logo
South Africa's logistics sector set for transformation under new regulations

South Africa's logistics sector set for transformation under new regulations

Zawya23-05-2025

The final regulations for a block exemption for ports, rail and key feeder road corridors has been issued by South Africa's Minister of Trade, Industry and Competition, in consultation with the Competition Commission.
The regulations, which came into effect on 8 May 2025, provide a possible path for competitors, customers and suppliers involved in the rail, ports and road sector to collaborate to alleviate the challenges the sector is experiencing, without contravening the Competition Act 89 of 1998, as amended.
Objective of the regulations
The regulations aim to facilitate cooperation among market participants to address systemic inefficiencies and infrastructure challenges in South Africa's transport and logistics sectors. Specifically, the regulations aim to:
- reduce costs, improve services, and minimise losses caused by operational inefficiencies and infrastructure capacity shortages;
- prevent, mitigate and resolve bottlenecks and operational breakdowns in port and rail infrastructure;
- contribute to measures aimed at resolving the challenges in the sector; and
- ensure security of supply of goods transported through South Africa's ports, rails and key feeder road corridors.
Scope of the exemption
The regulations exempt specific categories of agreements and practices from the application of section 4 and 5(1) of the Competition Act, including the per se prohibitions on:
- fixing purchase price or trading conditions (excluding the fixing of a selling price) (Section 4(1)(b)(i))
- dividing markets by allocating customers, suppliers, territories or specific types of goods or services (Section 4(1)(b)(ii))
Categories of exempted conduct
The exemption enables coordination on ports and rail as well as key road corridors that feed this infrastructure.
Ports
- joint planning on port capacity and re-routing of cargo between ports
- traffic flow coordination into ports, including sharing operational data (eg, stack levels, weather disruptions)
- night operations coordination to ease peak-hour congestion
- joint repair, maintenance and development of port infrastructure and facilities
- collaboration on technical studies and assessments to enhance sector efficiency
- joint investment or funding initiatives for infrastructure upgrades
- shared use of independent consultants or technical experts
Users of a particular congested terminal in a port may, for example, exchange information on the volumes and delivery methods for cargo they export through that terminal. They might then agree to stagger their deliveries and shipments on a coordinated basis, in coordination with the terminal operator, to relieve congestion at peak times and create greater efficiencies in cargo exports from that terminal.
Rail
- joint management and upgrading of rail logistics infrastructure
- coordination on freight volumes to support dedicated rail services
- shared locomotive capacity
- reinstatement of services to strategic logistics nodes
- integrated rail-port planning to streamline cargo flow
- sector-focused collaborative studies
- joint infrastructure funding or investment
- shared procurement of independent advisory services
By way of example, a particular rail corridor may not be utilised to its full design capacity because of ongoing maintenance challenges, or a shortage of rolling stock, or both. In this case, some or all of the exporters who use that rail corridor to export dry bulk commodities, for example, can jointly agree to fund and procure any maintenance, infrastructure upgrades and/ or rolling stock required to ensure the line performs to design capacity.
This ensures that they each achieve their maximum export volumes. They might then agree with the network manager and rail transport provider that the funding is repaid over an agreed period of time by way of discounted tariffs from the rail transport provider.
Key feeder road corridors that interface with ports and rail (limited to roads that are key feeder corridors)
- joint maintenance and development of infrastructure
- sector-wide technical studies to improve efficiency
- shared investment in corridor upgrades
- procurement and sharing of technical experts or consultants
The relevant trucking industry bodies, for example, could agree jointly to commission and fund a technical study to reduce surface wear and congestion on a feeder road to a port.
Exclusions
The regulations specifically exclude the following conduct:
- any discussions/ agreements on fixing the selling price of goods/ services
- collusive tendering
- any agreement that forecloses third-party access to rail infrastructure (such as new entrants, small- and medium-sized enterprises and historically disadvantaged persons)
- any agreement or practice that conflicts with sector-specific legislation or policy
- resale price maintenance
- any merger transaction
Application and approval process
Firms seeking to rely on the exemption must submit a written request to the Commission for confirmation that the proposed conduct falls within the scope of the regulations. The Commission, after consultation with the relevant sector regulator and the Department of Trade, Industry and Competition, may:
- approve the exemption (with or without safeguards)
- decline the request if it falls outside the scope of the regulations
The Commission is required to issue a decision within 30 business days, extendable by an additional 30 business days. If no decision is issued within the prescribed period, the agreement or practice is deemed approved. The Commission retains discretion to determine the duration of each exemption.
Duration of the regulations
The regulations will remain in force for an initial period of 15 years, with the option of a further 15-year extension, although this does not necessarily mean that agreements contemplated under the regulations will be permitted to endure between firms for 15 years.
Upon withdrawal of the regulations, firms will be afforded a reasonable period to wind down any ongoing arrangements.
Providers of port and rail services as well as customers purchasing these services or other firms in the sector who wish to utilise the exemption, need to ensure that their proposed conduct falls within the scope of the regulations and is approved by the Commission prior to engaging in these collaborations in order to avoid any risk of prosecution by the Commission.
The exemption nevertheless creates a significant opportunity to rapidly improve and enhance efficiencies in the freight logistics sector. The various genres of exempt collaboration and cooperation present numerous opportunities for industry participants to be creative in their support of the logistics network for their greater good and that of the country as a whole.
All rights reserved. © 2022. Bizcommunity.com Provided by SyndiGate Media Inc. (Syndigate.info).

