
Grant boosts playground project
A new Catlins playground will have a significant cultural leaning, including verse from a well-known local poet.
Coastal community Kaka Point, which is nearing a rebuild of its "ageing" 30-year-old oceanside playground, received a major boost towards the $650,000 project recently, thanks to a $120,000 grant from the Otago Community Trust (OCT).
Project spokeswoman Anna Cross said she hoped work would begin on the new playground — which would contain poetry from former resident Hone Tūwhare and other "cultural" elements — in October.
The group had been "overwhelmed" by support for the project, from extensive local fundraising, the Clutha District Council, and grants including the recent OCT boost, Ms Cross said.
"We think the inclusion of Hone Tūwhare's poetry in the design, a significant Māori literary figure who made Kaka Point his home, is quite special and strengthens the cultural identity of the space.
"The playground design will also incorporate te ao Māori, including murals and informative signs sharing local history, as well as bilingual information panels highlighting native plants."
She said the project had arisen in 2020, as the town — home to many holiday cribs — began to see an increase in families choosing to live there permanently, and it hosted visitors year-round.
"The existing playground had become outdated and lacks modern, age-appropriate equipment. It wasn't reflecting the unique natural and cultural environment of Kaka Point, so we wanted to create a safe, engaging and inclusive play space for all."
The playground's centre point would be a lighthouse slide, reflecting nearby tourist attraction the Nuggets Lighthouse.
"We've worked closely with [designer] the Playground Centre to reflect and connect to our local environment by incorporating elements that define our area.
"We're hoping to create a vibrant, inclusive and culturally enriched space for locals and visitors alike."
The grant was one of a total $926,085 issued by OCT during its May distribution.
Other major recipients included the Mihiwaka-Kāpukataumahaka/Mt Cargill Habitat Restoration project ($40,000); He Waka Kōtuia Trust ($50,000); and $150,000 for the Millers Flat Community Reserve rejuvenation project.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles

RNZ News
9 hours ago
- RNZ News
Teenagers who gain work experience at school more likely to be employed by age 20
Gateway supported short-term, work-based placements while Trades Academies provided learning in trades-related. (File photo) Photo: Supplied/ UCOL Teenagers who gain trade and workplace experience at school are more likely to get a qualification and complete apprenticeships, a report finds. A Ministry of Education report said students who participated in the Gateway and Trades Academy programmes were also more likely to be in substantial employment by the age of 20 than other students with similar characteristics. The report considered the cohorts that participated in the programmes in 2014 and in 2018 and compared their education and employment outcomes with similar students who did not participate. It said Gateway was set up in 2001 and supported short-term, work-based placements while Trades Academies had provided learning in trades-related fields since 2010. "Both programmes increased the likelihood of students staying in education at age 17 and achieving a Level 2 or higher qualification by age 18. "These effects were consistent across genders and ethnic groups," the report said. "Men in both programmes were more likely to enrol in and complete apprenticeships, though rates remained lower for Māori and Pacific men. Women's apprenticeship participation remained low. "Both programmes reduced the likelihood of being in limited employment and increased students being in substantial employment, particularly for men. "Gateway had a stronger effect than Trades Academies in reducing limited employment for women, especially Māori and Pacific women." The report said 87-90 percent of Gateway and Trades Academy students had a level two qualification by the age of 18, compared with 78-79 percent for similar students who had done neither programme. It said 10-12 percent had completed an apprenticeship by age 24, compared with six percent for similar students. About a quarter of the group of similar students were in limited employment when they were 18, compared to 16-19 percent for the cohorts that had participated in the programmes. By age 20, 46-53 percent of the Trades Academy and Gateway cohorts were in substantial employment, compared with 35-38 percent for the group that had done neither programme. The report said the programmes appeared to have "a protective role for educational participation and achievement during the pandemic". Sign up for Ngā Pitopito Kōrero , a daily newsletter curated by our editors and delivered straight to your inbox every weekday.

RNZ News
a day ago
- RNZ News
Clutha council confident Mt Cooee Landfill won't run out of room
Mt Cooee Landfill. Photo: Facebook/Wasteco The Clutha District Council is confident a solution will be in place at a local landfill before it runs out of room. In February, the council reported the Mt Cooee Landfill area was critically close to capacity - it could need to stop accepting waste by August - and could cost an estimated $157,000 a month to ship waste elsewhere. Work has been underway to reduce, mitigate or eliminate that risk. That work included a 3D survey to figure out how much capacity was left and how long it would take to fill up and plans to build a general waste transfer pad so waste could be moved out of the district to another landfill until a decision was made about building a new landfill at Mt Cooee. The pad was expected to be finished by early September. "At this stage, council staff are working to define the detail designs required for the transfer station and then go out to tender for this urgent work," the council said. The council acknowledged it had not been smooth sailing as councillors expressed serious concern at the early advice. "Staff worked in the background on the risk and were successful in the various risk elimination measures," the council said. "Council is very confident that a solution will be in place before it is needed." The resource consent for the continued operation, expansion and progressive rehabilitation of the Mt Cooee Landfill was signed off by the Otago Regional Council in May. Work to enable an extension of the current landfill cell was nearly done, but existing cell had about 15 months of capacity left, the council said. The extension was expected to cost about $200,000. The total budget available for Mt Cooee upgrades was $7.1 million, which also included the transfer station and a possible resource centre. Building a new landfill cell was also a possible option. "Staff are intending to bring back to council a decision over the economics of operating Mt Cooee versus operating a transfer station as the long-term solution." Sign up for Ngā Pitopito Kōrero , a daily newsletter curated by our editors and delivered straight to your inbox every weekday.


NZ Herald
2 days ago
- NZ Herald
James Cook High changes to te reo Māori name: Auckland school's move ‘window dressing', says ex-student
A South Auckland school named after Captain James Cook is scrubbing any mention of the explorer in favour of a new te reo Māori name. James Cook High School in Manurewa says the cultural make-up of its community has changed since it opened in 1968, and now the school