logo
Majority to see reduced electricity bills despite tariff restructuring, says PM

Majority to see reduced electricity bills despite tariff restructuring, says PM

The Star3 days ago
PETALING JAYA: Despite the restructuring of the electricity tariff, over 85% of domestic users will see a reduction in their electricity bills from July, Prime Minister Datuk Seri Anwar Ibrahim has assured critics.
"Although the restructured electricity tariff began in July, the people's electricity bill has not increased," he said during a special announcement broadcast on national television and his social media pages on Thursday (July 23).
He mentioned that some users experienced a reduction of up to 14% compared to the first half of the year.
"This is unlike the slander that was spread," he remarked.
"When the tariff increased, the cost would reduce, hence the bill would be lower. Check your electricity bills," he urged.
The Electricity Tariff Restructuring came into effect on July 1.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Thailand, Cambodia agree to ceasefire
Thailand, Cambodia agree to ceasefire

The Star

time36 minutes ago

  • The Star

Thailand, Cambodia agree to ceasefire

The country and Cambodia have agreed to a ceasefire and to withdraw their troops from the border, says the Malaysian government. Prime Minister Datuk Seri Anwar Ibrahim said both countries had agreed but requested some time, as their troops were already stationed at the border and needed time to pull back. Malaysia currently holds the chairmanship of Asean, of which Thailand and Cambodia are both members of the regional bloc. Earlier, acting Thai Prime Minister Phumtham Wechayachai had warned that cross-border clashes with Cambodia that have uprooted more than 130,000 people 'could develop into war', as the countries traded deadly strikes for a second day. A long-running border dispute erupted into intense fighting with jets, artillery, tanks and ground troops on Thursday, and the UN Security Council is set to hold an emergency meeting on the crisis. A steady thump of artillery strikes could be heard from the Cambodian side of the border yesterday, where the province of Oddar Meanchey reported one civilian – a 70-year-old man – had been killed and five more wounded. More than 138,000 people have been evacuated from Thailand's border regions, its health ministry said, reporting 15 fatalities – 14 civilians and a soldier – with a further 46 wounded, including 15 troops. 'We have tried to compromise as we are neighbours, but we have now instructed the Thai military to act immediately in case of urgency,' said Phumtham. 'If the situation escalates, it could develop into war – though for now, it remains limited to clashes,' he said in Bangkok. Fighting resumed in three areas around 4am yesterday, the Thai army said, with Cambodian forces firing heavy weapons, field artillery, and BM-21 rocket systems, and Thai troops responding 'with appropriate supporting fire'. But in the afternoon, foreign ministry spokesman Nikorndej Balankura said there were signs the fighting was easing off, and said Thailand was open to talks. Cambodia has stayed tight-lipped about its casualty numbers, but AFP journalists saw four wounded soldiers and three civilians receiving treatment at a hospital in Oddar Meanchey. The soldiers said they were injured during the fighting on Thursday, while the civilians said they were hit by shrapnel. In the Cambodian town of Samraong, 20km from the border, journalists saw families speeding away in vehicles with their children and belongings as gunfire erupted. 'I live very close to the border. We are scared,' Pro Bak, 41, said. He was taking his wife and children to a Buddhist temple to seek refuge. The fighting marks a dramatic escalation in a long-running dispute between the neighbours – both popular destinations for millions of foreign tourists – over their shared 800km frontier. Dozens of kilometres in several areas are contested and fighting broke out between 2008 and 2011, leaving at least 28 people dead and tens of thousands displaced. A UN court ruling in 2013 settled the matter for over a decade, but the current crisis erupted in May when a Cambodian soldier was killed in a new clash. Fighting on Thursday was focused on six locations, according to the Thai army, including around two ancient temples. Ground troops backed up by tanks battled for control of territory, while Cambodia fired rockets and shells into Thailand and the Thais scrambled F-16 jets to hit military targets across the border. Both sides blamed each other for firing first, while Thailand accused Cambodia of targeting civilian infrastructure, including a hospital hit by shells and a petrol station hit by at least one rocket. The United States urged an 'immediate' end to the conflict, while Cambodia's former colonial ruler France made a similar call. The EU and China – a close ally of Phnom Penh – said they were 'deeply concerned' about the clashes, calling for dialogue. — AFP

