Update on Glen Innes fire
Photo:
Supplied
A fire in Glen Innes has caused thick black smoke to billow over the Auckland suburb this morning.
About 50 firefighters have been battling a blaze in a Work and Income building.
Crews were called to Mayfair Place at about 7am.
RNZ reporter Finn Blackwell speaks to Kathryn from the site.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles

RNZ News
5 hours ago
- RNZ News
Couple's church restoration gets historic places nod
Michael Simpson working on the exterior of the Kakanui Church in Otago, which has now been granted a Category 1 heritage listing. Photo: Supplied/ Michael Simpson & Anna Miles A Waitaki couple's six-year passion project to restore a landmark building has paid off, with the former Kakanui Church granted a top-tier heritage listing. The 155-year old Gothic-style building in Otago was one of two surviving Presbyterian timber churches in New Zealand designed by prominent Scottish architect Robert Arthur Lawson. Heritage New Zealand this month recognised it as a Category 1 historic place with "special or outstanding historical or cultural significance." Michael Simpson said it had descended into "pretty bad shape" by the time he and his wife Anna Miles bought it in 2019. "The parish church had battled for a few years because they had too many buildings and not enough money to do it up ... there was just a lot of deferred maintenance and like a lot of old buildings, it was hard to keep up with," he said. "We thought, well, we can give it a crack. As sad as it looks ... I like doing up old wooden buildings. It didn't look too scary to me. It scared off a lot of other people. It probably should have really." A Christmas carols event held in the Kakanui Church last year. Photo: Supplied/ Michael Simpson & Anna Miles Simpson said they had worked to restore it "with no time frame", starting with repairing rotten wood in the sub-floor, and restoring the windows. They gave the inside a fresh coat of paint, and more recently the couple turned their focus to the exterior, where they were stripping, refitting and painting the weatherboards. "We're loving how it's starting to look," Simpson said. Photo: Supplied/ Michael Simpson & Anna Miles The couple were also renovating two outbuildings - the Workers' Hut and Sunday School. Simpson said locals had taken a keen interest in the project. "The community was so happy that we were trying to save it. It's been amazing. We never sort of expected that," he said. "We have the doors open when we're down there and anyone that wants to come in and have a look ... can do that. It's just been really nice to share it." A fresh coat of paint on one side of the Kakanui Church, during the restoration. Photo: Supplied/ Michael Simpson & Anna Miles Once the building was weather-tight and stable, Simpson said they had hosted a wedding, market days and gigs in the church. They hoped to keep using it as a community hub. "It's just such a thrill having life in the building and seeing people enjoy it," Simpson said. Heritage New Zealand heritage assessment advisor Alison Breese described the church as having "outstanding aesthetic, architectural and historic significance." "It's been a pleasure seeing the love and hard mahi the owners have put into it," she said. Simpson said the restoration wasn't yet complete, but he and Miles were thrilled to have the building formally acknowledged and protected. "All we wanted to do, with our airy fairy plans, was restore the building as well as [possibly] to give it a life after us. This justifies that feeling, and just adds another sort of string to the bow, recognising it's worth saving," he said. Sign up for Ngā Pitopito Kōrero, a daily newsletter curated by our editors and delivered straight to your inbox every weekday.