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

South Africa's fibre bottleneck needs a wireless breakthrough
South Africa's fibre bottleneck needs a wireless breakthrough

Zawya

time44 minutes ago

  • Zawya

South Africa's fibre bottleneck needs a wireless breakthrough

South Africa's digital economy is accelerating fast. With a projected 92% increase in national data centre capacity by 2030, rising from 501.1 MW to 962.4 MW, according to Africa Data Centres, businesses across sectors are demanding faster, more reliable internet connections than ever before. However, there's a bottleneck that continues to frustrate progress: fibre deployment. Justin Mackenzie MD of VO Connect The narrative is familiar to anyone in the telco resale space. Despite fibre being available 'in the ground' or even within a building, getting a business customer live can take anywhere from six to twelve weeks. Between municipal wayleaves, permissions from landlords, construction delays, and scheduling issues with third-party contractors, the process remains stubbornly slow, even in metro areas. That's a month or more of lost productivity for the customer, and a month where the reseller isn't billing. In an economy where every day of uptime matters, this has real financial consequences. For businesses requiring immediate connectivity, it's a momentum killer. And for executives in large ISPs or telco integrators, it's a scale inhibitor. The result? Slow fibre installs are costing business growth. Above promises of faster fibre, the answer to this problem could lie with sidestepping the delay altogether. A growing number of resellers are leveraging wireless-to-fibre hybrid connectivity models. Instead of waiting for fibre, they are switching on business customers using high capacity, licensed microwave links, getting them connected in hours or days, then migrating them seamlessly to fibre when it's ready and continuing to use the wireless as a reliable backup on a fully redundant solution. This isn't a workaround. It's a strategic rethink. This model should become standard practice across the channel, capable of activating businesses in as little as 24 hours or less. Wholesale ISPs with their own deployment teams can significantly impact the efficiency of connectivity deployments and execute installations more rapidly than those who rely on outsourced field staff, ensuring that the lead to cash cycle can take place in less than one week. Additionally, operating microwave connectivity on licensed spectrum may help avoid the congestion and reliability issues that are sometimes associated with lower-tier wireless internet service providers using unlicensed bands. Another area of innovation is in contractual arrangements. Instead of offering separate agreements for different stages of connectivity, some providers now offer a single contract that encompasses both immediate wireless activation and eventual fibre service. In this model, wireless connectivity serves as an initial activation layer and later functions as a backup once fibre is in place. This approach aims to streamline the customer experience and provide continuity of service. The failover benefit is significant. In an environment where resilience is increasingly critical, especially with the rise of hosted cloud services, video collaboration, and latency-sensitive apps, having a secondary path baked in offers real peace of mind and zero downtime. For businesses seeking connectivity, faster deployment timelines can have a significant impact. With the ability to sign agreements, arrange installations the next day, and achieve connectivity in the next week, businesses could scale their operations more rapidly and respond to business needs more efficiently. This accelerated process has the potential to streamline business growth and operational agility. It's a model that's resonating strongly with ISPs and telco integrators that service large enterprises, mines, campuses, and other midmarket or multi-site operations. Especially in areas where fibre access is technically available but practically delayed. And with the government pushing for expanded broadband access in underserved areas, the flexibility of this model provides an immediate tool for digital inclusion. While fibre remains the long-term goal, licensed microwave allows for a rapid start. Critically, this isn't a compromise on quality. Microwave has often been misunderstood, but on managed spectrum with the right equipment, it's high capacity, stable, and perfect for enterprise workloads. The market perception is finally catching up. For a country stuck between growing digital demands and the slow pace of infrastructure rollout, that kind of responsiveness may be exactly what South Africa's connectivity landscape needs. About VO Connect VO Connect is a national licensed telecommunications provider operating on licensed microwave spectrum with fibre integration. Founded in the early internet era, VO Connect specializes in enabling ISPs and telco resellers to deliver agile, reliable connectivity to enterprise clients. Known for rapid deployment, service excellence, and creative problem-solving, VO Connect helps resellers unlock billing faster and scale smarter.

