logo
The troubling takeover of Bengaluru's open playgrounds

The troubling takeover of Bengaluru's open playgrounds

The Hindu3 days ago
Blatant attempts to take over the city's open playgrounds have left Bengalureans scrambling to take the legal route. A recent court stay might have temporarily halted the controversial upgrade and proposed expansion of a basketball court in Indiranagar. But the spotlight is right back on a system that has been swallowing up the city's limited open spaces for infrastructure projects, denying children the right to access and freedom to play.
For the collective, I Change Indiranagar (ICIN) and local residents around Victory Grounds in Indiranagar 1st Stage, the protracted legal battle to save the ground has been propelled by a fear: apprehension that the proposed upgrade and development of the basketball court could be a cover to eventually deny access to local children. This trend has been visible in many parts of the city, and the residents are determined not to let it repeat here.
On its part, the Bruhat Bengaluru Mahanagara Palike (BBMP) maintains that the upgraded court will remain accessible to the public and will not be privatised as feared. But both ICIN and the residents around the ground are not convinced. Several playgrounds that were once thriving, energetic hotspots of organic multi-sport activities have disappeared, replaced by flashy, access-controlled sporting facilities.
Disregard for open spaces
But more troubling is the disregard for open spaces in the land acquisition process for mega infrastructure projects. In a telling example, anthropologist and seasoned rights campaigner Usha Rao draws attention to three playgrounds taken over for the Namma Metro Line along a three-kilometre stretch: The Chhota Maidan in Shivajinagar, the Bamboo Bazaar Banda Ground and the Pottery Town playground.
The Banda Ground has been Usha's research focus for long. 'I have been studying it personally over so many years. It was a free space for very low income communities in an area where there are no large plots, and the roads are narrow and dangerous for children to play. It was also a community space. It was an Idgah ground with prayers and a place of celebration for Christmas, Ganapathy, Deepavali and other festivals. There is a mixed community around. Plus, at any point of time, one could see some 12 games going on,' she recalls.
In the original plan, Banda Ground was not the location for the Namma Metro station on the Gottigere-Nagawara Line. The station was to come up near the Cantonment Railway Station, aiding seamless shifts for passengers from one mode of transport to another. However, despite opposition from citizens and public transport experts, the location was shifted disrupting community life in and around the ground.
Barely a kilometre away is the site of the Metro's Pottery Town Station, once a dynamic community space and the only playground within a 3 km radius. Although part of the Pottery Town Government High School, this ground was open to children from Benson Town, Jayamahal and Williams Town to play football, cricket and other games. Today, the place is abuzz with construction activity.
Livability challenged
The takeover of playgrounds strikes at the very heart of Bengaluru's livability. Beyond traffic, this too has been a factor in lowering the city's score in global livability indices. As Usha points out, these open spaces go beyond games and double up as spots where children socialise, mix with people from different strata of society. Youngsters develop social skills through play, building friendships, learning to collaborate and resolve conflicts. These accessible play areas often nurture community cohesion while promoting mental health through physical activity.
Advocates for accessible public spaces wonder whether these factors are considered at all in the land acquisition process for big projects. To make way for a Metro Line, the Bengaluru Metro Rail Corporation Limited (BMRCL) had earlier taken over the Jakkarayanakere playground, once a popular hangout for children in and around Seshadripuram. It is now only a nostalgic memory.
'Pay and play' exclusivity
The mushrooming of 'pay and play' sporting arenas across the city have indeed increased options for those who can afford them. Mobile apps allow people to book slots, the rates of which are inevitably out of reach of children from lower income groups. 'Kids from the neighbouring Binnamangala slum at the intersection of Indiranagar 100ft Road and Old Madras Road use the Victory Ground. Even the basketball court was used by these children,' says Sneha Nandihal from ICIN.
Active resistance from local residents have achieved success in the past in a few cases. An attempt to take over a shared playground in Thippasandra had met with vocal, multi-pronged protests by residents of the nearby Geethanjali Layout five years ago. As civic activist Jagadeesh Babu recalls, the move to put up a private cricket academy was challenged by citizens, who flooded the Palike Joint Commissioner with hundreds of SMSes and WhatsApp messages seeking action. Mounting protests eventually led to scrapping of the project.
Rising development pressure in the city's Central Business District (CBD) has reduced open spaces, with institutions prioritising infrastructure over play, says Rajeev G. Malagi, Programme Manager, Sustainable Cities and Transport at the World Resources Institute (WRI) India. 'Lifestyle shifts and mobile usage have further contributed to declining physical activity and youth well-being,' he explains.
URDPFI guidelines
The Centre's URDPFI (Urban and Regional Development Plans Formulation and Implementation) guidelines recommend 10 to 12 sqm of open space per person, he points out. 'However, Bengaluru is working towards achieving this. There is an urgent need to revive and strengthen Bengaluru's school playgrounds and open spaces to re-engage youth with the outdoors, supporting their holistic development while also enhancing the city's climate resilience and creating livable environments.'
Rajeev's recommendations to re-establish open spaces are these: Mandate all new schools to provide open play areas proportionate to student strength; transform school playgrounds into sports training centres accessible to youth and local communities; and create an interconnected network of open spaces including parks, playgrounds and public facilities. This network could be integrated with accessible public transport, walking and cycling infrastructure to support active urban living.
While decades-old playgrounds are being acquired for multiple projects, new open spaces are not being created. Usha warns that this will have large repercussions on generations to come. 'If an underground Metro station is built in place of a playground, will the space above become available for the children? No. Such places will be completely under security cameras with shops. It is a complete loss,' says the anthropologist, indicating the need for a total policy rethink on open spaces in the city.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Will take steps to ban lighters if voted to power, says EPS
Will take steps to ban lighters if voted to power, says EPS

