logo
Kelana Jaya line LRT up and running at 11.10am after disruption

Kelana Jaya line LRT up and running at 11.10am after disruption

THE Kelana Jaya Line Light Rail Transit (LRT) service, which experienced delays due to a track switch disruption between the Pasar Seni and Bangsar stations, resumed full operations at 11.10 am today after initial repair works were completed.
Rapid Rail Sdn Bhd, in a statement, said its engineering team completed the preliminary repair works at 10.56 am and conducted tests on the track system and components to ensure the line could operate per safety standards.
'Nevertheless, the engineering and operations teams will continue to monitor train movements throughout the operating hours to ensure the Kelana Jaya Line runs smoothly.
'Full repair works will be carried out after operating hours to reduce disruption to passengers. A thorough investigation is also underway to identify the root cause of the issue to prevent a recurrence,' the statement said.
Rapid Rail also thanked the passengers for their patience throughout the disruption.
This morning, Rapid Rail announced that the Kelana Jaya LRT Line experienced schedule delays following a track switch disruption between Pasar Seni and Bangsar stations.
The issue was detected around 5.30 am, resulting in trains heading from Pasar Seni to Bangsar towards Putra Heights having to be operated manually. — BERNAMA
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Traffic gridlock, street vendor takeover blighting Bangsar South
Traffic gridlock, street vendor takeover blighting Bangsar South

The Star

time22-07-2025

  • The Star

Traffic gridlock, street vendor takeover blighting Bangsar South

WHEN I first moved into this neighbourhood, it felt like a pocket of bliss tucked quietly away from the chaos of city life. Surrounded by lush greenery, it was a gem – peaceful, charming and untouched by the hurried pace of the outside world. Today, that serenity has given way to a daily struggle against a maze of traffic and congestion. The skyline has transformed dramatically, and the infrastructure now mirrors that of a bustling city – sleek and modern. But at street level, the experience tells a different story. Beneath the gleaming facades and towering buildings, the reality is far less bearable. The general disregard of developers towards traffic flow and connectivity is often well-documented. It's perplexing how approvals continue to be issued for new developments while existing traffic issues remain unaddressed. Bangsar South was once hailed as a transit-oriented development (TOD), built on the assumption that residents and commuters would shift towards public transport. However, Malaysians still rely heavily on cars for convenience and connectivity. The proliferation of office towers and condominiums has created traffic bottlenecks at key entry and exit points and this has overwhelmed the existing road infrastructure. The KL Gateway road network is a prime example of a poorly conceived design that resulted in traffic gridlock and confusion. Motorcyclists weave through traffic at high speeds, delivery riders zigzag recklessly and frustrated drivers abandon all lane discipline in desperate attempts to escape the congestion. Bangsar South was once touted as a model township – celebrated for its seamless connectivity and proximity to the light rail transit (LRT). Yet on the ground, that vision is undermined by a growing problem. Walkways meant for pedestrians are now increasingly hijacked by unlicensed vendors. What was intended as pedestrian-friendly infrastructure has been appropriated by stall operators, some with temporary permits, many without any at all. These vendors encroach on walkways, turning public space into commercial turf. As a result, pedestrians are forced off the pavement and onto the road, navigating between moving traffic and parked vehicles. It's mentally exhausting to wade through the aggressive and selfish driving culture that has taken root on the streets. But what truly exacerbates this daily stress is the lacklustre enforcement that overlook a multitude of traffic offences. Instead of enjoying a smooth drive back to our homes, we brace ourselves for survival. Defensive driving has become second nature – constantly checking the side and rear-view mirrors, scanning blind spots, steering clear of delivery riders who dart dangerously close, and keeping our distance from aggressive tailgaters. The inconsistency of enforcement leaves us navigating a system where rule-breaking becomes a calculated risk, not a deterrent. When the authorities are invisible, the system becomes optional. Occasional operations by enforcement teams do little to solve long-term issues because they are reactive, not reformative. It's a cat-and-mouse game. The reality is stark: unless residents file formal complaints, the system rides on inertia and the status quo remains. Urban planning is more than glossy brochures and transit maps – it must be backed by responsible governance and continuous enforcement. What we need isn't more flashy infrastructure. We need consistent deterrents. Strategic urban design can offer relief. Instal fences at key waiting zones like schools, bus stops or shop rows to prevent illegal roadside parking that clogs narrow lanes. Use bollards to enforce lane discipline. The installation of bollards at key locations could prevent last-minute lane changes and enforce better traffic flow. Without structural deterrents and serious enforcement, chaos will continue to reign on the roads. Empower enforcement officers to revoke repeat offenders' licences without delay. The law must be applied not just swiftly but visibly, with zero tolerance for repeat violators. Public compassion for street vendors is understandable, even admirable. Communities thrive on empathy. But when this goodwill is manipulated and exploited, it breeds disorder. Walkways should not be appropriated; roads should not be taken over by lawlessness. We deserve better planning, consistent enforcement and above all, respect for the people who choose to follow the rules. Quality of life should be central to town planning, not an afterthought. A little dignity shown to us, the residents, is not too much to ask. J. GOMEZ Bangsar South

