
Indian Railways To Revamp 5 Nashik Stations Ahead Of Kumbh Mela, Know More
With a Rs 1,011 crore boost, five railway stations in Nashik are getting a big makeover to manage massive pilgrim rush during Simhastha Kumbh Mela.
Indian Railways has announced a major revamp of five key stations in Nashik district – Nashik Road, Devlali, Odha, Kasbe Sukene, and Kherwadi.
Approved by Railway Minister Ashwini Vaishnaw, the Rs 1,011 crore plan aims to improve passenger facilities and train handling capacity in time for the upcoming Simhastha Kumbh Mela.
As per TOI, during a review meeting, top railway officials including Minister of State Ravneet Singh Bittu, evaluated detailed proposals presented by Central Railway's senior team.
Which Stations Are Getting Upgraded?
Devlali Station
Devlali, located near Nashik Road station on the Mumbai side, will see the addition of three new platforms. Two of them will manage traffic from Mumbai and Nashik separately, while the third will cater to passing trains. The station will also get six new lines – including pit lines, sick lines, and stabilising lines – for better train maintenance and parking.
Nashik Road Station
With space limitations, the focus here is on adding two parking lines. Platform 1 will be extended to fit 24-coach trains, and Platform 4 will be upgraded to serve trains from both directions.
This station will become a key holding area during the mela, with five new stabilising lines and a third platform. During non-mela periods, Odha will be used for agricultural and goods transport.
Kasbe Sukene & Kherwadi Stations
Kasbe Sukene's platform will be extended to handle 22-coach trains, double the current capacity. Kherwadi will get two new platforms to accommodate 24-coach trains.
What Other Facilities Are Being Added?
Every station will be equipped with a special 'Mela Tower'—a hub for CCTV surveillance, announcements, control rooms, security, and large holding areas for pilgrims. Wider foot overbridges will also be built for safer and quicker movement.
When Will It All Be Ready?
About half of the work has already started. The rest will begin soon, with land acquisition likely from January 2026.
view comments
First Published:
Disclaimer: Comments reflect users' views, not News18's. Please keep discussions respectful and constructive. Abusive, defamatory, or illegal comments will be removed. News18 may disable any comment at its discretion. By posting, you agree to our Terms of Use and Privacy Policy.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
31 minutes ago
- Time of India
DTPC plans to begin tourism destination development projects in Ernakulam
Kochi: District tourism promotion council (DTPC) is planning to start work on four tourism destination projects soon. With the preliminary work on Ezhattumukham tourism destination development project already under way, projects for Kadambrayar tourism, beach tourism corridor and Koorumala tourism development are set to commence in the coming weeks. In Kadambrayar, tourism authorities plan to carry out development work on the existing walkway. "Apart from walkway development, we are also planning to launch water-related activities in the area, such as pedal boating and coracle," said a DTPC official. Detailed project report (DPR) is being prepared by Nirmithi Kendra. In Koorumala, DTPC plans to prepare a comprehensive development plan for the hill destination. Detailed land survey of the area, ahead of preparing DPR, was already finalized. "Tourism department is planning to implement the project in a public private partnership model. We will take further action after receiving the survey report," said the official. At Ezhattumukham eco-tourism destination, department already carried out some preliminary work, including toilet renovation. Major work, such as revamping other areas of the destination, will begin soon. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Brain tumor has left my son feeling miserable; please help! Donate For Health Donate Now Undo State govt granted administrative sanction for beach tourism corridor project and approved Rs 2.96 crore for the preliminary development work. First phase of the project is expected to be completed within a year. Munambam, Cherai and Kuzhupilly beaches will be developed under this project. MSID:: 122957290 413 |


Time of India
an hour ago
- Time of India
Unsafe paths, no security: Most Haridwar shrines mirror Mansa Devi flaws