New Indian Express

time34 minutes ago

  • New Indian Express

Will take steps to ban lighters if voted to power, says EPS

THOOTHUKUDI: AIADMK general secretary Edappadi K Palaniswami said he would take steps to ban cigarette lighters and include 'kadalaimittai' in the nutritious meal scheme if he is elected to power. He said this during his 'Makkalai Kaappom, Thamizhagathai Meetpom' campaign in Thoothukudi, on Friday. He interacted with the safety match industrialists and groundnut candy makers at a private hall in Kovilpatti. Later in the evening, he held a road show from the Fire Station to Anna Bus Stand in Kovilpatti town. While safety match producers urged to ban cigarette lighters, the 'kadalaimittai' makers wanted the traditional candy to be included in the nutritious meal scheme for the welfare of the families behind the industry. Taking a dig at the DMK government, he said that the DMK and its allies are trembling due to the BJP-AIADMK alliance. On DMK's onslaught against the union government for not disbursing the funds to the state, Palaniswamy termed it a slanderous remark. 'If there is a fund crunch, what was the need to organise a (Formula 4) car race, or make plans to install pen statue for former CM M Karunanidhi in sea?' he questioned. Charging that law and order in the state has deteriorated, he said Tamil Nadu police was once regarded as being on a par with Scotland Yard, but has now become a cahoots of the DMK. Further, EPS promised to revive the Thamirabarani-Vaippar link scheme when he comes to power, and provide sarees to women during Deepavali festival.

Disquiet continues at Kerala University as V-C dissolves meeting over Registrar's presence
Disquiet continues at Kerala University as V-C dissolves meeting over Registrar's presence

The Hindu

time13 hours ago

  • The Hindu

Disquiet continues at Kerala University as V-C dissolves meeting over Registrar's presence

The power struggle at Kerala University raged on after Vice-Chancellor in-charge Mohanan Kunnummal abruptly dissolved a crucial meeting on Friday (August 1, 2025), citing objections to the presence of Registrar K.S. Anil Kumar, whose suspension remains a bone of contention. The online meeting was convened to discuss the utilisation of ₹100 crore allocation under the Centre's PM-USHA scheme. While the meeting was originally intended to be attended by members of the Board of Governors constituted for project implementation, the presence of others including Dr. Kumar and Syndicate members J.S. Shijukhan and R. Rajesh angered the Vice-Chancellor. While they refused to exit the virtual meeting on being asked, Dr. Kunnummal called off the proceedings. Sources said a heated argument broke out between the Vice-Chancellor and the Syndicate members, causing further disruption. Following the incident, the Vice-Chancellor issued a directive stating that the Syndicate hall be opened only during official committee meetings. He barred 'unauthorised entry' into the room by Syndicate members. He also instructed the staff to lock and secure the hall. Earlier, Left-backed Syndicate members reportedly engaged in an argument with a section of employees after the former summoned a few staff to the Syndicate room, questioning their compliance with the Vice-Chancellor's directive to restrict digital file access for the Registrar. This prompted the members of the Congress-backed university staff union to enter the Syndicate room in protest. They also alleged that the Syndicate members used inappropriate language towards the staff.

Setback for Bengaluru Suburban Rail Project: L&T quits over land delays, BJP MPs slam government
Setback for Bengaluru Suburban Rail Project: L&T quits over land delays, BJP MPs slam government

Hindustan Times

time16 hours ago

  • Hindustan Times

Setback for Bengaluru Suburban Rail Project: L&T quits over land delays, BJP MPs slam government

The exit of Larsen & Toubro (L&T) from two key corridors of the Bengaluru Suburban Railway Project (BSRP) has triggered sharp political criticism, with BJP MPs blaming the Congress-led Karnataka government for bureaucratic delays that have stalled the city's long-awaited transit project. Bangalore Central MP PC Mohan said the exit reflects a 'betrayal' of Bengalureans. (Getty Images / Representational Photo) Bangalore Central MP PC Mohan said the exit reflects a 'betrayal' of Bengalureans. 'L&T exits Bengaluru Suburban Rail Corridors 2 and 4 citing only 8.28% land handover in 2 years. K-RIDE failed because the State Government did not clear land in time. This delay betrays Bengalureans. The Congress Govt must fix K-RIDE and remove land hurdles immediately,' Mohan posted on X (formerly Twitter). Echoing similar concerns, Bangalore South MP Tejasvi Surya blamed the state's lack of urgency. 'Bengaluru Suburban Railway Project is struggling due to @KridePrm's bureaucratic chaos,' he wrote. 'This reflects the current state of governance, a lack of initiative and interest by the state in moving things forward.' The criticism comes after L&T has formally terminated its contract for executing Corridors 2 and 4 of BSRP. In a letter addressed to the Managing Director of the Rail Infrastructure Development Company (Karnataka) Ltd (K-RIDE), L&T cited the failure to provide sufficient encumbrance-free land, which rendered further construction unfeasible, The New India Express reported. According to the publication, the letter stated that since the Letter of Acceptance was issued in August 2022, only 8.28% of usable land had been handed over to the contractor despite repeated assurances. This led to massive cost overruns, idle resources, and project delays. Following this, L&T submitted a closure report and approached the Commercial Court in Bengaluru, which has now granted an interim injunction restraining K-RIDE from invoking L&T's bank guarantees. Additionally, L&T is seeking approximately ₹500 crore in compensation for Corridor 2 and about ₹150 crore for Corridor 4, the TNIE report added. The termination is a major setback for the ₹15,767 crore suburban railway project, originally sanctioned in October 2020 with a six-year completion timeline. (Also Read: DK Shivakumar says over 9,700 garbage complaints resolved in Bengaluru, residents react)

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store