BEL shares in focus after securing Rs 585-crore defence orders; June tally nears Rs 3,500 crore
Shares of Bharat Electronics Ltd (BEL) will be in focus on Monday after the state-owned defence electronics major announced fresh orders worth Rs 585 crore, adding to a string of recent wins that have pushed its total order inflow for June to nearly Rs 3,500 crore.
ADVERTISEMENT Also Read: 11 Nifty mid & smallcap stocks that can rally 40-90% over the next 12 months
In a stock exchange filing on Friday (June 20), BEL said the new orders include fire control systems, missile sighting systems, communication equipment, jammers, critical spares, and associated services.
This follows BEL's strategic partnership with Tata Electronics, announced on June 6. The two firms signed a memorandum of understanding (MoU) to jointly pursue opportunities in semiconductors and advanced electronics, including chip design, OSAT (Outsourced Semiconductor Assembly and Test), and fabrication. The move aligns with India's push for self-reliance in high-tech manufacturing.Earlier, on June 4, BEL had announced Rs 537 crore worth of new contracts for advanced communication systems, shipborne equipment, jammers, simulators, and other defence electronics.
That was followed by a major Rs 2,323 crore order from Mazagon Dock Shipbuilders and Garden Reach Shipbuilders for base and depot spares to support missile systems on Indian Navy vessels.
ADVERTISEMENT With these wins, BEL's total order inflow for June now stands at nearly Rs 3,500 crore, reinforcing its key role in India's defence and aerospace ecosystem.
ADVERTISEMENT According to Trendlyne, the average analyst target for BEL is Rs 405, suggesting a slight downside of about 1% from current levels. Of the 23 analysts tracking the stock, the consensus rating remains 'Buy'.On the technical front, the Relative Strength Index (RSI) is at 72.8—indicating overbought territory, which could signal a potential pullback. However, the stock continues to trade above its 20-day, 50-day, 100-day, and 200-day simple moving averages (SMAs), reflecting strong bullish momentum.
ADVERTISEMENT BEL shares have gained around 40% year-to-date and delivered an impressive return of 225% over the past two years. The company's current market capitalisation stands at approximately Rs 1.45 lakh crore.
Also Read: US strikes on Iran may rattle markets: Will Nifty, Sensex react to escalating geopolitical risk?
(Disclaimer: Recommendations, suggestions, views, and opinions given by the experts are their own. These do not represent the views of Economic Times)
(You can now subscribe to our ETMarkets WhatsApp channel)
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
38 minutes ago
- Time of India
GMRL seeks land buried under 1L tonnes of debris for Gurgaon metro project
Gurgaon: GMRL has sought the transfer of a 10-hectare parcel of land in Sector 10 from HSVP to set up a temporary casting yard for the new metro project. The land, however, is presently encroached upon and buried under nearly 1 lakh tonnes of construction and demolition (C&D) waste. According to GMRL, a casting yard is required for phase 2 of the metro corridor and needs to be ready by Oct to keep the timeline on track. The site, originally earmarked for an auto market, has been used as a dumping ground. C&D waste accumulated over the years now forms towering mounds across the land, with encroachers using parts of the plot. You Can Also Check: Gurgaon AQI | Weather in Gurgaon | Bank Holidays in Gurgaon | Public Holidays in Gurgaon "The site is essential for phase 2 of the project, and we need to begin preparatory work by Oct. There is a huge amount of C&D waste on the site which needs to be cleared quickly," a senior GMRL official said. The matter was also flagged in a recent high-level review meeting chaired by chief secretary Anurag Rastogi. In the meeting, GMDA, HSVP, MCG, HSIIDC, and police were directed to coordinate and ensure land-related bottlenecks were resolved promptly for the metro project to stay on track. HSVP had allotted 5.23 hectares of land in Sector 33 for setting up the casting yard for phase 1 of the metro corridor. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like 3.5, 4.5 BHK Homes starting at ₹4.89 Cr.* Hero Homes Learn More Undo Additional land was also provided by MCG for the same. Meanwhile, GMRL last week shortlisted the joint venture of Deutsche Bahn Engineering & Consulting (DBEC) and Hill International for the role of general consultant (GC) for the project. The GC will play a key role in overseeing planning, design vetting, construction supervision, and integration of the metro corridor. Approved in June 2023 at an estimated cost of Rs 5,452 crore, the 28.5km corridor from Millennium City Centre to Cyber City, with a 1.85 km spur to Dwarka Expressway, was supposed to be completed within four years. It was planned as a fully elevated line with 27 stations. Now, a 1.4 km spur line has been added to connect Sector 5 station with the Gurgaon railway station. With this, the metro project cost has been revised to Rs 10,266 crore and the due date pushed to 2029.


