Not a dream, a destination: Building the new Bharat with power of the sun

Not a dream, a destination: Building the new Bharat with power of the sun

The truth: Solar already powers metro trains, steel plants, and data centres. And it creates more jobs per megawatt than coal ever did
Vineet Mittal
A Solar-Powered Bharat: Not a Dream, a Destination
Picture this: By 2030, every home, every factory, every handheld device in Bharat runs not on coal or gas, but on sunlight. No new thermal plants, no new gas lines—just solar energy from our skies, wind from our coasts, and batteries storing power for when the sun rests.
This is not wishful thinking. It is a blueprint for energy independence, economic security, and environmental leadership. And Bharat has both the capacity and the clarity to make it happen.
But if solar power is so promising, why does it still account for just 21.8 per cent of our installed capacity?
The answer lies not in technology, but in transition.
The Real Cost of Going Solar
Yes, solar panels are cheaper than ever. But powering a house or a factory with solar is not just about installing a few panels. You need:
Inverters
Wiring
Batteries (for night-time use)
Permits and compliance
For many rural households and farming communities still dependent on subsidised coal power, the shift feels like giving up a functional old car for a shiny new one—but the new one needs a custom-built road to run on.
While long-term savings are undeniable, the upfront cost can be daunting. That is why access to finance is critical. We must build a system that makes solar adoption as simple as getting a mobile SIM—low-entry, fast-install, and government-supported.
Batteries: The Silent Partner in the Solar Story
The sun is generous, but it doesn't work nights. To truly run on solar, we need to store sunlight—and that's where Battery Energy Storage Systems (BESS) come in.
These are not the batteries in your phone—they're large, smart systems that can power cities. Encouragingly, the cost of electricity from solar + BESS is now nearly half that of a new coal plant.
Investing in BESS manufacturing, recycling, and deployment is not optional—it's urgent.
The Weather Factor: Geography Is Not Destiny
India is blessed with solar potential—states like Rajasthan, Gujarat, Maharashtra, Karnataka, and Tamil Nadu are already leading. But what about cloudy eastern or foggy northern states?
Solar output varies by season and location, but India's robust inter-state transmission system (ISTS) allows for power balancing across regions. This grid is the unsung hero of our energy transformation and will be central to India's success in the 'One Sun, One World, One Grid' vision.
Large solar farms need space—and lots of it. But space is contested. Agricultural land, forests, or homes can't always make way for panels.
Luckily, we have the Thar Desert, capable of powering all of India and even exporting to neighbours. We also have innovative options:
Floating solar on reservoirs
Solar panels over canals
Agrivoltaics—farming under panels
Solar need not be a land-grabber. It can coexist with agriculture, nature, and livelihoods.
Upgrading an Outdated Grid
The grid we use today was built for coal: centralised, slow, and one-way. Solar is the opposite—distributed, dynamic, and digital.
Upgrading the grid isn't just necessary—it's an opportunity. With smart metering, AI-driven energy trading, and smart substations, we can create a 21st-century infrastructure for a 21st-century economy.
Changing Minds: The Final Frontier
Many still ask:
'Can solar run an industrial Bharat?'
'Will renewables kill jobs?'
The truth: Solar already powers metro trains, steel plants, and data centres. And it creates more jobs per megawatt than coal ever did.
But myths stick. That's why we need a nationwide education and awareness campaign, especially in schools and rural areas. The solar revolution must become a people's movement.
The Sun Is Waiting, Are We Ready?
Building a solar Bharat isn't easy. It's a complex path—full of hurdles in policy, finance, technology, and perception.
But the opportunity before us is enormous: Clean skies, energy security, job creation, and global leadership in green technology. What's stopping us?
The sun rises every day. It's clean, reliable, and limitless. Bharat doesn't need to wait for miracles from outside. The miracle is already here, waiting for us to harness it.
Let's build the new Bharat—powered by sunlight, united by purpose, and driven by vision.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Energy storage to hit record high
Energy storage to hit record high

