logo
Helicopter Services In Kedarnath Resumes After Rudraprayag Accident

Helicopter Services In Kedarnath Resumes After Rudraprayag Accident

India.com17-06-2025

DEHRADUN: Helicopter operations at the Kedarnath Dham in Uttarakhand have resumed, and the tourists have been told to plan their journey according to the weather, according to CEO of Uttarakhand Civil Aviation Development Authority. The official, Sonika said that flying in the region has not resumed but will resume once the weather improves.
"Heli operations have resumed today. As the weather is not favourable currently, flying has not resumed yet. But as soon as we get clear weather, flying will resume", Sonika told ANI. On Sunday monring, seven people, including the pilot of a helicopter died after it crashed near the forested area of Gaurikund in Uttarakhand's Rudraprayag district, the State Disaster Response Force (SDRF) said.
The Aryan Aviation Helicopter was flying to Guptkashi from the Kedarnath Dham when it crashed at 5:30 am on Sunday. The deceased were identified as Captain Rajbir Singh Chauhan (39), resident of Jaipur, Vikram Rawat (47) a Badrinath Kedarnath Temple Committee representative and resident of Rasi, Vinod Devi (66), resident of Uttar Pradesh, Trishti Singh (19), resident of Uttar Pradesh, Rajkumar Suresh Jaiswal (41), resident of Gujarat, Shraddha Rajkumar Jaiswal and Kashi (2), resident of Maharashtra.
Uttarakhand Chief Minister Pushkar Singh Dhami held a virtual high-level meeting with senior officials from the CM residence after the crash. The Aircraft Accident Investigation Bureau (AAIB) is investigating the crash, the Directorate General of Civil Aviation (DGCA) stated. The DGCA further said that, in light of the crash, the frequency of helicopter operations at Char Dham would be reduced as a precautionary measure. DGCA is also carrying out enhanced surveillance and operational reviews.
Chief Executive Officer of Uttarakhand Civil Aviation Department (UCADA), Sonika had stated that helicopter shuttle services in the area had been closed, given the ongoing relief operations and weather conditions in the valley.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Char Dham Yatra ban lifted on June 30 after suspension due to heavy rains. Check details
Char Dham Yatra ban lifted on June 30 after suspension due to heavy rains. Check details

Mint

timean hour ago

  • Mint

Char Dham Yatra ban lifted on June 30 after suspension due to heavy rains. Check details

Garhwal Divisional Commissioner Vinay Shankar Pandey has told ANI that the 24-hour ban on Char Dham Yatra is lifted on June 30 (Monday). He added that District Magistrates of all areas along the Yatra route have been instructed to stop vehicles in view of weather conditions in their respective districts, the report said. This comes after the Char Dham Yatra was suspended on Sunday following a heavy rain alert, as per officials. The suspension of the Yatra was followed by a cloudburst, triggering a massive landslide near Barkot, killing two workers and leaving seven others missing. Meanwhile, rain lashed several parts of Chamba town today. Earlier on June 29, the landslide-hit Barkot-Yamunotri road in Uttarakashi district was repaired and made smooth, as per officials. However, the search for the seven missing individuals continued. Uttarkashi District Magistrate Prashant Arya confirmed to ANI that repairs have been completed on the washout before Silai Band, and that efforts are ongoing to restore other damaged portions of the road. "The washout that happened due to a cloud burst before Silai Band on the Barkot-Yamunotri road of the district has been repaired and the road has been made smooth, while the work of making the other washout smooth is going on," Uttarkashi District Magistrate Prashant Arya told ANI. The District Magistrate also informed that the 33 KV power line in the area has been restored, and efforts are underway to repair the 11 KV line. Seven workers are still missing, for whom the search is being conducted by NDRF, SDRF, Police, and Revenue teams, he added. According to Uttarkashi Police, the landslide and cloudburst occurred around four kilometres ahead of Paligad on the Yamunotri National Highway, near Silai Band. A rescue operation is underway, involving personnel from police, fire services, the health department, and public works teams. The two bodies recovered have been identified as Kewal Bisht, a 43-year-old from Karmamohani, Rajapur District in Nepal, and Duje Lal, aged 55, from Pilibhit in Uttar Pradesh.