Autoworld to invest AED 45mln in new Jafza facility to drive automotive growth across Middle East and Africa
Autoworld to invest AED 45mln in new Jafza facility to drive automotive growth across Middle East and Africa

Zawya

time2 hours ago

  • Zawya

Autoworld to invest AED 45mln in new Jafza facility to drive automotive growth across Middle East and Africa

Jafza facilitated nearly 48% of Dubai's automotive trade by value in 2024 Dubai, UAE: Autoworld International FZCO, a leading regional distributor for India's Bajaj Auto Ltd, is investing AED 45 million to develop a new logistics and distribution hub in the Jebel Ali Free Zone (Jafza). The facility will enhance Autoworld's ability to serve rapidly growing markets across Africa and the Middle East with affordable, fuel-efficient two- and three-wheelers. Spanning over 162,000 sq. ft, the facility will include an assembly plant for Bajaj motorcycles and three-wheelers, as well as storage and distribution space for spare parts, tyres, and lubricants. Scheduled for completion by 2026, the hub will also support the introduction of new product lines through partnerships with international manufacturers, strengthening the company's presence. The global two- and three-wheeler market is expanding quickly, particularly in emerging economies where urbanisation, e-commerce, and last-mile delivery needs are reshaping mobility needs. Industry analysts project Africa's two-wheeler market alone will grow at nearly 5% annually, driven by demand for affordable and fuel-efficient vehicles. 'This facility marks a major step forward in our growth strategy. Jafza's connectivity, infrastructure, and business-friendly environment have helped us serve high-growth markets across Africa and the GCC since 2008. With this investment, we are living up to our commitment to the region and to the Bajaj brand,' said Vishal Kumar Lakhani, Director at Autoworld. Abdulla Al Hashmi, Chief Operating Officer, Parks and Zones, DP World GCC, added, 'Autoworld's expansion underscores the strength of Jafza's integrated trade and logistics ecosystem which now connects 940 automotive companies from 88 countries. Last year alone, Jafza supported automotive trade valued at nearly AED 102 billion. We are proud to support long-term partners like Autoworld, who are helping connect world-class manufacturing with high-potential markets through Dubai.' The project is expected to create over 100 direct and indirect jobs, supporting Dubai's growing mobility and logistics ecosystem. It also strengthens the UAE's role as a central trade hub connecting manufacturers with global markets. The agreement was officially signed in the presence of Abdullah Bin Damithan, CEO and Managing Director of DP World GCC; Abdulla Al Hashmi, Chief Operating Officer, Parks & Zones at DP World GCC; Kumar Motiram Lakhani, Chairman of Autoworld; Monish Lakhani, Managing Director at Autoworld and Vishal Lakhani, Director at Autoworld. Autoworld has operated from Jafza for over 16 years, leveraging its world-class multimodal infrastructure to distribute Bajaj vehicles across 25+ countries. The move aligns with DP World's broader strategy to develop automotive trade in the region, including its plan to build the world's largest car market in Dubai, which is expected to double current annual sales of AED 6.8 billion. For DP World media enquiries, please contact: Jack Rigby Director Corporate Communications About Jebel Ali Free Zone (Jafza) Jafza is one of the world's leading free trade zones and is home to over 11,000 multinational companies. Jafza accounts for a significant FDI (Foreign Direct Investment) flow ‎into Dubai, sustaining the employment of more than 160,000 people in the United Arab Emirates. Strategically located at the crossroads of a region providing market access to over 3.5 billion people, Jebel Ali Port and Free Zone create an integrated multi-modal hub offering sea, air and land connectivity, complemented by extensive logistics facilities. ‎ Jafza is the leading business hub between Asia, Europe and Africa, connecting some of the fastest-growing manufacturing and consumer markets globally. With 40 years' experience, Jafza focuses on long-term customer relationships, building alliances with global investors and providing world-class infrastructure and support. In addition to quality-driven value-added services and incentives, Jafza is a business opportunity enabler, offering its customers easy and efficient access to substantial business opportunities in the region.