Economic Times

time14 hours ago

  • Economic Times

Energy storage to hit record high

Synopsis India's energy storage sector witnessed a record surge in July, with states tendering 8.1 GWh of capacity. Auctions revealed a record low tariff of ₹3.13 per unit for solar-plus-storage projects. This growth is driven by states seeking round-the-clock energy and utilizing the new viability gap funding scheme for battery energy storage systems. India's energy storage push hit a record in July, with states tendering 8.1 GWh of capacity, the highest-ever for a discovered a record low tariff of ₹3.13 per unit in solar-plus-storage projects with four hours of storage last discovered record tariff in the same category-with four hours of storage supply- was ₹3.32 per storage projects are gaining pace as states opt for round-the-clock energy, fulfil renewable purchase obligations, and manage evening peak demand with support from the new viability gap funding (VGF) scheme for battery energy storage system (BESS).The power ministry recently launched the VGF scheme for BESS of up to 30 GWh capacity with support from the Power System Development Fund (PSDF). This is in addition to the 13.2 GWh already in place. With the new VGF scheme window open for a year, states are trying to make the most of it, according to industry experts."Battery storage capacities have been increasing not just in the number of projects being set up, but also in the size of projects," said Debmalya Sen, president, India Energy Storage Alliance (IESA).Recent bids from Rajasthan, Gujarat, and Maharashtra have shown 2 GWh and 4GWh capacities being shared under the new VGF scheme, Sen a third of the 30 GWh capacity in the scheme has been tendered tariff discoveries have been supporting the aim to set up higher capacity-projects with 4-hour one-cycle gaining traction and rates falling to ₹3.59 lakh/MW/month from 4.41 lakh/MW/month in six months.

Energy storage to hit record high
Energy storage to hit record high

Time of India

time14 hours ago

  • Time of India

Energy storage to hit record high

India's energy storage push hit a record in July, with states tendering 8.1 GWh of capacity, the highest-ever for a month. Auctions discovered a record low tariff of ₹3.13 per unit in solar-plus-storage projects with four hours of storage supply. Explore courses from Top Institutes in Please select course: Select a Course Category healthcare Design Thinking Data Science MCA Product Management PGDM Others Leadership Public Policy Degree Data Science others Healthcare Digital Marketing Project Management Cybersecurity Data Analytics CXO Operations Management Technology MBA Finance Management Artificial Intelligence Skills you'll gain: Duration: 11 Months IIM Lucknow CERT-IIML Healthcare Management India Starts on undefined Get Details The last discovered record tariff in the same category-with four hours of storage supply- was ₹3.32 per unit. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like 15 most beautiful women in the world Undo Energy storage projects are gaining pace as states opt for round-the-clock energy, fulfil renewable purchase obligations, and manage evening peak demand with support from the new viability gap funding (VGF) scheme for battery energy storage system (BESS). The power ministry recently launched the VGF scheme for BESS of up to 30 GWh capacity with support from the Power System Development Fund (PSDF). This is in addition to the 13.2 GWh already in place. Live Events With the new VGF scheme window open for a year, states are trying to make the most of it, according to industry experts. "Battery storage capacities have been increasing not just in the number of projects being set up, but also in the size of projects," said Debmalya Sen, president, India Energy Storage Alliance (IESA). Recent bids from Rajasthan, Gujarat, and Maharashtra have shown 2 GWh and 4GWh capacities being shared under the new VGF scheme, Sen added. Almost a third of the 30 GWh capacity in the scheme has been tendered out. The tariff discoveries have been supporting the aim to set up higher capacity-projects with 4-hour one-cycle gaining traction and rates falling to ₹3.59 lakh/MW/month from 4.41 lakh/MW/month in six months.

KSEB's battery energy storage system project at Mylatti gets regulatory commission's nod
KSEB's battery energy storage system project at Mylatti gets regulatory commission's nod

The Hindu

time20 hours ago

  • The Hindu

KSEB's battery energy storage system project at Mylatti gets regulatory commission's nod

A Kerala State Electricity Board (KSEB) proposal to establish its first battery energy storage system (BESS) at Mylatti in Kasaragod district has received the Kerala State Electricity Regulatory Commission's nod. In an order on Friday (August 1, 2025), the commission ratified the KSEB's decision to launch the bidding process for the project, which is being set up at the KSEB sub-station at Mylatti with a viability gap funding of ₹135 crore from the Union Power Ministry. The BESS project has a capacity of 125 megawatts (MW)/500 Megawatt Hour (MWh) where MW denotes the maximum amount of power that it can deliver at a given moment, and MWh, the total amount of energy that the system can store. The commission has also approved the tariff of ₹4.41 lakh per MW per month quoted by JSW Neo Energy Ltd and the trading margin of 7 paise per unit payable by KSEB to the Solar Energy Corporation of India, which the KSEB has engaged as the BESS implementing agency. The BESS at Mylatti is one of several planned by the KSEB as part of enhancing storage capacity for handling the surplus solar power generated during the daytime. BESS projects are also planned at the substations at Sreekantapuram in Alappuzha district, Pothencode in Thiruvananthapuram, Mulleria in Kasaragod and Areacode in Malappuram.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store