Char Dham Yatra: 24-hour ban lifted, weather conditions being monitored
Char Dham Yatra: 24-hour ban lifted, weather conditions being monitored

Business Standard

timean hour ago

  • Business Standard

Char Dham Yatra: 24-hour ban lifted, weather conditions being monitored

The 24-hour suspension of the Char Dham Yatra, issued on June 29 as a precautionary measure following heavy rain and adverse weather conditions in Uttarakhand, was lifted on Monday morning. Garhwal Division Commissioner Vinay Shankar Pandey told news agency ANI that district magistrates across the Char Dham route have been directed to monitor weather conditions and halt vehicles as required to ensure the safety of pilgrims. The yatra was temporarily halted after a cloudburst near Silai Band on the Barkot–Yamunotri road in Uttarkashi district caused severe damage to a hotel construction site and triggered a massive landslide. Two dead, seven missing after landslide The landslide near Barkot claimed the lives of two workers and left seven others missing. The deceased have been identified as 43-year-old Kewal Bisht from Karmamohani, Rajapur District in Nepal, and 55-year-old Duje Lal from Pilibhit, Uttar Pradesh. The incident occurred in the Baligarh area, severely disrupting the Yamunotri route. Rescue efforts are underway, with teams from the National Disaster Response Force (NDRF), State Disaster Response Force (SDRF), and local police engaged in search operations. Infrastructure repairs in progress Officials confirmed that repair work on the landslide-affected Barkot–Yamunotri road had been completed by June 29. Uttarkashi District Magistrate Prashant Arya said the washout near Silai Band was restored to ensure safe passage, and additional restoration efforts are in progress along other damaged stretches. The 33 KV power line in the affected area has also been restored, while work is underway to repair the 11 KV power line to fully stabilise the region's infrastructure.

Earthquake of magnitude 3.9 jolts Nepal
Earthquake of magnitude 3.9 jolts Nepal

Hindustan Times

timean hour ago

  • Hindustan Times

Earthquake of magnitude 3.9 jolts Nepal

An earthquake of 3.9 magnitude jolted Nepal on Sunday, a statement by the National Center for Seismology (NCS) said. Earlier on Sunday, another earthquake of magnitude 4.2 struck the region at a depth of 10km. (Representational) As per the NCS, the earthquake occurred at a shallow depth of 14km, making it susceptible to aftershocks. In a post on X, NCS said, 'EQ of M: 3.9, On: 30/06/2025 08:24:21 IST, Lat: 29.24 N, Long: 81.77 E, Depth: 14 Km, Location: Nepal.' Earlier on Sunday, another earthquake of magnitude 4.2 struck the region at a depth of 10km. In a post on X, the NCS said, 'EQ of M: 4.2, On: 29/06/2025 14:19:05 IST, Lat: 29.35 N, Long: 81.94 E, Depth: 10 Km, Location: Nepal.' Shallow earthquakes are more dangerous than deeper ones due to their greater energy release closer to the Earth's surface, causing stronger ground shaking and increased damage to structures and casualties, compared to deeper earthquakes, which lose energy as they travel to the surface. Nepal is highly earthquake-prone due to its location on a convergent boundary where the Indian and Eurasian tectonic plates collide. This collision generates immense pressure and stress, which is released as earthquakes. Nepal is also situated in a subduction zone where the Indian Plate is sliding beneath the Eurasian Plate, further increasing stress and strain. Nepal lies in the Himalayan region, a zone of intense seismic activity caused by the ongoing collision of the Indian and Eurasian tectonic plates. This collision results in the Indian plate pushing beneath the Eurasian plate in a process called subduction, creating immense pressure and strain on the Earth's crust. The subduction zone further amplifies the stress, making Nepal highly vulnerable to earthquakes. The collision also contributes to the uplift of the Himalayan mountains, adding to the overall seismic activity in the region. Nepal has a long history of earthquakes, including devastating events like the 2015 earthquake. Earlier on April 26, Nepali Prime Minister KP Sharma Oli stood below the replica of Dharahara Tower that fell down on April 25 2015 and observed a minute's silence for 8,969 victims who lost their lives in the devastating earthquake of 7.8 Richter scale. (ANI)

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store