logo
‘Make own facility': Faridabad told to halt Bandhwari waste disposal

‘Make own facility': Faridabad told to halt Bandhwari waste disposal

Time of India2 days ago
Gurgaon: MCG will not accept waste transported by Faridabad civic body (MCF) at Bandhwari site "after a notified date". It was discussed at a meeting chaired by urban local bodies secretary and commissioner Vikas Gupta on July 27.
MCG has — in fact — directed MCF to make its own arrangements for waste disposal and cease sending daily waste to the Bandhwari landfill site. MCG commissioner Pradeep Dahiya said, "We have not yet fixed a date beyond which their daily waste won't be accepted at Bandhwari landfill site." MCF has already set up two decentralised waste processing units — one in Mujheri with a capacity to process 150 MT per day and the second one in Pratapgarh with the capacity to process 250 TPD.
Another processing facility is being set up at Dabua in Faridabad.
MCF commissioner Dhirendra Khadgata said the civic body needs more time since "we have projects of decentralised waste processing in the pipeline". Khadgata said, "We need time to execute those projects and are currently negotiating on that. We have three waste processing units in Pratapgarh, Mujheri and Dabua. However, their functioning is restricted due to rains.
by Taboola
by Taboola
Sponsored Links
Sponsored Links
Promoted Links
Promoted Links
You May Like
5 Books Warren Buffett Wants You to Read In 2025
Blinkist: Warren Buffett's Reading List
Undo
We have six transfer stations where we intend to set up processing units.
We will eventually stop sending our fresh waste to Bandhwari. We need to make arrangements before we implement that."
You Can Also Check:
Gurgaon AQI
|
Weather in Gurgaon
|
Bank Holidays in Gurgaon
|
Public Holidays in Gurgaon
According to data accessed by TOI, the MCF currently transports between 4,000 and 1,000 metric tonnes (MT) of fresh waste to the landfill each day, while in July, the MCG's daily fresh waste transported to Bandhwari ranged from 1,100 MT to 1,800 MT daily.
In Sept last year MCG wrote to the urban local bodies (ULB) department, requesting it to direct the MCF to handle its fresh waste within its own jurisdiction rather than transporting it to the Bandhwari landfill site.
In a letter to the ULB department, former MCG commissioner Narhari Singh Banger had said the amount of fresh waste sent from Faridabad to Bandhwari doubled over the past two months, rising from 650 tonnes to a staggering 1,300 tonnes per day in Sept last year.
The waste processing at Bandhwari, meanwhile, has stopped since the two agencies working at the site were barred from working by the MCG due to their sluggish pace of work.
TOI reported on July 19 that a new estimated proposal of Rs 2.5 crore for the overhaul of the landfill was prepared, which includes the construction of a 15m wide and 400m long cement concrete road alongside the view cutter at the landfill site. Construction of a road will facilitate the smooth movement of the trucks carrying waste. Along with the road, the construction of a reinforced cement concrete drain is also proposed.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

‘Far from dead': Economy that Trump buried ‘outpaces' US
‘Far from dead': Economy that Trump buried ‘outpaces' US

