logo
AA warms of ‘significant implications' of underfunding Rea Vaya bus service

AA warms of ‘significant implications' of underfunding Rea Vaya bus service

The Citizen05-05-2025

The Johannesburg municipality says minibus taxis still account for 91% of monthly trips, leaving Rea Vaya and Metrobus lagging behind.
The Automobile Association of South Africa (AA) is lamenting a potential public transport crisis brewing in Johannesburg.
The entity accused Rea Vaya of mismanagement, which has dented public confidence and impeded low-income commuters.
Despite having millions earmarked for bus services in the coming financial year, the AA believes more needs to be done to provide customers with an attractive public alternative.
'Not just a financial loss'
The AA stated that the Johannesburg municipality had lost more than R300 million from a public transport grant due to operational failures.
'Originally earmarked to support and expand the Rea Vaya network, the lost funding carries significant implications, not only for the city's mobility agenda but for road users, particularly for low-income commuters who rely on affordable and reliable transport options,' stated the AA on Monday.
'This is not just a financial loss, it's a missed opportunity to improve the lives of thousands of Johannesburg residents who depend on public transport to access work, education, and essential services,' stated AA CEO Bobby Ramagwede.
The AA added that the cost of private vehicle ownership was prohibitive and that public transport was a vital avenue for the personal movement of the poor.
'The implications of this funding go beyond mismanagement: they highlight a chronic inability to plan, execute, and maintain public transport systems with integrity, transparency, and accountability,' the AA added.
Budget for Rea Vaya and Metrobus
In the Johannesburg municipality's 2025/26 Integrated Development Plan (IDP), the city states that 10.2 million trips are made monthly via minibus or taxi.
The city states that this accounts for 91% of all public transport trips in Johannesburg, leaving Rea Vaya and Metrobus trailing.
The IDP states that Metrobus serviced 3.3 million passengers via 229 routes in the last financial year, while the Department of Transport aims to have Rea Vaya facilitating 13 million passenger trips annually by the end of the year.
Rea Vaya's proposed budget for the coming year includes R12.5 million for land acquisition, R25 million for station rehabilitation and R150 million for an automated fare collection system.
For Metrobus, at least R90 million has been proposed for the entity for the next financial year, including R32 million for new Metrobuses.
New route to success
The AA's sentiments suggest that the funding would be in vain if Rea Vaya did not develop a clear vision of its future.
'Without decisive action and a turnaround strategy, Johannesburg risks further isolating low-income communities and increasing reliance on private vehicles, which could worsen traffic congestion, road safety risks, and environmental strain,' the AA stated.
The entity called for engagement with civil society and collaboration with national stakeholders to help realise Rea Vaya's potential.
'We cannot afford to waste time or resources. Johannesburg residents need a transport system that works — and leadership that makes it happen,'
NOW READ: R140m Rea Vaya depot stalls as informal settlement blocks progress

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Is the Kia Sorento the ultimate diesel family SUV? A comprehensive review of its R1 million price tag
Is the Kia Sorento the ultimate diesel family SUV? A comprehensive review of its R1 million price tag

IOL News

timean hour ago

  • IOL News

Is the Kia Sorento the ultimate diesel family SUV? A comprehensive review of its R1 million price tag