Five-season padi planting in two years reforms country's padi ecosystem
Five-season padi planting in two years reforms country's padi ecosystem

New Straits Times

time43 minutes ago

  • New Straits Times

Five-season padi planting in two years reforms country's padi ecosystem

JERLUN: The Five-Season Padi Cultivation Programme in the Muda Area in Kedah will bring about comprehensive reforms to the country's padi and rice industry ecosystem, said Prime Minister Datuk Seri Anwar Ibrahim. Anwar said this would at once reduce dependence on imports and strengthen the country's rice self-sufficiency rate. "This initiative is very close to my heart. Therefore, rapid implementation and effective coordination are very important to increase the capacity of local rice farmers and ensure more sustainable harvests," he said in a statement to the media here yesterday. In this regard, Anwar called on the state government and the Ministry of Agriculture and Food Security (KPKM) to continue to act promptly and in an integrated manner to make this important agenda a success. He said the Madani government listens to the voices of rice farmers, understands their needs and is determined to continue to empower this sector through various ongoing initiatives. This, he said, also proves the concern and determination of the Madani government in defending the fate of farmers, the backbone of the country's agro-food sector. Earlier, the Prime Minister also conducted a working visit to one of the main infrastructure development projects under the Five-Season Padi Cultivation Programme in Two Years in the Muda Area in Batu 7, Kampung Kemboja, Ayer Hitam near here. Also present in the visit were Home Minister Datuk Seri Saifuddin Nasution Ismail, Kedah Menteri Besar Datuk Seri Muhammad Sanusi Md Nor and Muda Agricultural Development Board (Mada) chairman Datuk Dr Ismail Salleh. Meanwhile, according to a statement issued by Mada, the Prime Minister's visit was his second visit to the project site to review the progress of agricultural infrastructure development. This was in preparation for the implementation of smart agriculture, in line with the government's efforts to strengthen the country's food supply and increase local rice production. "This project currently being implemented focuses on upgrading the irrigation and drainage system and strengthening the use of modern technology in the padi cultivation sector. "It is being implemented through a Public Private Partnership approach, which not only supports the intensification of planting activities, but is also able to increase the productivity of padi farmers and increase their income," said Mada. According to Mada, the programme is also seen as a strategic effort to bring about major reforms in the country's padi and rice industry, in line with the goals of the Madani government. The statement said with the implementation of five planting seasons within two years, the country is expected to be able to reduce its dependence on imported rice and increase the level of self-sufficiency (SSL) for this strategic commodity. This development project includes two main components, namely the construction and maintenance of 15 Tertiary Irrigation System Blocks (Project 1) and the Pedu Dam Phase 1 Comprehensive Rehabilitation Project (Project 2), which involves a total allocation of around RM1 billion.

The RM2.5b giveaway that Malaysia can't afford
The RM2.5b giveaway that Malaysia can't afford

Malaysiakini

time43 minutes ago

  • Malaysiakini

The RM2.5b giveaway that Malaysia can't afford

COMMENT | When Prime Minister Anwar Ibrahim delivered his 'Penghargaan Untuk Rakyat' speech on 23 July 2025, he painted a confident picture of Malaysia's economic trajectory. Growth stood at 4.4 percent for the first quarter of 2025, with expectations of 4.5 percent in the second. The ringgit had strengthened against the US dollar, climbing to RM4.23/US$. Malaysia rose by 11 spots to 23rd place in the World Competitiveness Index, and total approved investments reached a record RM384 billion last year. However, beyond the headline figures lies a more complex and fragile reality. Analysts have pointed out that Q1 growth underperformed market expectations. Exports remain uneven. Domestic consumption is cooling, and Bank Negara's recent rate cut reflects the underlying weakness that persists despite upbeat official messaging. If this is truly a period of recovery, it should have been...

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store