Time of India

time23 minutes ago

  • Time of India

‘Far from dead': Economy that Trump buried ‘outpaces' US

1 2 Ludhiana: Indian business leaders have pushed back firmly against US President Donald Trump's recent remarks describing the Indian and Russian economies as "dead", calling the claim baseless and out of step with the country's economic trajectory. The resilient economy politely declines to attend its own funeral, and the critic must answer: "If we're dead, who's eating all the global market share?" Industrialists from Ludhiana, one of the country's leading manufacturing hubs, said on Sunday that while US tariff hikes may temporarily affect some sectors, the Indian economy remains vibrant, resilient, and driven by robust domestic demand. "India can never be a dead economy — our population and internal demand alone ensure that," said Ashpreet Singh Sahni, managing director of Sehaj Solutions and former chairman of the Confederation of Indian Industry's Ludhiana chapter. "Yes, tariffs may slow us down for a year or two, but we'll bounce back stronger." Sahni, who was in the US when the new tariff regime was announced, said American manufacturers were also feeling the pinch. "There's nervousness on both sides. US companies look actively for alternatives to China, and India is high on their list. I believe the US will have to reconsider these tariffs, eventually." Upkar Singh Ahuja, president of the Chamber of Industrial and Commercial Undertakings (CICU), echoed the sentiment, arguing that India's global reputation was rising. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Ask A Pro: "I'm 70 with $1.4M in IRAs. Should I convert $120K/Year to a Roth?" SmartAsset Undo "During my visit to Europe, I saw firsthand the interest in Indian goods. Yes, IT and pharma may face short-term pressure, but they're already exploring new, tariff-friendly markets." Ahuja warned that Washington's protectionist stance could have unintended consequences. "Such tariffs are inflationary. They may backfire on the US economy itself. In the long term, it's not sustainable." Pankaj Sharma, president of the Association of Trade and Industrial Undertakings (ATIU), said India should seize the moment. "This is a time to turn adversity into opportunity. The tariffs aren't India-specific — they affect many countries. Our govt should ramp up support for manufacturing and help Indian firms enter new global markets." He called for stronger policy support, including incentives to help exporters tap into emerging economies and underserved regions. "The Indian economy is not just surviving — it's adapting. And that's the hallmark of a living, breathing market." The remarks come as global economic tensions continue to rise, with supply chains still reeling from pandemic aftershocks and shifting geopolitical alignments. Indian industry, local leaders say, is determined not to be left behind. Get the latest lifestyle updates on Times of India, along with Friendship Day wishes , messages and quotes !

UGC warns colleges against unapproved foreign collaborations
UGC warns colleges against unapproved foreign collaborations

Time of India

time23 minutes ago

  • Time of India

UGC warns colleges against unapproved foreign collaborations

Hyderabad: Even as many colleges are signing collaborative agreements with foreign institutions to offer degree programmes, University Grants Commission (UGC) has made it clear that these degrees will not be recognised unless they have approval from the commission. The commission also said that action will be taken against all defaulting higher educational institutions (HEIs) and EdTech companies for offering such courses — twinning programmes, dual degree programmes, and joint degrees — without required approvals. "It has been observed that many HEIs or colleges have entered into collaborative agreements or arrangements with foreign-based educational institutions or providers not recognised by the commission and have been facilitating the issuance of degrees to the students enrolled in those institutions from such foreign-based educational institutions," UGC said in a circular. "Students are advised to exercise due caution and are made aware that such courses, programmes, and degrees do not have UGC recognition and that they will be doing so at their own risk and consequences," it added. Faculty working in technical colleges in the state said that even in Telangana, many colleges were signing agreements with institutions abroad, but hardly anyone was seeking approval before announcing such programmes. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like TV providers are furious: this gadget gives you access to all channels Techno Mag Learn More Undo "The recent notices to ed-tech companies clearly show that many are offering programmes without required approval. Here, students are suffering as they are joining in programmes assuming that they are recognised," Telangana Schools Technical Colleges Employees Association president A Santosh Kumar said. You Can Also Check: Hyderabad AQI | Weather in Hyderabad | Bank Holidays in Hyderabad | Public Holidays in Hyderabad Telangana Council of Higher Education (TGCHE) officials said that no college should announce any collaborations without following due procedures. "Many colleges are signing MoUs and offering various programmes. However, before making official announcements, they should follow due procedure and get required permissions or approvals," TGCHE chairman V Balakista Reddy said. He said that more than colleges from Telangana, those in the NCR region, Maharashtra and Karnataka, were the ones violating norms and offering courses. Get the latest lifestyle updates on Times of India, along with Friendship Day wishes , messages and quotes !