Kia have refreshed the fourth generation Sorento range. Image: Supplied Up to 79 percent of all vehicles sold in the South African market are in the sub R550 000 bracket, which is one of the reasons Kia South Africa introduced the Kia Sonet LS at a smidgen under R300 000 and has seen them slowly inching their way back up the sales charts. However, they're still very much aware that the market hasn't completely forgotten about the premium segment, especially family SUVs, which have seen them refresh the fourth-generation Sorento range. Diesel continues The upgrades are refreshing, but most importantly, they have stuck to their diesel engine, taking advantage of our oil-burner preference when it comes to large SUVs and the fact that diesel options are becoming more scarce as the world focuses on New Energy Vehicles (NEVs). It's their four-cylinder 2.2-litre producing 148kW and 440Nm paired to a new eight-speed wet double-clutch transmission driving the front wheels of the entry-level EX+ and all four corners of the SX and SXL models. Interestingly, the exterior remains the same throughout the model walk, with the differences focused on various interior upgrades. Exterior It gets a new, higher volume bonnet with a more defined silhouette, new front and rear vertical LED headlights, new grille with a 3D mesh design and a redesigned front lower bumper with a wide skid plate. Around the back, there's a high-mounted LED brake light, updated bumper and exhaust trim as well as a wide skid plate, black cladding and 20-inch rims emphasising a more rugged SUV look for the Sorento. Video Player is loading. Play Video Play Unmute Current Time 0:00 / Duration -:- Loaded : 0% Stream Type LIVE Seek to live, currently behind live LIVE Remaining Time - 0:00 This is a modal window. Beginning of dialog window. Escape will cancel and close the window. Text Color White Black Red Green Blue Yellow Magenta Cyan Transparency Opaque Semi-Transparent Background Color Black White Red Green Blue Yellow Magenta Cyan Transparency Opaque Semi-Transparent Transparent Window Color Black White Red Green Blue Yellow Magenta Cyan Transparency Transparent Semi-Transparent Opaque Font Size 50% 75% 100% 125% 150% 175% 200% 300% 400% Text Edge Style None Raised Depressed Uniform Dropshadow Font Family Proportional Sans-Serif Monospace Sans-Serif Proportional Serif Monospace Serif Casual Script Small Caps Reset restore all settings to the default values Done Close Modal Dialog End of dialog window. Advertisement Next Stay Close ✕ The refreshed Kia Sorento gets a panoramic sunroof, black headliner, metal pedals and ambient lighting along the dash, redesigned gear knob and front door trims. Image: Supplied Interior It's fantastically roomy inside; more van than SUV, which adds to the appeal of the seven-seater. The refreshed Sorento also signals the first time that Kia has broken through the R1million barrier, which people might baulk at, but shop around, and that's in the ballpark when it comes to legacy brands like Kia, which have been around locally for almost three decades. It's certainly reflected in the interior with plush soft-touch surfaces made from leather and recycled materials. There's a panoramic sunroof, black headliner, metal pedals and ambient lighting along the dash, redesigned gear knob and front door trims. It's an impressive cockpit with a 12.3-inch infotainment touchscreen, a 12.3-inch digital instrument cluster and a 10-inch head-up display. It gets a wireless phone charger, six USB-C charging ports (two per row) and a digital rear-view mirror. Thankfully, Kia has opted for all the important and regular adjustments to be operated by dials and not hidden in a sub-menu somewhere on the screen. the Kia Sorento gets a four-cylinder 2.2-litre diesel engine producing 148kW and 440Nm. Image: Supplied Driving The driver's position is commanding and comfortable, with the seats providing ample support. What also impressed was the attention to the noise, vibration and harshness (NVH) levels, especially for a big SUV with virtually nothing signalling a diesel mill while wind noise is outstanding even into the teeth of a cold Cape Town Northwester. There's more than enough grunt, and it made short work of Sir Lowry's Pass, and giving it a bit of stick, it easily gets past slower traffic because Cape Town drivers are generally pedestrian, but add rain, and it gets even worse. We drove the mid-specced SX, and going up the pass, we used the Advanced Driver Assistance Systems (ADAS). It kept us between the lines without any fuss, and the adaptive cruise control would slow down for cars ahead of us. There was no sudden jerking of the steering wheel or emergency-type braking. It's not a scythe through corners and was never intended to be, but it has a refined suspension that combines well with the chassis. There was some pitch and wallow as you would expect, but not really any noticeable body roll, providing a comfortable and unhurried experience. When we returned the cars to the airport, our consumption stood at a very respectable 6.8l/100km. Safety The safety front is taken care of with seven airbags, Electronic Stability Control (ESC) with Trailer Stability Assist (TSA), front and rear park distance control, Rear view camera, Reverse camera with dynamic parking lines and as the Sorento's level increases, so does the additional systems and technology. For a full walk of Sorento's different specification levels, I'd suggest looking at their website. The Kia Sorento is out and out a family car, and it does that with sophisticated aplomb and considering what you get, including its diesel USP, the price is competitive in this segment. It comes with an unlimited kilometre/five-year warranty (inclusive of roadside assistance), as well as a six-year/90,000km maintenance plan. Pricing July 2025 Sorento 2.2 CRDi 7-Seater EX+ 2WD 8DCT: R999 995. Sorento 2.2 CRDi 7-Seater SX AWD 8DCT: R1 199 995. Sorento 2.2 CRDi 7-Seater SXL AWD 8DCT: R1 299 995.