Haridwar: A day after eight people died in a stampede at Mansa Devi temple, concerns have resurfaced over the safety of other major shrines in Haridwar, many of which struggle with overcrowding, narrow access points and insufficient crowd control. Tired of too many ads? go ad free now Survivors and locals said the tragedy highlighted long-standing failures in basic infrastructure and administrative oversight. Just 24 hours after the crush, TOI visited several prominent temples to assess their preparedness and found that critical safety issues persist at many locations. At Chandi Devi temple, perched atop Neel Parvat, steep steps and a narrow approach are clogged with makeshift shops, making movement difficult for pilgrims. There were no visible security personnel to manage the crowd. The Narayani Shila temple also struggles with poor crowd management, especially during Pitru Amavasya, when large gatherings are common. At Mansa Devi, crowd control remains ineffective. The bypass route, which took on more footfall after the closure of the back gate post-stampede, is in disrepair. Unauthorised vendors still occupy both the bypass and the pedestrian path leading to the shrine. Social activist JP Badoni told TOI, "The temple management committee has encroached on land meant for pilgrims by building shops and rooms. I've raised the issue multiple times, but the administration has failed to act against illegal permanent structures, nor have they removed temporary encroachments." He added that Haridwar Municipal Corporation should reclaim its land "illegally occupied by the ropeway company" and use it to improve access for pilgrims. Tired of too many ads? go ad free now In contrast, the Daksha temple in Kankhal appears better managed. It sees around 4,000 to 5,000 visitors daily, with numbers rising to over 10,000 during peak Shravan days. The temple was recently expanded. "Thanks to separate entry and exit gates and the regular presence of 10 to 15 policemen, which is ramped up to 30–40 during peak days, it is better managed than most other temples," said Mahesh Pareek, a regular visitor. In 2023, then-district magistrate Dheeraj Singh Garbyal had prepared a management plan for the temple, but it was never implemented, residents said. Encroachments are also rampant along the Har-ki-Pauri stretch, including Malviya Ghat, Subhash Ghat, Nai Ghat, Hathi Bridge, Upper Road and Bhimgoda Road. The absence of a designated zero zone in the area makes it difficult to regulate crowds effectively. Locals said key recommendations made by the Justice KK Commission after the 1997 Mauni Amavasya stampede are still pending. Social activist Ratanmani Dobhal told TOI, "Encroachments along the riverbanks near Har-ki-Pauri pose one of the biggest challenges. Entry and exit points must also be decongested." He said a comprehensive plan was needed to provide basic facilities to pilgrims at Har-ki-Pauri.


NDTV
2 hours ago
- NDTV
Want To Live And Work In Italy? A Digital Nomad Visa Can Help You Do That For Less Than Rs 12,000
If you have always wished to live in a country rich in architecture, history, and natural beauty, Italy is the place for you. Plus, it offers a Digital Nomad Visa that allows you to work and live there for a year. Officially launched in 2024, Italy's Digital Nomad Visa became fully operational in mid-2025. Here's everything you need to know about this visa. What Is Italy's Digital Nomad Visa? The Digital Nomad Visa offered by Italy allows you to work and live in the country for a whole year. It is a specific visa designed for non-EU/EEA citizens who qualify as 'highly skilled' remote workers. In other words, a digital nomad is a highly skilled worker who works remotely as a freelancer or for a company not based in Italy. Who Is Eligible? If you want to apply for Italy's Digital Nomad Visa, you must meet the following requirements: Since the visa is intended for citizens outside the European Union or European Economic Area, you must be a non-EU/EEA citizen. Applicants must be employed or self-employed, and the company must be outside of Italy. You must have at least 6 months of experience as a remote worker or digital nomad. The applicant must earn a minimum of €28,000 (approximately Rs 28,28,112) annually. A valid health insurance that covers your stay in Italy. Proof of accommodation is required - typically a 12-month lease registered with Italian tax authorities. A certificate showing no convictions in the past 5 years. How To Apply? Step 1: Collect all necessary paperwork, including your passport, application form, proof of income, remote work verification, criminal background check, proof of accommodation, and private health insurance. Step 2: Submit your application in person at the Italian consulate or embassy in your country of residence. Pay the visa fee, which is around 116 euros (Rs 11,702 approximately). Step 3: Attend the interview at the consulate or embassy. The processing time for the visa can range from 30 to 60 business days, although this may vary. Step 4: Once the visa is approved, the embassy will issue a Digital Nomad Visa. Things To Keep In Mind