
42 tin sheet shelters damaged as nine LPG cylinders explode in Tirupur
Sharadha Devi of Tirupur city had built 42 tin-sheet shelters for workers on 15 cents of land at MGR Colony opposite to the Chikkanna Government Arts College. She collected Rs 1,300 from the workers as monthly rental for each tin-sheet shelter.
People from Tiruvannamalai district, who were engaged in construction and other work in Tirupur, were staying in the shelter along with some guest workers from other states.
Most of them went for work on Wednesday morning, with only a few women remaining there.
Police said that due to a gas leakage, a blast occurred in one shelter and the fire spread rapidly from one shelter to another. The women who were present there managed to escape from the shelter. Subsequently, eight more LPG cylinders exploded one after another, filling the area with smoke.
Concrete roof houses located a few metres away from the spot were unaffected.
by Taboola
by Taboola
Sponsored Links
Sponsored Links
Promoted Links
Promoted Links
You May Like
Is it legal? How to get Internet without paying a subscription?
Techno Mag
Learn More
Undo
All 42 tin-sheet shelters were damaged in the blast.
Fire and rescue services personnel arrived with two fire tenders. However, they were initially unable to enter the area due to heavy smoke.
Police reported that residents living more than a km away from MGR Nagar heard the blast. Firefighters brought the blaze under control after a three-hour struggle.
Aadhaar cards, educational certificates and gold ornaments were destroyed in the fire. People who were residing at the shelter home were distraught after losing their belongings in the mishap. Tirupur South MLA K Selvaraj met the workers and assured them that he would arrange food and accommodation for them.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


United News of India
an hour ago
- United News of India
TN has 1,303 Nilgiri Tahr
Chennai, Aug 5 (UNI) Tamil Nadu a total population of 1,303 Nilgiri Tahr according to a report released today after the Second Synchronized Survey of Nilgiri Tahr. The Project Nilgiri Tahr is a species specific conservation project to conserve the state animal of Tamil Nadu. The Project Nilgiri Tahr was launched by Chief Minister M K Stalin on October 12, 2023 with an outlay of Rs.25.14 crore. It has nine different components which are focusing on Nilgiri Tahr protection, conservation, management of population, assessing its home range, technological interventions, adoption of different scientific methodologies on par with international standards, involving elite international and national experts in different aspects of projects. One among the activity of Project Nilgiri Tahr is Annual Synchronized Survey of Nilgiri Tahr in Tamil Nadu. Since inception of the project, the first synchronized survey was carried out in 140 survey blocks in the year 2024 for three consecutive days with selected regions of Kerala. Currently the second synchronized survey was conducted in 177 survey blocks of 14 Nilgiri Tahr holding forest divisions in Tamil Nadu for four days from April 24 to 27, 2025. The survey was conducted in the month of April, coinciding with the sightings of both mothers and young within the population. The Nilgiri Tahr young one is born between December and January. Hence, the April month is ideal for sighting of adult female and young, and the environmental conditions is favourable with greater visibility. The second synchronized survey of Nilgiri Tahr report was released at Guindy Children's Park here today. Tamil Nadu Forest Minister R.S. Rajakannappan released the survey report in the presence of Ms Supriya Sahu, Additional Chief Secretary, Department of Environment, Climate Change and Forest, Principal Chief Conservator of Forests and Chief Wildlife Warden Rakesh Kumar Dogra, Dr. Yash Veer Bhatnagar - IUCN Country Representative, among others. The second synchronized survey report of the Nilgiri Tahr was released in collaboration with the Kerala Forest Department. In this event, A. Forest and Wildlife Protection Minister of Kerala, participated in the program online. MORE UNI GV 1730


India Today
2 hours ago
- India Today
Stranger lends Rs 2,800 to Reddit user, says keep it as Rakshabandhan gift
An unexpected act of kindness in response to a Reddit post left a user pleasantly surprised when a stranger stepped in to offer financial help during a moment of post, titled "A stranger helped me with Rs 2.8k during a desperate moment and then," was shared on the subreddit 'r/Indiasocial'.In it, the Reddit user recalled how a complete stranger came to his aid during one of the lowest points in his "I was in a really low place, rent overdue, loan repayments hanging over me, and I had absolutely no way to get money in time. My PayPal wasn't working, and I was supposed to receive payment from an international client. My options were running out, and honestly, I felt helpless," he added that he asked Reddit for help, not expecting much. "If anyone with a working PayPal + UPI could help me out," he his surprise, a stranger not only responded but also sent him Rs 2,800, no questions asked. "She sent me 2,800 from her own pocket. No conditions. No second thoughts. Just out of kindness."When he insisted on returning the amount, the woman declined, asking him to treat it as a raksha bandhan gift from an elder sister."That kind of kindness from someone who doesn't even know me? It meant everything in that moment," he said, adding, "I still plan to return it one day, not because she asked, but because she deserves it."He concluded the post with a heartfelt message: "If you ever wonder whether genuine, good-hearted people still exist, they do. And sometimes, they show up when you need them most. I hope God gives her the best life possible."Take a look at the post here:The post struck a chord with social media users, with many sharing their own experiences in the comments section."This is how people's lives are changed. My mom, a government teacher, once helped a student with college admission fees. Three years later, the student returned the 20,000 after receiving his first salary. It wasn't a huge amount for us, but it probably changed his life," a user user shared their family saying, Jitna paisa baantoge, utna ayega. They added, 'I've helped many people over the past three years. I know I'm blessed with privilege, and helping those in need is the least I can do. Believe in good deeds!'As responses continue to flood the comments section, the post serves as a reminder that even small acts of kindness can make a big difference.- Ends