High Court stays YEIDA order to cancel land allotted to company over Rs 118 crore dues
High Court stays YEIDA order to cancel land allotted to company over Rs 118 crore dues

Time of India

time23 minutes ago

  • Time of India

High Court stays YEIDA order to cancel land allotted to company over Rs 118 crore dues

Noida: Allahabad high court's Lucknow bench has restrained the Yamuna Expressway Industrial Development Authority (YEIDA) from cancelling the land allotment of Greenbay Infrastructure for its 100-acre township project in Sector 22D. YEIDA has been restrained from cancellation until the company's two revision applications before the state govt — seeking relief under the "zero period" policy due to non-possession of 30–35% of the land — are disposed of. The zero period policy refers to a period during which developers are granted relief from interest and penalties on land dues for stalled projects. You Can Also Check: Noida AQI | Weather in Noida | Bank Holidays in Noida | Public Holidays in Noida The court's interim order came on July 30, just a day before YEIDA's July 31 deadline for the builder to pay Rs 118 crore in pending dues or face cancellation of the land parcel. Justice Pankaj Bhatia, who heard the matter, directed that no coercive action be taken based on YEIDA's July 8 plot cancellation notice. Since the realtor filed a revision application before the state govt in Jan, the court observed that while the issue remains under review, YEIDA cannot cancel the land allotment. The court instructed the state govt to decide on the interim relief application within 10 days and complete proceedings on the revision application filed by Greenbay within four weeks. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Access all TV channels anywhere, anytime Techno Mag Learn More Undo Greenbay said it has so far deposited Rs 60 crore out of the Rs 118 crore and has sought "zero period" relief from the date of allotment till now, citing incomplete land possession and stalled construction due to farmers' unwillingness to vacate around one-third of the land. The dispute stems from a prolonged standoff between the developer and YEIDA. The land was allotted to Greenbay in Feb 2011, with a lease deed executed in March 2012. In Jan 2014, Greenbay subleased a portion of the land to Emerald Properties for a group housing society. The company later launched the Golf Village township project, comprising 691 plots. However, the developer said it could not take possession of two-thirds of the land until 2019 and about one-third still remains outside its control. According to YEIDA officials, the latest ultimatum followed repeated defaults by the developer under the UP govt's "legacy stalled projects" policy introduced on Dec 21, 2023, which aims to revive long-pending housing projects and ensure timely possession for homebuyers. After the developer gave its consent, the dues were recalculated to Rs 441 crore, of which Greenbay was required to pay 25% (Rs 110 crore) by April 28, 2024. After it deposited the 25% amount, YEIDA in July 2024 issued a revised payment schedule for the remaining 75% dues. The Authority further revised this schedule a month later when the developer requested a recalculation of the amount with 10% simple interest and inclusion of Rs 2.4 crore in unpaid lease rent from 2021. Under the new payment schedule, the first instalment was due on Jan 15 and the last by July 15, 2026. Based on the initial amount paid, YEIDA allowed the developer to proceed with tripartite sublease registrations for proportionate land areas. In Oct 2024, Greenbay requested another extension for paying the remaining dues, citing continued difficulty in obtaining full physical possession of the plot. The company claimed that about 30% of the land remained under cultivation by farmers, preventing access. Taking this into account, YEIDA granted a three-month extension in Nov 2024, pushing the deadline from Jan 15 to April 15, 2025. However, Greenbay again failed to meet the extended deadline of April 15, 2025. Instead of clearing dues, it submitted a letter on April 15 seeking permission to sublease a 4,330-square metre commercial plot within the township and requested another revision of its payment schedule. During a board meeting on June 18, YEIDA issued a final deadline of June 30, asking Greenbay to deposit around Rs 118 crore or face cancellation of its township project in Sector later extended the deadline by one month, giving Greenbay until July 31 to clear the dues. In a letter dated July 8, the Authority made it clear this was the final ultimatum. The company said it has deposited Rs 60 crore and plans to pay the remaining amount, but it wants its grievances to be heard. Project director of the company Amit Kumar Sharma said, "To fulfil these financial transactions, we need immediate permission to proceed with the sublease of the commercial plot. This authorisation is critical for us to take the necessary steps towards fulfilling our payment obligations. Should we fail to adhere to the agreed timeline for payment, we accept that the sublease may be cancelled without any objection on our part. " Get the latest lifestyle updates on Times of India, along with Friendship Day wishes , messages and quotes !

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store