logo
After deadly bus crash, Perak MB urges federal support for East-West Highway and Gerik Hospital upgrades in 13MP

After deadly bus crash, Perak MB urges federal support for East-West Highway and Gerik Hospital upgrades in 13MP

Malay Mail21-06-2025
IPOH, June 21 — Perak Menteri Besar Datuk Seri Saarani Mohamad has expressed hope that the proposal to upgrade the East-West Highway (JRTB) linking Gerik and Jeli will be included in the 13th Malaysia Plan (13MP).
Saarani said the state government had conveyed its intention to Prime Minister Datuk Seri Anwar Ibrahim during his visit to Lumut last week.
'What's most important is to reassess the alignment and widening of the JRTB. The upgrade involves more than just resurfacing; it requires a full reconstruction, as the existing structure is so old that some of the damage has exposed the road base.
'This highway has been in use for over 40 years, and simply patching up damaged sections may no longer be sufficient. However, the state government fully understands that constructing a new alignment or rebuilding the JRTB would require substantial funding,' he said at a press conference after officiating the closing ceremony of the 2025 National Training Week at the Ipoh Convention Centre here today.
Saarani said the state government has also instructed the State Infrastructure, Energy, Water and Public Transport chairman, Datuk Seri Mohammad Nizar Jamaluddin, and Human Resources, Health, Indian Community Affairs and National Integration chairman A. Sivanesan, to prepare a report and study on upgrading the JRTB and Gerik Hospital.
'Mohammad Nizar will obtain information and data from the Works Ministry regarding the upgrade of the JRTB, while Sivanesan is working on applying to the Health Ministry for the upgrading of Gerik Hospital, as there is an urgent need in the event of accidents. Typically, victims are taken to Hospital Taiping or the Raja Permaisuri Bainun Hospital.
'If upgraded, it would be sufficient for patients or victims to be treated at Gerik Hospital, provided it is equipped with the necessary facilities and expertise. Once the study is completed, we will submit a letter to the relevant ministry,' he added.
In the early hours of June 9, a tragic accident along the JRTB near Tasik Banding, Gerik, claimed the lives of 15 Universiti Perguruan Sultan Idris (UPSI) students when the chartered bus transporting them from Jertih, Terengganu, to the main campus in Tanjong Malim, Perak, was involved in a crash.
The crash also left 33 others injured, including the bus driver and his assistant, as well as the driver and three passengers of a multi-purpose vehicle. — Bernama
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Hospital gave tender to company that failed to deliver cancer treatment machines on time, delaying patients' treatments by months
Hospital gave tender to company that failed to deliver cancer treatment machines on time, delaying patients' treatments by months

Malay Mail

time4 hours ago

  • Malay Mail

Hospital gave tender to company that failed to deliver cancer treatment machines on time, delaying patients' treatments by months

KUALA LUMPUR, July 21 — A delay in the delivery of critical cancer treatment equipment by a firm has affected patient health care at the Hospital Canselor Tuanku Muhriz (HCTM), revealed the Auditor-General's Report. In an audit report released today, the National Audit Department found that the firm, identified as 0074062-D, failed to provide a linear accelerator (Linac) radiotherapy system as well as a CT-Simulator and Contrast Injector to HCTM on time. The Linac and other supporting equipment were initially scheduled for delivery on September 18, 2024. However, by the time the audit report was concluded on January 17 this year, the Linac machine was yet to be delivered to the said hospital. The report stated that the delay has jeopardised health treatment for at least 20 patients, which was reportedly postponed for up to eight weeks. According to the audit report, the firm failed to supply the equipment on time because the new Linac unit did not meet the technical integration requirements with HCTM's existing system, known as ARIA. 'This technical incompatibility meant that no testing and commissioning work could proceed, further stalling installation and operation,' the report stated. The company then in June last year, asked to postpone the completion of its tender to Feb 12, 2025 due the technical incompatibility, which was approved by HCTM. However, the firm asked for another deferment in December to an unspecified date, which HCTM rejected. Despite the issue, 0074062-D was awarded the contract by the hospital's tender procurement committee. During the tender process, although company 0074062-D met the technical and financial evaluation thresholds, it was not recommended for appointment by the pre-tender committee, technical assessment committee and financial assessment committee. The report stated that the technical assessment committee specifically highlighted that the equipment proposed by the company did not comply with integration requirements for the hospital's existing ARIA system. Despite these concerns, the tender procurement committee proceeded to award the contract to company 0074062-D, overriding the collective recommendations of the evaluation committees. HCTM stated that the tender procurement committee selected company 0074062-D because it fulfilled 90.36 per cent of the technical assessment criteria, submitted the second-lowest bid at RM22 million, and offered the lowest maintenance cost at RM960,000 per year. This was compared to RM1.09 million per year quoted by the lowest bidder in the tender process. However, the National Audit Department found that the explanation unsatisfactory as the report showed the cost saving decision was made despite one company - 0050470-K - submitting a bid for just RM370,000 more than the winning bid, but with the highest score in the technical assessment at 98.05 percent. Apart from the cancer treatment equipment procurement, the Audit Department also raised concerns over two other tenders approved by HCTM — one for catering services and another for lift upgrades. In the catering tender, a RM25.6 million contract was awarded to a company that lacked experience and failed to meet key technical requirements, including having halal certification. Despite not being recommended by the financial assessment committee, the company was chosen due to having sufficient capital. Notably, none of the bidders fully met both technical and financial criteria. Meanwhile, a RM10.8 million contract for lift upgrades was given to company 0726241-U, which had a 'sick project' record — a clear breach of tendering guidelines for major works. Although the hospital claimed that further reviews showed some of the firm's questionable projects were completed on time, the Audit Department maintained that the company should have been disqualified from the start.

