-1A, located at M.I.D.C., Tarapur, Boisar, in Palghar district, Maharashtra. In a regulatory filing, the company stated that the new facility is expected to become operational within July 2025. Upon commencement, the plant will expand Anuh Pharmas manufacturing capacity by an additional 200 metric tons per annum (MT/Annum). Post-expansion, the company's total production capacity will increase from approximately 2,200 MT/Annum to 2,400 MT/Annum. The newly inaugurated INT-1A block is also equipped with an additional 40 kiloliters (KL) of reactor capacity, enhancing the companys infrastructure and positioning it to meet growing market demand more effectively. Anuh Pharma, a bulk drug manufacturing company, is part of the Rs 8.5 bn SK Group of Companies, which employs 2000+ people across businesses such as manufacturing of APIs, pharma formulations, distribution, and logistics. Established in 1960, Anuh Pharma today is one of the largest manufacturers of macrolides and anti-TB products in India, besides being a major player in anti-bacterials, anti-malarials, and corticosteroids. The companys standalone net profit fell 18.9% to Rs 12.46 crore, while revenue from operations jumped 20.9% to Rs 198.14 crore in Q4 March 2025 over Q4 March 2024.

Last tunnel of Mumbai Metro's Line 7A, important connectivity link to airport, completed: MMRDA
Last tunnel of Mumbai Metro's Line 7A, important connectivity link to airport, completed: MMRDA

Indian Express

time16 minutes ago

  • Indian Express

Last tunnel of Mumbai Metro's Line 7A, important connectivity link to airport, completed: MMRDA

The Mumbai Metropolitan Region Development Authority (MMRDA) completed the work on the second and last tunnel of Mumbai Metro's Line 7A corridor between Andheri East and Chhatrapati Shivaji Maharaj International Airport (CSMIA) on Monday. The tunnel-boring machine Dhruv was deployed for the work and the entire tunnelling on the underground section of the corridor is now complete, officials said. The 1.65-km upline tunnel of a diameter of 5.6 m was built with 1,178 tunnel-lining rings of 1.4 m. Precast ring segments in six pieces were used as liners. The driving of the tunnel started on November 4, 2023, and drove under critical infrastructure items such as Metro Line 3, the Sahar Elevated Road ramp, a principal underground sewer pipeline, and a water pipe. Line 7A, which is 3.17 km long, runs from Andheri East to CSMIA's Terminal 2. It has elevated and underground portions. The line will have two stations–Airport Colony and CSIA Terminal 2–and will be configured to link with the running Metro Line 3 (Aqua Line) and, later on, Metro Line 8 (Gold Line), which will be connected to Navi Mumbai International Airport. So far, 61 per cent of the total alignment of Line 7A has been completed, according to officials. The work is being undertaken by J Kumar Infraprojects Limited, which was given the project contract by the MMRDA in September 2019. The Rs 1,998-crore contract involves the construction of a viaduct, ramp, underground tunnels and metro stations. The same company used Dhruv in the Metro Line 3 project from 2018 to 2021. Metro Line 7A is a part of an extension of Metro Line 9, also called Red Line, which has an estimated cost of Rs 6,518 crore. Line 7A is said to enhance connectivity to the airport.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store