News18
3 hours ago
- News18
Mumbai Metro-5: The Link That Will Connect Thane To Kalyan, Ease Suburban Office Travel To City
Last Updated: Mumbai Metro orange line: What will be the route of Thane, Bhiwandi, Kalyan Mumbai Metro-5? How much work is done? By when will it be ready? Will it connect to Mumbai Metros? The Mumbai Metro-5, the orange line that will connect Thane, Bhiwandi and Kalyan, will offer much-needed respite to suburban travellers coming to city offices. What will be the route? How much work is done? By when will it be ready? All you need to know about Rs 8,416-crore line. Mumbai Metro-5 will be a 24.90-km elevated line with a 3-km underground segment in Bhiwandi. It will have 15 elevated stops: Kapurbawadi (Thane), Balkum Naka, Kasheli, Kalher, Purna, Anjurphata, Dhamankar Naka, Bhiwandi Station, Gopal Nagar, Temghar, Rajnouli, Gove Gaon, Kon Gaon, Kalyan Station, Kalyan APMC Market Mumbai Metro-5: What is the cost and funding? Mumbai Metro-5: How far has the construction progressed? Phase 1 (Kapurbawadi-Dhamankar Naka, 12.81 km) 99% complete as of June 2025; viaduct, piers, girder works nearly fully done; station structures (spine and wings) at 100% Phase 2 (Bhiwandi to Kalyan, 12 km) On hold; route being revised with underground option due to rehabilitation issues; 80% complete on Phase 1; Phase 2 delayed pending tunnelling approvals Expect full commissioning of Phase 1 by end 2025 and Phase 2 by 2027 or later Mumbai Metro-5: Rolling Stock & Capacity Designed for 6 coach trains carrying about 1,756 passengers/trip Estimated daily ridership: 3.0-3.3 lakh by 2031 Mumbai Metro-5: Timings & Frequency Operating hours likely 6:00 AM–10:00 PM (in line with other Mumbai metro lines) Frequency: How will Mumbai Metro-5 save travel time? Road commute along Ghodbunder Road currently takes 60-80 min; metro will trim it to roughly 20-30 min — a 50–75% reduction. How will Mumbai Metro-5 impact office commute? Will connect underserved corridors: Thane–Bhiwandi–Kalyan, easing suburban rail overload Enhance access for office-goers travelling towards Thane and Mumbai Facilitate transit to logistics and commercial hubs, reduces congestion and pollution Offers predictable, express travel across major suburban zones Ideal for daily corporate commuters across Thane, Bhiwandi, Kalyan belt Helps reduce delays, road stress, and unpredictability common with vehicular traffic. Will Mumbai Metro-5 be connected to other Metros? Line 4 (Green): Kapurbawadi Junction Line 12 (Orange southern): Kalyan (planned extension toward Taloja) Central Railway: Kalyan Station (Indian Rail) Future extension to Ulhasnagar and Ambernath (Chikhloli Station) in Phase 2, connecting suburbs to metro network. Transfers planned to be seamless with integrated platforms and shared facilities at interchange hubs. Probable fare chart (based on consistent slab pricing): Rs 10 (≤ 2 km), Rs 20 (2–5 km), Rs 30 (5–12 km), Rs 40 (12–18 km), Rs 50 (18–24 km) Buying Reminders: Top up smart cards only at official counters or apps Check trip distance before swiping Be aware of last-train schedules (10 PM) Use women's coach where available; keep emergency contacts handy Will Mumbai Metro-5 be integrated with other public transport? Interlinks with Central Railway at Kalyan Minimal early-stage rail connectivity along the route; future interchange at Anjurphata / Bhiwandi rail hub Bus stands and suburban rail hubs near many stations; multi-modal access envisaged through future infrastructure improvements What future extensions & connections have been planned for Mumbai Metro-5? Phase 2 extensions: Bhiwandi-Kalyan, including an underground segment (underway) Metro Line 12: from Kalyan to Taloja via Dombivli planned as continuous Orange corridor top videos View all Proposed spur to Ulhasnagar / Ambernath (Chikhloli) to serve dense residential zones — DPR phase under preparation. With Agency Inputs About the Author Manjiri Joshi At the news desk for 17 years, the story of her life has revolved around finding pun, facts while reporting, on radio, heading a daily newspaper desk, teaching mass media students to now editing special copies ...Read More tags : Maha Mumbai Metro Operation Corporation Ltd Mumbai metro mumbai metro line Mumbai Metro Rail Corporation Mumbai Metropolitan Region Development Authority news18 specials view comments Location : Mumbai, India, India First Published: August 05, 2025, 16:55 IST News cities » mumbai-news Mumbai Metro-5: The Link That Will Connect Thane To Kalyan, Ease Suburban Office Travel To City Disclaimer: Comments reflect users' views, not News18's. Please keep discussions respectful and constructive. Abusive, defamatory, or illegal comments will be removed. News18 may disable any comment at its discretion. By posting, you agree to our Terms of Use and Privacy Policy.