logo
BSE SME Cryogenic OGS turns up the heat with stellar market entry

BSE SME Cryogenic OGS turns up the heat with stellar market entry

Shares of Cryogenic OGS was trading at Rs 93.76 on the BSE, a premium of 99.49% compared with the issue price of Rs 47.
The scrip was listed at Rs 89.30, a premium of 90% compared with the initial public offer (IPO) price. The stock is currently frozen at its upper limit of 5% over its listing price.
The counter hit a high of Rs 93.76 and a low of Rs 89.30. About 10.80 lakh shares of the company changed hands at the counter.
Cryogenic OGS' IPO was subscribed 646.47 times. The issue opened for bidding on 3 July 2025 and it closed on 7 July 2025. The price band of the IPO was set at Rs 44 to Rs 47 per share.
The IPO comprised fresh issue of 37,80,000 equity shares. The promoter and promoter group shareholding diluted to 73.53% from 100% pre-issue.
The company intends to utilize the net proceeds to meet working capital requirements, public issue expenses and general corporate purposes.
Ahead of the Cryogenic OGS on 2 July 2025, raised Rs 5.04 crore from anchor investors. The board has allotted 10.74 lakh shares at Rs 47 per share to 4 anchor investors.
Cryogenic OGS provides high-quality measurement and filtration equipment and systems through fabrication and assembly for various sectors, including the oil, gas, chemical, and allied fluid industries. Focused on innovation and tailored services, the company offers customized solutions to meet the specific needs of its customers. The companys comprehensive solutions encompass design, process engineering and manufacturing including fabrication, assembly, and testing facilities. It uses AutoCAD ELD software, along with other supporting tools, to prepare detailed designs of its products. As of 31 March 2025, the company had 31 permanent employees.
The company recorded revenue from operations of Rs 32.90 crore and net profit of Rs 6.12 crore for the period ended 31 March 2025.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Sawan Shivratri 2025: Are schools, colleges, banks open or closed on Wednesday, July 23? Check here
Sawan Shivratri 2025: Are schools, colleges, banks open or closed on Wednesday, July 23? Check here

Mint

time26 minutes ago

  • Mint

Sawan Shivratri 2025: Are schools, colleges, banks open or closed on Wednesday, July 23? Check here

Sawan Shivratri 2025: Sawan Shivratri is a significant Hindu festival celebrated during Shravan in the Hindu lunar calendar and dedicated to Lord Shiva. It occurs on the 14th day of the waxing moon phase in the Shravan month. This year, it falls on Wednesday, 23 July 2025, while the Shivaratri Parana takes place at 5:53 am on 24 July 2025. Sawan Shivratri is observed through fasting, prayer, and rituals such as Abhishekam of the Shiva lingam with sacred substances. It is believed that this festival purifies the soul and fulfils wishes. On this day, most public offices, schools, and other institutions are expected to be closed to mark the festival. According to the Reserve Bank of India holiday calendar, all banks across the country will remain open on Wednesday, July 23, 2025. Customers can access all banking services at their nearest bank branches on the occasion of Sawan Shivratri. The Indian stock market will open on Wednesday, July 23, 2025, according to the holiday calendar of NSE and BSE. Hence, the Indian stock market is not closed on Sawan Shivratri. Schools and colleges in multiple states, such as Uttar Pradesh, Madhya Pradesh, Uttarakhand, and Haryana, will reportedly be closed on Wednesday, July 23, 2025, due to Sawan Shivratri and Kanwar Yatra. Notably, no official announcement has been made regarding school closures in Punjab. Therefore, schools will remain open on July 23. There is no holiday for Sawan Shivratri in Telangana; however, a statewide bandh on July 23 may result in school closures. Most government offices across the country are expected to remain open on Wednesday, July 23 2025, as it is not designated as a gazetted holiday by the central government.

UP Cabinet clears 1% stamp duty cut for women, plan for Chitrakoot Link e-way
UP Cabinet clears 1% stamp duty cut for women, plan for Chitrakoot Link e-way

Indian Express

time26 minutes ago

  • Indian Express

UP Cabinet clears 1% stamp duty cut for women, plan for Chitrakoot Link e-way

THE STATE Cabinet on Tuesday approved a proposal to provide a 1 per cent rebate in stamp duty on purchase of properties worth up to Rs 1 crore in the name of women. A plan for the Chitrakoot Link Expressway project also got the green signal during the meeting. Cabinet Minister Anil Rajbhar told mediapersons later that the decision regarding the rebate in stamp duty was made from the 'point of view of women empowerment.' Rajbhar said that so far, this exemption was applicable only on property up to Rs 10 lakh in the state, in which a maximum discount of Rs 10,000 was available. Rajbhar said the move would benefit women from middle-class families in particular. The Cabinet also cleared a proposal for the start of the Monsoon session of the Assembly from August 11. The previous (budget) session of the UP Assembly had taken place from February 18 to March 5. In another significant decision, the Cabinet cleared a proposal for the construction of a four-lane, 15-km Chitrakoot Link Expressway. Industries Minister Nand Gopal Gupta 'Nandi' informed that the project would be completed using the Engineering-Procurement Construction method at an estimated cost of Rs 939.67 crore. He said the 15.172 km expressway would start from Bhartikup and go up to Ahmedganj village. It would connect with the Varanasi-Banda National Highway (NH-35/76) and establish connectivity with National Highway 135 BG, said Nandi. He said the project was aimed at promoting tourism in Chitrakoot as devotees and tourists coming from far-flung areas would also get 'smooth and fast traffic facility to the district.' The construction work will be completed in 548 days and after this maintenance work will be done for five years. There would be no financial participation of the Centre in this project, said Nandi. The Cabinet also cleared a plan to upgrade 121 polytechnic institutes across Uttar Pradesh with the help of Tata Technology Limited (TTL). Cabinet Minister Ashish Patel informed that in collaboration with TTL, these institutes would get a fillip through 'Tata Technology Excellence Centre.' He said the estimated cost of the project would be Rs 6,935 crore, of which Rs 6,034.20 crore would be borne by TTL, while Rs 1,063.96 crore would be spent by the state government. The state government will spend an additional Rs 858 crore for infrastructure development and establishment of basic facilities. He said that in the first phase, 45 polytechnic institutes would get an upgrade as a pilot project.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store