DA calls for Tshwane Deputy Mayor Modise to explain R12. 5 million unpaid rent
DA calls for Tshwane Deputy Mayor Modise to explain R12. 5 million unpaid rent

IOL News

timea day ago

  • IOL News

DA calls for Tshwane Deputy Mayor Modise to explain R12. 5 million unpaid rent

City of Tshwane Deputy Mayor Eugene Modise is facing criticism over allegations that his company owes the North West Housing Corporation R12.5 million in unpaid rent for the Morula Sun property. Image: Supplied/ City of Tshwane The DA in the North West wants City of Tshwane Deputy Mayor Eugene Modise to appear before a provincial legislature portfolio committee to explain a lease agreement linked to his alleged R12.5 million debt in unpaid rent for the Morula Sun property, managed by the North West Housing Corporation (NWHC). The party has asked the portfolio committee on Cooperative Governance, Human Settlements and Traditional Affairs to summon both Modise and the NWHC 'to come and account for this convenient arrangement between an ANC politician and a failing provincial entity, currently governed by a board staffed by a cohort of ANC politicians'. Modise, who is also the ANC chairperson in the Tshwane region, has reportedly denied owing NWHC, saying he won't let political gimmicks damage the relationship between his party and NWHC. He claimed his administration has transformed the entity, curbed criminal activities, and put a stop to vandalism. He highlighted that since the lease agreement his company has expensive crucial renovations and makeovers of the property. He said his company entered into the agreement before he became a councillor and deputy mayor. He declined to disclose further details, citing that the matter is being handled by the board of lawyers, saying it would be "disingenuous and inconsiderate" to comment further. CJ Steyl, DA MPL in the North West Provincial Legislature and spokesperson on Cooperative Governance, Human Settlements and Traditional Affairs, revealed that the outstanding debt owed by Modise to NWHC was exposed through a parliamentary written question posed by DA MPL Johni Steenkamp. The response to Steenkamp's question revealed that Modise's company, Mzanzi Resorts, owes the financially strained NWHC over R12.5 million in rental fees for the Morula Sun property. It was revealed that Modise entered into a lease agreement with NWHC in December 2019 for the Morula Sun property, with a monthly rental fee of R150,000. The contract was for three years but was extended to April 2026, despite millions owed in arrears. According to Steyl, the last payments were received in September 2024. 'It is notable that Tshwane Deputy Mayor Modise indicated on the addendum for the extension of the contract, dismissed the arrears amounts in lieu of repairs he brought, despite the contract stating in the lessee's obligations that Mzanzi resorts would be responsible for the maintenance,' he said. The DA has also referred the matter to Jacqui Uys, the party's Tshwane spokesperson on Finance, to initiate an investigation into Modise within the Metro council. 'The DA will not rest until every cent owed by Tshwane Deputy Mayor Modise is paid in full and that the NWHC accounts for the actions that led to this agreement between the compromised entity and an ANC politician,' Steyl said.

