
Bombay HC orders ‘mandatory' immersion of PoP idols up to 6 feet in artificial tanks across Maharashtra till March 2026
The high court was hearing a Public Interest Litigation (PIL) against the immersion of PoP idols in natural water sources, along with pleas filed by associations of Ganesh idol makers challenging the Central Pollution Control Board (CPCB) guidelines banning the immersion of such idols in natural water bodies.
A bench comprising Chief Justice Alok Aradhe and Justice Sandeep V Marne noted in the order that the interim arrangement will also be applicable to Navratri celebrations, the Maghi Ganesh festival, as well as all festivals involving idol immersions, until March 2026.
On Wednesday, the Maharashtra Government informed the high court about its July 21 policy guidelines for the immersion of PoP idols. Under the new policy, idols less than five feet will be mandatorily immersed in artificial water bodies. The government also said that those exceeding five feet in height may be permitted to be immersed in natural water bodies such as lakes, rivers, and the sea in case no alternate immersion facility is available.
'The policy of the state government can be said to be a step in the right direction. However, we cannot lose sight of the fact that over 7,000 PoP idols above 5 feet will be immersed in natural bodies. The court has to make an endeavour that the impact on immersion of idols on the environment is reduced to a bare minimum. We therefore direct that instead of 5 feet, idols up to 6 feet shall necessarily be immersed in artificial water bodies,' the bench said in the order.
New arrangements, logistical issues
After being informed that, according to the CPCB's expert committee, its guidelines were 'always advisory in nature,' the Bombay High Court on June 9 lifted the ban on the manufacture and sale of idols made of PoP. However, the court stated that the idols would not be immersed in natural bodies without obtaining permission from the HC and sought the state's policy on immersion.
On Wednesday, July 23, after perusing the state's guidelines, the court asked the Maharashtra Government and the Brihanmumbai Municipal Corporation (BMC) if it was possible to create artificial tanks for immersion of PoP idols up to 7 or 8 feet in height.
On Thursday, Senior Advocate Milind Sathe, while representing BMC, informed the court that while 85,306 Ganesh idols of less than 5 feet were immersed in artificial tanks in the city last year, with the new state mandate, suitable arrangements for immersing all 1,95,306 (1.10 lakh in addition) such idols in artificial ponds will have to be made this year.
He added that when 3,865 idols between 5 and 10 feet in height were immersed in natural water bodies last year, along with 3,998 above 10 feet made of PoP, there were logistical problems to ensure their immersion in artificial tanks.
When Advocate Ronita Bhattacharya-Bector for the PIL petitioner argued that even the large PoP idols shall not be immersed in natural water bodies, CJI Aradhe orally remarked, 'We are also not satisfied, but we cannot create artificial ponds ourselves. We cannot remain uncut from realities and do the idealistic thing… We are part of society. We are conscious. This is only an interim arrangement for this year'.
Maharashtra Advocate General Birendra Saraf said the government was 'committed to the environment', and would strictly enforce its guidelines.
The Bombay High Court then directed the implementation of the state's guidelines in 'letter and spirit' and mandatory immersion of PoP idols less than 6 feet in height in artificial bodies. The court also directed the Maharashtra Government to form an expert scientific committee on the reuse and recycling of PoP idols, which would also examine methods of faster dissolution of PoP idols in an eco-friendly manner.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Hindustan Times
a day ago
- Hindustan Times
Ganesha idols up to 6 feet must be immersed in artificial ponds, rules HC
MUMBAI: In a major step towards promoting environmentally responsible Ganeshotsav celebrations, the Bombay High Court on Thursday made it mandatory for all Ganesh idols—whether made of clay or Plaster of Paris (PoP)—measuring up to six feet in height to be immersed in artificial ponds provided by municipal corporations and local bodies across Maharashtra. Ganesha idols up to 6 feet must be immersed in artificial ponds, rules HC The order came a day after the state government informed the court that it had already made immersion in artificial tanks compulsory for idols up to five feet tall. Expanding the mandate, the bench of chief justice Alok Aradhe and justice Sandeep Marne observed, 'We have to make an endeavour that the impact of immersion of idols is bare minimum on the environment. Therefore, idols up to 6 feet should compulsorily be immersed in artificial tanks provided by local bodies.' The court also directed the state government to ensure its idol immersion policy is implemented 'in letter and spirit' and asked all civic authorities in Maharashtra to make appropriate arrangements to enforce the rule. The aforesaid guidelines of the state government for immersion of idols shall apply to all festivals wherein practice of immersion of idols is followed which are to be celebrated till March 2026. BMC flags scale of preparations, logistical challenges During the hearing, senior advocate Milind