Give clarity on Rakan KKM initiative, health ministry told
Give clarity on Rakan KKM initiative, health ministry told

Free Malaysia Today

time5 hours ago

  • Free Malaysia Today

Give clarity on Rakan KKM initiative, health ministry told

Rakan KKM is an initiative that aims to provide 'premium economy' services at selected government hospitals. PETALING JAYA : The Malaysian Medical Association (MMA) has called on the health ministry to clarify the governance and transparency aspects of the newly announced Rakan KKM initiative as well as its potential impact. MMA president Dr Kalwinder Singh Khaira said one of the concerns over the initiative to offer 'premium economy' services at selected public hospitals was the risk of creating unequal access to care. 'There is growing apprehension that wealthier patients could be given faster access to services through this model within public facilities, effectively creating a two-tiered system. 'Such an outcome would undermine the principles of universal health coverage, which are built on fairness and equal access to care for all, regardless of socioeconomic status,' he said in a statement today. Another issue, he said, was regulatory oversight, noting that Rakan KKM was reportedly seeking licensing under the Private Healthcare Facilities and Services Act 1998. 'As this is a government initiative to be regulated by another arm of the government, public trust in its transparency, accountability, and compliance with healthcare standards must be assured. Kalwinder also flagged concerns about the strain on an already overstretched public healthcare workforce. 'With severe shortages of doctors, nurses, and allied health professionals, the association wants to know if Rakan KKM will involve the secondment of government staff, external hiring, or the transfer of existing personnel from public facilities,' he said. He added that the use of existing health ministry resources, such as infrastructure, equipment, and administrative support, must be addressed. Kalwinder stressed that any new initiative must not be profit-driven and remain focused on the welfare of the people. 'All reforms or partnerships in healthcare must be guided by the principles of equity, quality, transparency, and long-term sustainability,' he said. Health minister Dzulkefly Ahmad said last night that Rakan KKM was a government-backed initiative. In a post on X, Dzulkefly said Rakan KKM Sdn Bhd was 100%-owned by the MoF Inc, and that GLICs could take an equity stake in Rakan KKM.

Melaka to review childcare centre guidelines on baby swaddling
Melaka to review childcare centre guidelines on baby swaddling

Free Malaysia Today

time5 hours ago

  • Free Malaysia Today

Melaka to review childcare centre guidelines on baby swaddling

Melaka women, family and community development committee chairman Kalsom Noordin said the state government will discuss the matter with the health ministry. (Facebook pic) PETALING JAYA : Melaka authorities will review childcare guidelines at daycare centres, including whether babies older than four months should be swaddled, following the death of an infant at a centre last week from suffocation. Women, family and community development committee chairman Kalsom Noordin said the state government will discuss the matter with the health ministry to avoid a repeat of such incidents. 'We will discuss whether babies should be swaddled. I met a doctor just now who said swaddling was unnecessary. 'It is fine for babies under four months, but not encouraged for those older. Caregivers may be instructed on this matter after this,' Utusan Malaysia reported her as saying at a press conference at the Melaka assembly building today. Last week, a six-month-old boy died at a childcare centre in Padang Temu, Melaka, believed to be due to suffocation. The caregiver, who had been rotating duties with another staff member, had discovered the boy lying face-down with his face having turned blue. On child abuse cases in the state, Kalsom said the number had dropped sharply this year, with only one case recorded as of June, compared with five cases for the same period last year. 'Enforcement action had been taken against 36 unregistered childcare centres as of June, and RM68,000 in fines and compounds issued,' she said.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store