
New MARA College in Kapit to narrow urban-rural education gap
Speaking at the presentation ceremony of the Letter of Acceptance (SST) for the project at Dewan Suarah Kapit here today, Nanta said the initiative reflects the government's commitment to ensuring that Kapit is not left behind in national development, particularly in terms of access to quality education.
'This SST handover is more than just a symbolic gesture. It demonstrates our firm resolve to bring equitable and high-quality education to rural communities,' he said.
Nanta, who is also the Member of Parliament for Kapit, said the RM79 million project will benefit school leavers in the area by providing more opportunities for higher education and helping to develop a skilled, competitive workforce.
Wangi Marine Services Sdn Bhd has been appointed as the main contractor for the project. Nanta stressed that there will be no compromise on quality, safety, or project timelines.
'I have instructed that no extension of time (EOT) will be approved. Instead, the project should aim to be completed ahead of schedule (AOT),' he said, adding that the responsibility lies with all parties involved to ensure the project's success.
The new campus is expected to accommodate up to 300 students and will offer diploma programmes such as Business Studies, Plantation Management, and Information Technology.
'MARA has also indicated that additional diploma courses may be introduced based on local demand.
'An added advantage is that students will only need to pay a registration fee, with no tuition fees thereafter. This means parents won't have to apply for PTPTN loans. On top of that, students will receive a monthly allowance of RM300 — a much-needed support for rural families in Kapit,' he said.
Nanta added that the project aligns with the Sarawak Corridor of Renewable Energy (SCORE), which aims to create 1.6 million job opportunities by 2030 and supports Sarawak's vision of becoming a high-income state.
'This initiative is in line with the MADANI government's emphasis on inclusivity, sustainability, and the people's well-being,' he said.
He also reminded the contractor to carry out the work with integrity and full adherence to safety standards, with a 'zero accident' target at the construction site.
The campus, located along Jalan Song-Kapit about 15km from town, is scheduled for completion by December 5, 2029.
The event was also attended by representatives from the Ministry of Rural and Regional Development (KKDW), Majlis Amanah Rakyat (MARA), and the Public Works Department (JKR) which is the implementing agency for the project.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


The Sun
7 hours ago
- The Sun
New Kuching airport access road to ease traffic by September
KUCHING: The construction of an eight-kilometer access road connecting Jalan Datuk Mohamad Musa in Kota Samarahan to the southern access road of the airport is expected to be fully completed this September. Works Minister, Datuk Seri Alexander Nanta Linggi, said the road, which is categorised as a federal road, will serve as an alternative route to alleviate the frequent traffic congestion between Kota Samarahan and Kuching. 'The current progress is at 96 percent, with only four percent remaining, which involves the installation of road equipment and lights. I understand the entire project can be completed next month,' he told reporters after an official working visit to the project site today. He also stated that the development agenda for the 13th Malaysia Plan under his ministry in Sarawak will be aligned with the state's Post-Covid-19 Development Strategy 2030 (PCDS 2030). He said infrastructure development like roads, education, health, and industries are among the priorities under this plan, in line with the Sarawak State Government's commitment to drive the green energy and sustainable technology sectors. 'The 13th Malaysia Plan document clearly states that Sarawak and Sabah will become energy industry hubs. Therefore, the implementation of infrastructure projects like this is crucial,' he said. Commenting on his ministry's role, Nanta said the Ministry of Works (KKR), through the Public Works Department (JKR), plays a significant role as the primary implementer of national infrastructure development. 'Besides building roads, JKR also assists other ministries like the Ministry of Education and the Ministry of Health in building and repairing schools, colleges, hospitals, and clinics,' he added. - Bernama


The Sun
9 hours ago
- The Sun
Sarawak infrastructure projects boosted under 13MP, says Works Minister
KUCHING: The recently tabled 13th Malaysia Plan (13MP) places comprehensive emphasis on national infrastructure development, including in Sarawak. Works Minister Datuk Seri Alexander Nanta Linggi said the Works Ministry (KKR) carries a major responsibility in implementing infrastructure development, as without good roads, it would be difficult to deliver other services such as education, healthcare and safety. 'Roads are like the lifeblood of the body. Without them, development is hard to reach rural areas. For example, although school projects fall under the Ministry of Education, their implementation and monitoring are the responsibility of the Public Works Department (JKR). 'This is the kind of inter-agency cooperation that must continue for the benefit of the people,' he told a press conference after the handover ceremony of the completed Sekolah Kebangsaan (SK) Rantau Panjang here today. Nanta, who is also Kapit MP, said the project in the Sungai Batang Rajang area — involving the construction of a main road from Nanga Serau to Nanga Seranau and included under the 13MP — is still in its preliminary stages, and no implementation date has been set yet. 'The road is expected to span around 70 kilometres and benefit thousands of residents, including villages, longhouses, schools and clinics,' he said. As for the Sarawak Trans Borneo Highway project, Nanta said it comprises three phases starting from Tudan to Kuala Baram in the Miri division near the Malaysia-Brunei border checkpoint, ending in the Limbang division without entering Brunei. 'This project is a continuation of the Pan Borneo Highway and will have a major impact, especially on the economic development and connectivity of areas like Limbang, which is a key town in northern Sarawak,' he said. Earlier in his speech, Nanta said JKR would continue monitoring all aspects of post-handover maintenance to ensure the project functions properly and meets the required specifications. 'The successful completion and timely handover of two more projects today proves that the MADANI Government's aspirations are not just rhetoric but are realised through quality projects that are completed on schedule and bring added value to the community,' he said. - Bernama


Borneo Post
11 hours ago
- Borneo Post
13MP a people-centric plan anchored by infrastructure, says Works Minister
Nanta (left) speaks to reporters. – Photo by Agnes Tugong KUCHING (Aug 2): The 13th Malaysia Plan (13MP) has been described as a people-centric and holistic blueprint for national development by Works Minister Dato Sri Alexander Nanta Linggi, who voiced his strong support for its implementation. At a press conference today, Nanta said the plan's broad focus – particularly in uplifting sectors such as education – would only be achievable with robust infrastructure as its foundation. 'As the Works Ministry, our core responsibility lies in enhancing infrastructure. Without proper road access, progress in other sectors like education and health becomes difficult,' he said. He stressed that while education projects fall under the Ministry of Education, the technical execution and physical delivery are handled by the Public Works Department (JKR), which is under the Works Ministry. Nanta was speaking after officiating the handover of two newly completed school projects by JKR to the Ministry of Education at SK Rantau Panjang in Batu Kawa. On infrastructure projects proposed under 13MP and tabled by Prime Minister Datuk Seri Anwar Ibrahim last Thursday, Nanta highlighted the planned 70-kilometre road linking Nanga Serau to Nanga Seranau in Kapit – a project he described as transformative. 'This road will greatly improve accessibility for communities along the northern bank of the Batang Rajang River, benefitting at least 10,000 residents,' he said. He also provided updates on the Sarawak segment of the Trans-Borneo Highway, which consists of three sections – from Kuala Baram to the Sungai Tujoh ICQS, through Brunei's separated territories, and onward to Limbang. 'Although parts of the highway do not pass through the interior, the benefits will still reach rural populations,' he added. He further noted that Limbang, as a key township, is poised to benefit significantly from enhanced connectivity provided by the highway. 13MP alexander nanta linggi infrastructure development people-centric