On-demand transit service set to grow in Penang
On-demand transit service set to grow in Penang

The Star

time20-07-2025

  • The Star

On-demand transit service set to grow in Penang

Passengers boarding the on-demand van in Bayan Baru. — Photos: ZHAFARAN NASIB/The Star SEVEN vans have been deployed for Rapid Bus' Rapid On-Demand (ROD) service in Bayan Baru and Bayan Lepas, Penang. Rapid Bus acting chief executive officer Ku Jamil Zakaria said the ROD service was launched in Bayan Lepas on April 27, follow­ed by Bayan Baru on May 31, bring­ing the total number of service zones in Penang to 13. 'We've deployed four vans in Bayan Lepas and three in Bayan Baru and plan to add more vehicles to these zones moving forward,' he said during a promotional ride in Bayan Baru. Ku Jamil said initial response to the ROD initiative in Penang had been encouraging, showing potential for further development. Sim (front) and Ku Jamil in a Rapid On-Demand van at Bayan Baru. He added that 200 passengers on average daily had used the ROD service in Bayan Baru and Bayan Lepas since its launch. He saw great potential in the Bayan Lepas and Bayan Baru areas, especially with the emergence of new developments such as Mutiara Light Rail Tran­sit (LRT) and the expansion of Penang Inter­national Airport. 'We believe the ROD service will likely lead to an increase in the number of passengers using Rapid Penang. 'Given the growth potential, we plan to deploy additional vans in both areas to meet future demand. 'We hope the stakeholders involved in the ongoing developments can help promote this service to the public, so more passengers will be encouraged to try out the ROD service,' he said. The ROD service, first introduced in Farlim in Aug 1 last year, he said, was currently operating with a fleet of 50 vans. Between January and June this year, the service recorded an average daily ridership of 2,520 passengers. Bayan Baru MP Sim Tze Tzin welcomed the initiative, descri­bing it as timely and well-suited for the area's growing needs. He said the ROD service could encourage more people to make it their primary mode of transport. 'This service offers flexibility and accessibility, especially in areas not fully covered by regular bus routes. 'It can help reduce reliance on private vehicles and ease traffic congestion in the long run.' Sim said Penang would soon see two major infrastructure projects – the airport expansion and construction of Mutiara LRT – both of which were expected to significantly disrupt traffic flow. He said the introduction of the ROD service was a proactive move to address these challenges. 'I believe this service is coming in at the right time to offer practical solutions. 'And I strongly urge drivers, workers and residents in the area to be part of the solution, by using and supporting this service,' he added.

No train service across Singapore's entire Bukit Panjang LRT line due to power fault
No train service across Singapore's entire Bukit Panjang LRT line due to power fault

The Star

time03-07-2025

  • The Star

No train service across Singapore's entire Bukit Panjang LRT line due to power fault

SMRT said free regular or bridging buses are available outside the stations. ST FILE SINGAPORE: Train service across the entire Bukit Panjang LRT (BPLRT) line came to a halt on Thursday (July 3) morning due to a power fault. In a Facebook update at 9.13am, transport operator SMRT notified commuters about the fault spanning all 13 stations that happened at around 8.50am. It said that free regular or bridging buses are available outside the stations. In an update about five minutes later, SMRT said that its staff are on site working to resolve the issue and are assisting affected commuters. 'Train services are currently unavailable across the entire BPLRT system. In-train and station announcements have been made to keep commuters informed,' SMRT said. 'We apologise for the disruption to your journey and appreciate your patience', it added. This is the second train disruption to occur this week, after a signalling fault at Orchard station on the Thomson-East Coast Line on July 1 led to delays between Napier and Great World stations. Train service resumed after two hours. The 8km long BPLRT network has had a long history of reliability issues, with the most recent disruption taking place on Oct 22, 2024, during the evening rush hour. Train services stalled between the Bukit Panjang and Choa Chu Kang LRT stations and only resumed the next morning. Initial findings showed that the breakdown was in one of the wheel assemblies on a faulty train. Following this, the Land Transport Authority and SMRT said that it would end train services an hour earlier from Thursdays to Sundays between Nov 14, 2024, and Oct 31, 2025 to facilitate renewal works. These include the upgrading of the BPLRT's signalling system, and the testing of new and retrofitted light-rail vehicles. Works to upgrade the existing signalling system on the BPLRT to a new communications-based train control system that better controls train speeds – similar to that used on MRT lines – have been carried out progressively since 2022. LTA said it is targeting to complete the full renewal programme by the end of 2026. This was delayed by two years from 2024 due to a manpower shortage and supply chain disruptions arising from the Covid-19 pandemic. In 2024, the average daily ridership on the LRT network, which includes the Sengkang-Punggol LRT, stood at 210,000. This was an increase of 4 per cent over the 2023 figure. - The Straits Times/ANN

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store