Tshwane Mayor vows to enforce High Court ruling on Edwin Sodi-linked tender
Tshwane Mayor vows to enforce High Court ruling on Edwin Sodi-linked tender

IOL News

timea day ago

  • IOL News

Tshwane Mayor vows to enforce High Court ruling on Edwin Sodi-linked tender

Tshwane Mayor Nasiphi Moya has assured residents that her administration will take decisive action to implement the High Court ruling, requiring companies linked to businessman Edwin Sodi to repay the profits from a 2019 tender valued at almost R300 million for the Rooiwal Waste Water Treatment Plant upgrade. Image: Oupa Mokoena / Independent Newspapers Tshwane Executive Mayor Nasiphi Moya has assured residents that her administration will take decisive action to enforce a Gauteng High Court ruling requiring companies linked to businessman Edwin Sodi to repay profits from a nearly R300 million 2019 tender for the Rooiwal Waste Water Treatment Plant upgrade. The contract awarded to the consortium, comprising Blackhead Consulting, NJR Projects, and CMS Water Engineering, linked to Edwin Sodi, was terminated in August 2022 due to significant issues and delays with the quality of work, resulting from persistent stalling of Phase 1 of the project. The Rooiwal upgrade project aimed to enhance the wastewater treatment plant's capacity to process the high volume of wastewater it receives. For over a decade, the issue of contaminated water supplied to Hammanskraal residents has been linked to the Rooiwal plant's insufficient capacity to properly purify wastewater, resulting in sludge being discharged into the Apies River. Video Player is loading. Play Video Play Unmute Current Time 0:00 / Duration -:- Loaded : 0% Stream Type LIVE Seek to live, currently behind live LIVE Remaining Time - 0:00 This is a modal window. Beginning of dialog window. Escape will cancel and close the window. Text Color White Black Red Green Blue Yellow Magenta Cyan Transparency Opaque Semi-Transparent Background Color Black White Red Green Blue Yellow Magenta Cyan Transparency Opaque Semi-Transparent Transparent Window Color Black White Red Green Blue Yellow Magenta Cyan Transparency Transparent Semi-Transparent Opaque Font Size 50% 75% 100% 125% 150% 175% 200% 300% 400% Text Edge Style None Raised Depressed Uniform Dropshadow Font Family Proportional Sans-Serif Monospace Sans-Serif Proportional Serif Monospace Serif Casual Script Small Caps Reset restore all settings to the default values Done Close Modal Dialog End of dialog window. Advertisement Next Stay Close ✕ Ad loading The Apies River in turn supplied water to Temba water treatment plant, used for purifying water for the Hammanskraal residents. The high court ordered the companies to repay the City profits made from the contract. According to the court ruling, the High Court will determine the exact amount of profit to be repaid to the City after the consortium submits its expenses within 60 days. Moya said if the companies fail to submit their expenses as ordered by the court, the City will appoint an independent contractor to determine the expenses and calculate the profits made from the tender. 'The court's decision affirms what we have long maintained that contracts awarded through unethical and irregular processes undermine service delivery, compromise governance, and erode public trust. We assure the residents of Tshwane that this administration will act decisively to give full force and effect to the order,' she said. Moya said work to complete the upgrades to the Rooiwal Waste Water Treatment Plant have progressed successfully with Phase 1B underway after work on Phase 1A was completed ahead of schedule. Last week, Tshwane's Section 79 Utility Services committee expressed satisfaction with the Department of Utility Services' progress in refurbishing the treatment plant, saying the project is currently in Phase 1B, which commenced in April 2025, focusing on civil works. DA caucus leader Cilliers Brink welcomed the court ruling, saying it validates the DA-led coalition's decision to initiate litigation and attempt to blacklist the Sodi consortium. He said the consortium lacked the necessary expertise for the project and abandoned the site prior to the investigation. He called on the City to make public the progress in completing the blacklisting process. City Manager Johann Mettler previously announced that the metro had started the process of blacklisting the implicated companies from conducting business with the government by applying to the National Treasury. Brink said:'The tender for the upgrade of the Rooiwal Waste Water Treatment Plant was awarded to the Sodi consortium in 2020. In 2022 a forensic investigation found that the consortium should have been disqualified from the even bidding.'

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store