South Africa's Platinum Group Metals (PGMs) Sector in Focus as Isondo Precious Metals Chief Executive Officer (CEO) Joins African Mining Week (AMW)
South Africa's Platinum Group Metals (PGMs) Sector in Focus as Isondo Precious Metals Chief Executive Officer (CEO) Joins African Mining Week (AMW)

Zawya

time3 hours ago

  • Zawya

South Africa's Platinum Group Metals (PGMs) Sector in Focus as Isondo Precious Metals Chief Executive Officer (CEO) Joins African Mining Week (AMW)

Vinay Somera, CEO of South African fuel cell component manufacturer Isondo Precious Metals has joined the upcoming African Mining Week (AMW) 2025 – Africa's premier gathering for mining stakeholders – as a speaker. Somera will join a high-level panel, South Africa's Strategic Influence in the Global Platinum Group Metals (PGMs) Market, where he is expected to highlight efforts to maximize PGM production in South Africa. With the country supplying roughly 80% of the world's PGMs –essential for electric vehicle and clean energy development – AMW 2025 will unpack the country's strategic position in the global market, especially as the world enters its third consecutive year of supply deficits – expected to reach 848,000 ounces in 2025. African Mining Week serves as a premier platform for exploring the full spectrum of mining opportunities across Africa. The event is held alongside the African Energy Week: Invest in African Energies 2025 conference from October 1-3 in Cape Town. Sponsors, exhibitors and delegates can learn more by contacting sales@ At AMW 2025, Somera is set to showcase how Isondo Precious Metals is producing membranes for green hydrogen fuel cells and electrolyzers using South African-sourced PGMs. Under his leadership, the company is scaling its fuel cell manufacturing capabilities and working with international partners on infrastructure development and workforce training. Isondo Precious Metals recently acquired hydrogen reduction equipment from U.S.-based Camco Furnaces and two test stations from Greenlight Innovations, where it is also conducting workforce development initiatives. As such, AMW 2025 represents an ideal platform for Somera to provide an update on Isondo Precious Metals' strategy to deploy hydrogen refueling stations for hydrogen-powered buses and vehicles in South Africa. As Isondo Precious Metals advances its proof of concept for a new ammonia cracking generator, AMW 2025 offers a strategic platform for Somera to present the company's investment and expansion plans to a targeted audience of South African, regional and global investors and partners. Distributed by APO Group on behalf of Energy Capital&Power.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store