logo
Haryana aims to rejuvenate 37k hectares of its Aravali region

Haryana aims to rejuvenate 37k hectares of its Aravali region

Time of India17-06-2025
Gurgaon: Haryana unveiled a comprehensive forest landscape restoration (FLR) initiative on Tuesday to mark World Day to Combat Desertification and Drought.
The four Aravali states participated in a workshop in Jodhpur to unveil this plan, which aimed to restore the degraded Aravalis.
Tired of too many ads? go ad free now
This multi-faceted plan by Haryana aims to rejuvenate 37,017 hectares of its Aravali region, where 69.5% of the degraded area is classified as forest land, followed by 13.2% scrubland and 17.3% degraded agriculture land, according to the ministry of environment, forest and climate change (MoEFCC). The core strategy involves the systematic uprooting of invasive species like Prosopis juliflora, followed by the mixed plantation of indigenous Aravali species.
The initiative aims for the plantation of 1,000 plants per hectare, with three plants per trench. Plus, seeding in patches of Aravali species will be done in equal numbers, and bamboos will be planted in areas with good soil depth where continuous contour trenching is feasible.
The restoration process includes "scattered pit plantation" or "contour trench plantation" on hilly terrains, and the model is based on natural processes, and rainwater will be conserved in situ with indigenous Aravalli and arid region species comprising 25% of the total plants.
"The restoration efforts will be meticulously aligned with existing schemes from multiple ministries, operating under a convergent governance model.
This will involve oversight by district collectors and coordination through inter-departmental committees, ensuring a holistic and integrated approach.
We will be developing strategies for five Aravalis districts for year-long plans. The plan was discussed in Jodhpur today where the nodal officer for Haryana showcased the plan," Haryana's principal chief conservator of forests (PCCF) Vineet Kumar Garg, told TOI.
Tired of too many ads? go ad free now
Joint forest management committees (JFMCs), self-help groups (SHGs), and watershed committees will be a part of the plan with participatory rural appraisals (PRA), detailed mapping exercises, and micro-watershed delineation.
Among the state's Aravali districts, Gurgaon has been worst affected by the environmental crisis, accounting for 13,935 hectares (78.6%) of degraded land, 2,322 hectares (13.1%) of scrub, and 1,464 hectares (8.3%) of degraded agricultural land.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Himalayan springs are drying. It's a threat to India's ecological stability and national security
Himalayan springs are drying. It's a threat to India's ecological stability and national security

Indian Express

time3 days ago

  • Indian Express

Himalayan springs are drying. It's a threat to India's ecological stability and national security