Sathe, representing the Brihanmumbai Municipal Corporation (BMC), told the court that 85,306 Ganesh idols measuring less than 5 feet were immersed in artificial ponds across Mumbai last year. With the new directive extending the rule to all idols up to six feet, the number of idols expected to be immersed in artificial tanks this year would rise to approximately 1,95,306—an increase of over 110,000. Sathe added that in 2023, 3,865 idols between 5 and 10 feet in height and 3,998 idols above 10 feet—many of them made of PoP—were immersed in natural water bodies. He pointed out that arranging for the immersion of larger idols in artificial ponds had presented significant logistical challenges in the past, and the new policy would require substantial infrastructural and administrative planning. Alongside the immersion mandate, the court asked the state to constitute an expert committee to explore eco-friendly methods to recycle PoP material. The committee will be expected to examine scientifically viable ways of dissolving PoP idols without harming the environment. The legal tussle over PoP continues The high court was hearing a public interest litigation (PIL) filed by Thane resident Rohit Joshi, seeking implementation of the Central Pollution Control Board (CPCB)'s guidelines prohibiting both the manufacture and immersion of PoP idols. The PIL raised concerns about pollution in rivers, lakes, and other natural water bodies caused by immersion practices. In contrast, Ganesha idol makers and artisans challenged the CPCB ban, arguing that it threatened their right to livelihood and impacted traditional practices. Taking a balanced view, the court allowed the continued manufacture and sale of PoP idols but barred their immersion in natural water bodies without specific court permission. 'It will be open to the petitioners and artisans to make PoP idols. However, the same shall not be immersed in natural water bodies without the leave of the court,' the bench clarified. The question of whether PoP idols should be banned from natural water bodies has been under judicial scrutiny since 2003, when the NGO Janhit Manch filed a PIL on environmental grounds. This prompted the CPCB to issue guidelines in 2009, which were updated in 2020 to ban immersion of PoP idols in natural sources while stopping short of prohibiting their production. A new scientific proposal adds nuance In April this year, the Rajiv Gandhi Science and Technology Commission (RGSTC)—a statutory body under the Maharashtra government—submitted a report recommending the conditional use of PoP idols. Commissioned by Cultural Affairs Minister Ashish Shelar, the report proposed that PoP idols painted with eco-friendly paints be allowed for immersion in large water bodies such as the sea and major rivers—provided these sites are far from drinking water sources and animal habitats. The report also recommended exploring 'retrievable immersion' methods that would allow PoP idols to be reused, thus minimising waste and damage to aquatic ecosystems.


Time of India
2 days ago
- Time of India
Maghi Ganesh idols immersion on Aug 2
Mumbai: After the Bombay High Court permitted the immersion of large PoP Ganpati idols in the sea, the remaining Maghi Ganeshas from Kandivli will be led for visarjan Saturday Aug 2. They have been in their pandals since Feb. tnn


Hindustan Times
2 days ago
- Hindustan Times
Ganga water quality remained within safe limits after Maha Kumbh 2025: Centre
The water quality of the Ganga river remained within the permissible limits for primary bathing standards both during and after the Maha Kumbh 2025 in Prayagraj, the Jal Shakti ministry said on Thursday. An aerial view of devotees taking a holy dip at Sangam during the Maha Kumbh Mela festival in Prayagraj district of Uttar Pradesh.(File) The monitoring conducted at eight key locations by the Central Pollution Control Board (CPCB), including Shringverpur Ghat, Sangam, and Deeha Ghat, showed that parameters like pH, Dissolved Oxygen (DO), Biochemical Oxygen Demand (BOD), and Faecal Coliform (FC) were well within the acceptable limits throughout religious festivities, the Minister of State for Jal Shakti Raj Bhushan Choudhary said in a written reply to a question in Lok Sabha on Thursday. The data was collected between January 12 and February 20, 2025, covering the Amrit Snan days and adjoining periods. The CPCB increased its monitoring from five to eight locations midway through the period to ensure broader coverage. According to the Ministry of Jal Shakti, the positive results reflect the effectiveness of the sanitation and wastewater management systems implemented during the Mela. The sanitation plan developed by the Prayagraj Mela Authority included temporary drainage systems spanning 250 km, the use of bioremediation ponds, and the installation of temporary sewage and faecal sludge treatment plants. After the event, these systems were dismantled and stored for future use, while disinfection measures ensured hygienic site closure, Choudhary said. The ministry also stated that under the Namami Gange Programme, 502 projects have been sanctioned with 323 completed, 150 under implementation, and 29 in the tendering stage. The Administrative Staff College of India (ASCI), which conducted a third-party appraisal, found that the programme has made substantial progress in reducing pollution, improving river flow, and engaging local communities, the MoS said.