
Energy wastage: Leghari seeks support from CMs, Ahsan
ISLAMABAD: Minister for Power Sardar Awais Leghari has sought support from the provincial chief ministers and the Federal Minister for Planning, Development and Special Initiatives, Ahsan Iqbal, for the implementation of building codes aimed at curbing energy wastage.
In letters addressed to the minister for planning and provincial chief ministers, Leghari referred to his earlier communication dated January 1, 2025, regarding the 'Implementation of Energy Building Code–2023.'
He emphasised that the building sector is a major contributor to the national energy crisis, accounting for over 60 per cent of total energy consumption. 'This demand peaks in the summer months due to high cooling loads resulting from conventional building designs that largely ignore energy efficiency during planning, construction, and operational phases.'
Minister launches 'Energy Conservation Building Code 2023'
Highlighting the urgency of the matter, Leghari recalled that the prime minister, during a strategic roadmap meeting on energy conservation held on February 1, 2023, had directed the National Energy Efficiency and Conservation Authority (NEECA) to revise the Building Code of Pakistan (Energy Provisions 2011).
Accordingly, development authorities were instructed to amend their building by-laws to include energy efficiency measures. The revised Energy Conservation Building Code (ECBC-2023) was approved by the Federal Cabinet on August 9, 2023, and the National Economic Council (NEC) also directed all provinces to ensure its implementation.
'It is essential to recognize that both the public and private sectors play a pivotal role in shaping the energy landscape of the building sector,' the minister stated. 'Public sector investments under the Public Sector Development Programme (PSDP), and private developments regulated by municipalities and local governments, present a vital opportunity to promote energy efficiency.'
Leghari has reiterated his proposal to integrate ECBC-2023 into PSDP projects by incorporating an energy efficiency analysis section into the Planning Commission's manuals (PC-1 to PC-5). He suggested that the approval of PSDP projects—particularly infrastructure schemes—should be contingent upon achieving at least 50 per cent energy savings compared to conventional designs.
Copyright Business Recorder, 2025
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Business Recorder
a day ago
- Business Recorder
Letters sent to ministers: APTMA for revising grid connection charges, suspending FO levies
ISLAMABAD: All Pakistan Textile Mills Association (Aptma) has sought rationalization of grid connection charges, reduction in grid connection time and suspension of petroleum and carbon levies on Furnace Oil (FO). In letters to Power Minister Sardar Awais Leghari, Petroleum Minister Ali Pervaiz Malik and Director General Textile (Commerce Ministry), Chairman APTMA, Kamran Arshad stated that the government has adopted policies to transition industrial captive generation loads to grid electricity. However, the punitive levies imposed have rendered industrial operations financially unviable without offering a viable transition pathway to grid-based power. Ready to help build robust framework: APTMA questions Nepra's tariff-setting capacity Aptma maintains that the imposition of a Rs. 791/Mmbtu levy on gas used for captive power generation has made it entirely cost-prohibitive. While intended to encourage migration to the electricity grid, the reality on ground is that many industrial units still lack grid connections and, in response, have been compelled to switch to furnace oil (FO)-based captive generation. The Association stated that the imposition of a petroleum levy of Rs. 82,000/ton on FO-on top of the base price of approximately Rs. 130,000/ton—has now left these industries with no economically viable power source. Aptma has cited the example of Soorty Enterprises, a major textile and apparel manufacturer with $400 million in annual exports, employing 35,000 people across different divisions. Soorty has two mills, one in Landhi under KE and another on the Super Highway under HESCO, with a total power requirement of 35MW. Following the grid transition levy on gas, both shifted from gas to FO-fired captive generation that costs around Rs. 33/kWh, compared to around Rs. 29-30/kWh on the grid and will shoot up to Rs. 51/kWh following the levies on FO. The company prefers to run its operations on the electricity grid under KE and HESCO, as it is cheaper than FO-fired captive generation even before the levy. However, KE and HESCO have quoted a cost of Rs 8 billion each to provide grid connections to these units, totalling Rs 16 billion to be paid up front. Additionally, they have been told that it would take about 3 years to connect them to the grid, with no guarantee of timely completion or energisation. On top of this, the company would be responsible for getting approvals from several government departments (like FWO, railways, local authorities, etc.), which adds further costs and difficulties. This situation is wholly untenable. The company cannot rely on gas or FO-fired generation for 3 years with the punitive levies as it will go out of business. However, paying Rs. 16 billion upfront for a grid connection with no guarantee of timely access will also push the company towards bankruptcy. It is at a dead end, with no viable options. 'While we have highlighted the example of only one company, and that too one of the biggest exporters of Pakistan, the same issues are being faced by several of our members, particularly in urban hubs like Lahore and Karachi where issues related to right of way and land availability are prevalent,' Aptma Chief said adding that no company can afford to pay billions of rupees for a grid connection, especially without any guarantee of timely completion. On the one hand, the industry is being penalized for using alternate fuels such as gas and FO and on the other hand, it is effectively barred from accessing the grid due to prohibitively high connection charges, excessive lead times, and bureaucratic delays. It is neither reasonable nor practical for the Government to mandate grid transition while the distribution companies impose insurmountable barriers to achieving it. Considering the foregoing, Aptma recommended the following: (i) Grid connection charges for export-oriented industrial units be rationalized and brought within a financially viable range;(ii) Grid connections be completed and fully energized within a maximum period of six months from fulfillment of demand notes; and (iii) all levies on industrial captive generation -including petroleum and carbon levies on FO-be suspended until all industrial units relying on gas/FO as primary sources of energy are provided affordable and operational grid connections. Copyright Business Recorder, 2025