Written by Kabindra Sharma and Vimal Khawas In a village in Darjeeling Himalaya, women now spend over an hour each morning fetching water from a drying spring that once flowed freely just outside their homes. What was once a region abundant in freshwater is now marked by growing scarcity, as springs, the primary source of water for Himalayan communities, are drying up at an alarming rate. This slow but steady disappearance of springs is not merely a rural inconvenience; it indicates a deepening ecological crisis with significant human security implications. The Indian Himalayan Region (IHR) stretches approximately 2,500 km and supports the livelihood of over 50 million people. Known as the 'water tower of South Asia', it is the source of major river systems, including the Indus, Ganges, and Brahmaputra, fed by glaciers and numerous springs. These springs, critical groundwater sources, are vital for local communities and ensure the ecological and hydrological stability of downstream regions. Though 70 per cent of Earth's surface is covered by water, only 2.5 per cent is freshwater, and less than 0.3 per cent is usable. India, home to 18 per cent of the world's population and 15 per cent of its livestock, depends on just 4 per cent of global freshwater resources. According to Central Water Commission, India's per capita water availability has significantly decreased from 5,177 cubic meters in 1951 to 1,486 in 2021 and is projected to decline further to 1,367 cubic meters by urban water crises gain attention, remote Himalayan villages bear the brunt of this scarcity, often overlooked. According to a 2018 report by NITI Aayog, nearly 50 per cent of springs in the IHR are either drying up or have already dried up. Across India, approximately 200 million people rely on spring water, particularly in ecologically fragile mountain systems such as the Himalayas, Western and Eastern Ghats, and the Aravallis. Yet, until recently, these vital sources have received scant attention in national water governance frameworks. The national water policies of 1987 and 2012, which constitute the most comprehensive water policies of India to date, made no mention of springs. This omission reflects a broader pattern of institutional neglect. It was only in 2018 that NITI Aayog released its first report on the Inventory and Revival of Springs in the Himalayas for Water Security, formally acknowledging both the significance and degradation of these sources. Since then, incremental steps have been taken. The Ministry of Environment, Forest and Climate Change, through the National Mission on Himalayan Studies (NMHS), has supported a number of pilot initiatives focused on spring revival. Yet, these efforts remain fragmented and insufficient in scale. Field evidence indicates that a systematic approach is both essential and feasible. Sikkim's Dhara Vikas initiative, launched in 2008, exemplifies sustainable innovation in addressing water scarcity. By employing hydro-geological techniques like contour trenches and percolation pits, the programme has mapped nearly 2,000 springs, reviving approximately 200 springs and six lakes across 1,000 hectares. This effort recharges over 1.7 million litres of groundwater annually, enhancing water access, sanitation, and crop yields for rural communities, demonstrating a scalable model for sustainable water management. Similarly, a pilot project by Sikkim University implemented under the National Mission on Himalayan Studies in a drought-prone Darjeeling village significantly enhanced spring discharge within three years. These examples highlight the effectiveness of community-driven, hydro-geologically informed solutions. However, the consequences of inaction are increasingly apparent. The depletion of springs goes beyond reduced availability fuelling social conflicts. Reports from villages highlight rising disputes over water access often turning into verbal and physical clashes. This erosion of a shared resource is weakening trust and cooperation in rural Himalayan communities, posing both ecological and socio-political challenges. In strategically critical Himalayan border districts, where both civilian and military infrastructure rely on local water systems, drying springs also raise national security concerns. Ensuring water availability is, therefore, vital not only for sustaining livelihoods but also for maintaining national stability. Without a dedicated national framework for spring-shed management, especially in the vulnerable Himalayan region, flagship initiatives like Jal Jeevan Mission (JJM), aiming to provide functional household tap connections to all rural households by 2026, face significant implementation hurdles. Although the Ministry of Jal Shakti's 2019 guidelines acknowledge the need for spring rejuvenation, the focus remains on integrating with overstretched schemes like Mahatma Gandhi National Rural Employment Guarantee Act (MGNREGA), Integrated Watershed Management Programme (IWMP), Finance Commission grants, state initiatives, and discretionary funds such as Members of Parliament Local Area Development Division (MPLADS), Member of Legislative Assembly Local Area Development Scheme (MLALADS), and CSR allocations. This convergence-driven approach, while pragmatic in intent, lacks institutional clarity and long-term sustainability, raising doubts about the effectiveness of current strategies for restoring and preserving drying springs. While the policy shift marks a significant change from earlier frameworks that overlooked Himalayan region's unique hydrological and socio-environmental challenges, it still fails to deliver systemic transformation. The reliance on a uniform, one-size-fits-all policy across India's diverse ecological and topographic landscapes, particularly in the Himalayas, obstructs targeted, locally relevant, and sustainable solutions. Moving forward, policymakers must embrace a tailored, place-based strategy that recognises the ecological complexity, cultural nuances, and hydro-geological distinctiveness of the Himalayan region. This approach is critical for ensuring water security, enhancing long-term resilience, sustaining livelihoods, and maintaining geo-strategic stability in this ecologically fragile and strategically vital part of India. The success of programmes like the JJM depends not only on infrastructure development but also on the sustained availability of source water. In ecologically fragile and water-scarce Indian Himalayas, neglecting the rapid depletion of springs threatens to render water supply infrastructure ineffective, jeopardising efforts to achieve service delivery goals. Sharma is associate fellow, SaciWaters, Secunderabad and Khawas is professor, Jawaharlal Nehru University, New Delhi

Twin tunnel under SGNP gets forest ministry nod
Twin tunnel under SGNP gets forest ministry nod

