
Hyderabad Metropolitan Water Supply & Sewerage Board (HMWSSB) to modernise Manjeera with Rs 600 crore; urgent repairs begin, gates to be replaced in 45 days
The Hyderabad Metropolitan Water Supply & Sewerage Board (HMWSSB) is set to modernize the Manjeera drinking water infrastructure with a significant investment of Rs 600 crore
HYDERABAD: The Hyderabad Metropolitan Water Supply & Sewerage Board (HMWSSB) has initiated plans to modernise the Manjeera drinking water infrastructure with a substantial investment of Rs 600 crore.
Additionally, the board allocated Rs 3.52 crore for repair works that require immediate attention.
You Can Also Check:
Hyderabad AQI
|
Weather in Hyderabad
|
Bank Holidays in Hyderabad
|
Public Holidays in Hyderabad
Following an inspection of the Manjeera barrage facilities with senior water board officials, HMWSSB managing director Ashok Reddy confirmed the structural integrity of the barrage, dismissing reports of cracked pillars. He verified that the gates and ropes were functioning properly. However, he noted damage to the barrage's apron and immediately directed the responsible agency to undertake urgent repairs.
During the inspection of various barrage components, the MD instructed officials to maintain regular greasing, painting, and lighting schedules.
"The Manjeera Barrage, constructed 65 years ago, underwent annual maintenance of its gates. Officials determined that gates, ropes, and bearings needed replacement. In May last year, they finalised proposals worth Rs 3.52 crore, completed the tender process, and appointed an agency. While gate tightening is complete, other works continue. The State Dam Safety Authority submitted their assessment recently.
The gate replacement is expected to take 45 days, necessitating the release of the reservoir's water below MDL," said Ashok Reddy.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Scroll.in
28 minutes ago
- Scroll.in
GPSC MO recruitment 2025: Apply for 100 Medical Officer posts till July 9, details here
The Gujarat Public Service Commission (GPSC) has invited online applications from eligible candidates for the recruitment to Assistant Engineer (Electrical) posts, Class-2, Road and Building Department Class-2. Candidates can apply for the posts at till July 9, 2025. The preliminary exam will be conducted on October 12, 2025. Applicants will be shortlisted on the basis of the Preliminary exam (objective) and the interview round. The recruitment drive aims to fill a total of 100 MO vacancies. Applicants should be between the ages of 20 and 35 years as on July 9, 2025. The upper age limit is relaxed for reserved category candidates. More details in the notification below: Here's the official notice. Application Fee A fee of Rs 100 applies. Steps to apply for MO posts 2025


Scroll.in
an hour ago
- Scroll.in
JSSC JTMACCE registration 2025 begins for 1373 posts; apply till July 27
The Jharkhand Staff Selection Commission (JSSC) has commenced the registrations for the Jharkhand Trained Madhyamik Acharya Combined Competitive Examination 2025 or JTMACCE 2025. Eligible candidates can apply for the posts on the official website till July 27, 2025. The correction window will be open from July 23 to July 25, 2025. The recruitment drive aims to fill 1373 posts. Candidates can check the eligibility criteria, age limit, pay scale, and other details available in the notification below: Here's the official notification. Application Fee The candidates from SC/ ST categories are required to pay a fee of Rs 50, whereas Rs 100 applies to other category candidates. Steps to apply for JTMACCE posts 2025


New Indian Express
3 hours ago
- New Indian Express
Cracks in Kabini dam a cause for concern
More than seven dams in Mysuru and Chamarajanagar districts, mainly Kabini, Taraka, Nugu, Suvarnavathi, Chikkahole, Gundal and Uduthorehal dam, which are more than 40 years old, need immediate attention for better maintenance and structural safety. Experts rule out an immediate threat to the structure of Kabini dam. However, neglect or delay in filling up the cavity and cracks would weaken the reservoir structure, they caution. Irrigation department officials noticed leakage and deployed robots and underwater cameras to record the status of the structure, to report to the expert committee and Cauvery Neeravari Nigam Limited authorities, with details that the cracks and cavities are more than 50-cm deep. The engineers could not take up work immediately because of high turbidity in the water and poor visibility to fill up the cracks. The Dam Safety review team and Dam Safety panel, comprising former chairmen of the Central Water Commission, inspected the dams to study their status. Due to incessant rain, Chikkahole dam brimmed over but there was no relief for farmers as poor maintenance of sluice gates resulted in wastage of water. The inability to operate or fully close the sluice gate has wasted about 6 cusecs of water every day. The broken sluice gate of Taraka dam was replaced with a 25-tonne gate 19 years ago. If the government wants to utilise the allocated 284tmcft of water, it should replace all crest gates and strengthen the structure based on the expert committee report. The Cauvery Neeravari Nigam Limited has approved Rs 32.35 crore for filling up cavities and cracks in the Kabini dam. It has presented a proposal of Rs 88 crore to the Centre to strengthen the dam structures.