RNZ News
2 days ago
- RNZ News
$25,000 spent making Wellington bridge more comfortable for dogs
Teddy, a dog. Photo: SHANON STEVENS / SUPPLIED Paw-friendly panels have been added to a new water pipe bridge in Wellington, making it more comfortable for dogs to walk across. Greater Wellington Regional Council completed a new water pipe bridge in the Kaitoke Regional Park late last year. Nick Leggett, chair of Wellington Water - which manages water pipe bridges for the council - said the bridge formed part of a popular walkway loop, and the park was visited by 350,000 people last year. He said the bridge combined "a critical piece of infrastructure with something that people can use and enjoy". But feedback from the community found the bridge walkway's grate design was both uncomfortable and offputting to dogs, who disliked being able to see below and needed more grip. "The feedback was really positive, but it's just that point where you've got [50] percent of the water supply for the Wellington region coming under this bridge but you've also got 350,000 people who use that park, and it's important that both are catered for. "But we can combine critical infrastructure with critical walking infrastructure." Cr Ros Connelly and her dog Cuba, and Wellington Water chair Nick Leggett with his dog Teddy. Photo: SHANON STEVENS / SUPPLIED Work began in 2022 to replace the existing pipe bridge due to age, leaks and a lack of seismic loading resilience. Leggett said the total budget for the bridge was $41 million and the panels cost $25,000. "Within that wider budget that's pretty small, but it is still significant - and it's significant for the people [who] will get the benefit of walking across the bridge with their dogs." Leggett and his dog Teddy, a black Cavoodle, tested the bridge on Friday, along with Greater Wellington regional councillor Ros Connelly and her dog, Cuba. Sign up for Ngā Pitopito Kōrero, a daily newsletter curated by our editors and delivered straight to your inbox every weekday.


Otago Daily Times
2 days ago
- Otago Daily Times
Fear more students will leave without NCEA qualifications
By John Gerritsen of RNZ Principals warn the number of school-leavers with no qualifications could spike in poor communities this year. One South Auckland principal said as many as a third of teenagers leaving schools in Northland and South Auckland could have no NCEA certificates - double the normal figures. Their warnings followed the release of results from high-stakes NCEA literacy and numeracy tests held in May. Before the Covid-19 pandemic, 14%-17% of school-leavers in Northland and South Auckland had no qualifications. The after-effects of the Covid lockdowns drove that figure to 21% in 2023. Principals had been hoping numbers would improve, but said pass rates of 39%-49% for Northland and South Auckland teens in NCEA reading, writing and maths tests did not bode well. Looking at the socioeconomic factors, 34% of students from the third of schools facing the highest barriers passed the numeracy assessment, 41% passed reading and 35% passed writing. Students could attempt the tests again in September, but Papakura High School principal Simon Craggs said it was likely a significant number would fail and leave without an NCEA qualification. ''A third would probably be realistic because you're going to have students in year 13 who still haven't achieved the corequisites despite having year 11, year 12 working toward them,'' he said. Craggs said schools were working hard to help students over the line - either by preparing them for the September tests or through the 20 English and maths credits they could use until 2027 to meet the benchmark. Aorere College principal Leanne Webb said she had hoped the unqualified school-leaver rate would improve this year, but there was a danger more young people would leave school unable to enrol in further study because they had failed the tests. ''They'll walk away from school, there'll be no recognition of what they have achieved at school and when times are tough, and times are tough, and there aren't sufficient places in tertiary organisations for them, who gets shoved to the bottom of the heap? It'll be the kids that don't have a qualification. "What is there for them then? Do they just get to roam the streets?'' Webb said her students' achievement of the literacy and numeracy co-requisite had improved, but for many that was due to the alternative 20-credit pathway rather than the online tests. The problem with that option was the 20 credits could not be counted towards the 60 required for an NCEA certificate, she said. ''If you take away 10 credits out of their English achievement and 10 credits out of their maths achievement, they then have to get another 20 credits on top of their programme in order to get NCEA - that's the problem. ''Last year, while we were pleased with our results. It came at the expense of achieving NCEA.'' Both principals said their students were doing better than last year, but government-funded assistance had not been much help. Webb said her school did not take up the offered training because it did not fit with the school's timetable and Craggs said the training was of limited use. "I don't think the on-the-ground support that we have been looking for has really been provided. So we're just doing our own thing and working within our own resources to improve," he said. "There's certainly a lot more interest from our senior advisers at the ministry in our results and how things are going, but not a lot in the way of support." The next round of literacy and numeracy tests is scheduled for September.