Hindustan Times

time3 days ago

  • Hindustan Times

Twin tunnel under SGNP gets forest ministry nod

Mumbai: The union ministry of environment, forest and climate change (MoEFCC) has given its final nod for a 4.7-kilometre twin tunnel under the Sanjay Gandhi National Park (SGNP) as part of the Goregaon Mulund Link Road (GMLR). The ministry has directed the SGNP authorities to hand over 19.43 hectares of reserve forest land required for the tunnels to the Brihanmumbai Municipal Corporation 'SGNP being a protected forest in the city, the approval is a major milestone and the final one,' Abhijit Bangar, additional municipal commissioner (projects), told Hindustan Times. The final approval was granted by the forest ministry on Tuesday. Earlier, in January 2024, the ministry had granted in principle approval for the twin tunnel project. The ministry has directed the SGNP authorities to hand over 19.43 hectares of reserve forest land required for the tunnels to the Brihanmumbai Municipal Corporation (BMC). The land will be transferred in accordance with section 2 of the Forest (Conservation) Act, 1980, which restricts de-reservation of forest land for non-forest purposes without approval from the central government. The legal status of the land parcel that will be transferred to the BMC will remain as 'forest', said Bangar. 'The SGNP authorities gave the land on condition that afforestation would be carried out on an equal amount of land in non-forest areas,' he said. Accordingly, the BMC will undertake compensatory afforestation on 19.5 hectares of non-forest land, including 14.95 hectares in Vasanvihira village and 4.55 hectares in Gondmohadi village, both in Chandrapur district. The 12-kilometre-long GMLR, which will connect the eastern and western suburbs of the city, will begin at Dindoshi court as an elevated flyover and descend near the gate of the Dadasaheb Phalke Chitranagari (film city) into a shallow, 1.22-kilometre box tunnel with three lanes till the boundary of SGNP. The 4.7-km twin tunnel, being constructed at a cost of ₹ 6,580-crore, will begin at the western edge of the national park and end at the eastern edge in Bhandup. Civic officials said a shaft was being created on the western end of the tunnel, which would be 60-120 metres deep and hold the tunnel boring machine (TBM). 'TBMs imported from China have reached ports in the city,' said an official. The machine will take at least a year to complete the tunneling, following which a shaft will be sunk on the eastern end.

GMLR twin tunnel: Centre grants final nod for diversion of SGNP forest land to BMC
GMLR twin tunnel: Centre grants final nod for diversion of SGNP forest land to BMC

Indian Express

time4 days ago

  • Indian Express

GMLR twin tunnel: Centre grants final nod for diversion of SGNP forest land to BMC

Over a year since procuring the in-principle (Stage I) approval, Union Ministry of Environment, Forest and Climate Change (MOEFCC) on Tuesday granted the final approval for diversion of 19.43 hectares of forest land at the Sanjay Gandhi National Park (SGNP) to the Brihanmumbai Municipal Corporation (BMC). The clearance has now paved the way for the construction of the twin tunnels, which is being developed within the ambit of the ambitious Goregaon Mulund Link Road (GMLR) project. Pegged at a cost of nearly Rs 6500, the GMRL is an ambitious project which aims to alleviate congestion by linking Goregaon in the western suburbs to Mulund in the eastern suburbs. A crucial part of the GMLR project are the 6.65-km long twin tunnels which will start from the Film City in the western suburbs and open near Mulund's Amar Junction, which currently houses a huge slum pocket. The GMLR tunnels will surpass beneath the SGNP, covering a complex topography of hillocks, forest and farmlands. With the project slated to be constructed through the protected forest lands of SGNP, the state government had sought the Union ministry's approval. Earlier on January 2, 2024, the MOEFCC granted the in-principle clearances for the proposal after examination. On Tuesday, the Union ministry granted the final approval for the diversion of 19.43 hectares of reserves forest area to the BMC under the section 2 of the Forest Conservation Act of 1980. Stage I (in-principle) approval from the central government is the first step towards diverting forest land for non-forest purposes, followed by Stage II clearances. Officials maintained that even as the land parcel has been transferred to the civic body, it continues to hold the legal status of forest land. With the tunnel raking under the SGNP — at a depth of 20 to 160 metres — no trees are expected to be impacted during the course of the project construction. Meanwhile, the civic body has prepared an alternative afforestation plan as per the Forest Act. For the total forest land acquired, over 19.5 hectares of non-forest area in Chandrapur district will undergo plantation and maintenance. Being tucked in an ecologically sensitive zone, the GMLR project has also undergone a slew of studies ranging including Environmental Impact Assessment (EIA), environmental, biological studies by Bombay Natural History Society (BNHS) etc. as well as engineering, geotechnical studies. Since the tunnel is aligned between the Tulsi and Vehar lakes, the project has also undergone hydrological studies. Upon completion, the GMLR project is projected to be estimated to reduce the travel time between the eastern and western suburbs from 75 minutes to 25 minutes. The project is estimated to be completed by October 2028.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store