Express Tribune
2 days ago
- Express Tribune
SCO cooperation in energy sought
The minister invited international partners to invest in the nationwide rollout of Advanced Metering Infrastructure (AMI), estimating a $3 billion need to serve over 30 million consumers. PHOTO: File Listen to article Federal Minister for Energy (Power Division) Sardar Awais Ahmed Khan Leghari on Thursday virtually addressed the Shanghai Cooperation Organisation (SCO) Energy Ministers Conference, where he outlined Pakistan's vision for a clean, secure, and collaborative energy future. Speaking under the theme "Integrate Innovation for Energy Future," Leghari stressed the urgent need for regional cooperation, technological advancement, and policy reforms to confront global energy challenges. According to an official statement from the Ministry of Energy (Power Division), the minister highlighted Pakistan's ongoing energy sector transformation, underscoring the shift from short-term fixes to long-term structural reforms in the energy sector. He pointed to the establishment of several new institutions — such as the Power Planning & Monitoring Company (PPMC), Energy Infrastructure Development and Management Company (EIDMC), National Grid Company (NGC), and Independent System and Market Operator (ISMO) — as a foundation for improved governance, modernisation of the grid, and promoting transparent market operations. Leghari reaffirmed Pakistan's clean energy targets, reiterating the government's commitment to reaching 60% renewable energy and 30% electric vehicle penetration by 2030. He outlined initiatives such as the deployment of smart meters, enhancement of operational efficiency through data-driven systems, and the launch of a dedicated Research & Development (R&D) Secretariat to encourage local innovation and technology transfer. Underscoring Pakistan's geographical position as a regional energy bridge between Central Asia, South Asia, and the Gulf, Leghari called for greater cross-border electricity trade, investment in shared infrastructure, and the creation of joint security frameworks for energy systems. He stressed the importance of completing the CASA-1000 project and urged Afghanistan to fully participate as both a transit and offtake country to support regional energy integration and stability. To strengthen collaboration under the SCO framework, Leghari proposed five initiatives: the creation of an SCO Secretariat for Energy Innovation and R&D Collaboration, an Energy Innovation Fellowship Programme for young researchers, joint demonstration sites in Pakistan for renewable and smart grid technologies, a web-based Energy Cooperation Dashboard for project tracking, and a Project Prioritisation Committee to focus on high-impact initiatives. Looking ahead, the minister announced Pakistan's upcoming energy infrastructure investment plan, which will offer international partners bankable opportunities, supported by promising a transparent and investor-friendly environment. He invited international partners to invest in the nationwide rollout of Advanced Metering Infrastructure (AMI), estimating a $3 billion need to serve over 30 million consumers. "Pakistan is not only seeking investment," Leghari said, "we are offering long-term partnerships built on trust, innovation, and mutual benefit. We are ready to work with all SCO member states to turn our shared energy goals into practical solutions that benefit our people and our region."


Business Recorder
3 days ago
- Business Recorder
National Assembly passes Rs17.57trn federal budget for FY2025-26
The National Assembly (NA) passed on Thursday the federal budget for the next fiscal year (2025-26), with a total outlay of Rs17.573 trillion, focusing on sustainable and inclusive economic growth, state-run Radio Pakistan reported. A motion to this effect was moved by Minister for Finance Muhammad Aurangzeb. The House passed the Finance Bill, 2025 with certain amendments, giving effect to the financial proposals of the federal government for the year beginning on the July 1, 2025. Key highlights of Pakistan budget for 2025-26 The budget projects an economic growth rate of 4.2% and an inflation rate of 7.5% for the next financial year. The net revenue receipts is estimated at Rs11.072 trillion. The Federal Board of Revenue (FBR) collections are estimated to be Rs14.131 trillion, 18.7% higher than the outgoing fiscal year (2024-25). Non-tax revenues will be Rs5.147 trillion. As per the details, Rs2.550 trillion have been earmarked for defense, Rs1.055 trillion for the pension expenditures and Rs1.186 trillion for subsidy on electricity and other sectors. The main relief features include 10% increase in salaries, 7% in pensions and tax relief for the salaried class across all slabs. Moreover, Rs716 billion have been allocated for Benazir Income Support Programme. The government has allocated Rs1 trillion for the Public Sector Development Programme (PSDP). The biggest amount of Rs328 billion has been earmarked for transport infrastructure projects. The PSDP portfolio for next fiscal year has been aligned with the objectives of URAAN Pakistan, while priority has been attached to high impact, near completion, foreign funded projects and new initiatives of national importance, according to Radio Pakistan. It reported that Rs32.7 billion have been earmarked for Diamer Bhasha, Rs35.7 billion for Mohmand Dam, Rs3.2 billion for K-IV, Rs10 billion for lining of Kalri Baghar Feeder and Rs4.4 billion for installation of telemetry system on Indus Basin System. The Higher Education Commission will be given Rs39.5 billion for one hundred and seventy projects, and Rs18.5 billion have been set aside in the PSDP for various education projects. Around Rs4 billion have been allocated for ten ongoing and five new schemes in the agriculture sector. The budget encapsulates incentives for the construction industry, which include reduction in withholding tax on purchase of property, Radio Pakistan reported. The House will now meet tomorrow at eleven in the morning.