Time of India
an hour ago
- Time of India
Trichy corpn fixes rent for Panjapur truck terminal shops
Trichy: In its monthly meeting on Monday, the Trichy Corporation passed a resolution setting rent and deposit rates for shops at the Panjapur truck terminal, located on the Trichy-Madurai National Highway near the Integrated Bus Terminus (IBT). The local body has requested support from the Trichy city police to enforce the diversion of trucks and heavy vehicles currently parked on city highways and service roads to the new terminal. The council was informed that the terminal has 51 shops on the ground floor and 28 shops-cum-office spaces on the first floor. Rent has been fixed at Rs 132 per square foot, following government guidelines, while deposits range from Rs 4 lakh to Rs 10 lakh, depending on shop size (250 to 1,001 sq ft). The shops and amenities, including dormitories and sanitary complexes, will be leased out through a tender process. CPI councillor K Suresh emphasized the importance of police cooperation, stating, "If trucks parked on city roads are not regulated and diverted to the terminal, the project will fail." Councillors highlighted ongoing issues with truck parking on East Boulevard Road and near Gandhi Market, which cause significant traffic congestion due to poor enforcement. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Uber luxury living at Hyderabad's billionaire junction Sumadhura Group Learn More Undo Mayor Mu Anbalagan assured that police would be directed to streamline on-street truck parking and ensure vehicles are redirected to the Panjapur terminal. The meeting also approved 53 resolutions, including a 10% hike in the annual outsourcing cost for solid waste collection awarded to Pudukkottai-based S R United Infra Developers, a decision that drew criticism from several councillors. They also urged the corporation to consider wage revisions for sanitary workers. With the monsoon approaching, Congress councillor L Rex and MMK councillor Faiz Ahamed requested funds to maintain major drains in their respective wards. Truck Terminal, Panjapur Cost: Rs 110.9 crore Area: 13 acres Capacity: Two-axle trucks: 231 Three and four-axle trucks: 10 Five and six-axle trucks: 5 Total: 246 Shops: 79 Rent: Rs 132 per square foot Deposits: Rs 4-10 lakh


Time of India
an hour ago
- Time of India
Land along Ganga e-way, airport link can't be sold in Noida
Noida: There will be no land deals along a proposed route connecting under-construction Noida International Airport (NIA) with Ganga Expressway. Uttar Pradesh Expressways Industrial Development Authority (UPEIDA) officials have warned that "any violation could lead to strict administrative action". UPEIDA has finalised the alignment for a 74.3km-long greenfield link expressway that will directly connect NIA in Jewar with the ambitious Ganga Expressway. To curb speculative land deals and keep the project on schedule, UPEIDA has ordered a complete halt on the sale and purchase of notified land along the proposed route. Estimated at Rs 4,000 crore, the link expressway project aims to create a seamless high-speed corridor connecting the Ganga with Yamuna expressways. The Ganga Expressway, currently under construction from Meerut to Prayagraj, is one of the longest expressways in India, designed to transform travel across Uttar Pradesh. You Can Also Check: Noida AQI | Weather in Noida | Bank Holidays in Noida | Public Holidays in Noida Officials said GB Nagar administration is currently surveying the area and has received an official letter from UPEIDA to "halt all land transactions". District teams have begun identifying affected plots and any violation of the ban could lead to strict administrative action. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like 5 Books Warren Buffett Wants You to Read In 2025 Blinkist: Warren Buffett's Reading List Undo According to YEIDA officials, the project will significantly strengthen the airport's multimodal connectivity and support economic growth across western Uttar Pradesh and Greater Noida. "The new expressway is expected to transform regional connectivity, making travel to Agra, Delhi, Mumbai and Prayagraj faster and smoother, while driving industrial development in the surrounding areas," a senior YEIDA official said. This 120m wide expressway will start from the Siyana area in Bulandshahr and connect with the Yamuna Expressway near Film City in Sector 21. Initially planned at 83km, the route was realigned to avoid cutting through Yamuna City's developed sectors. The link expressway will pass through 56 villages, including eight in Gautam Budh Nagar and 48 in Bulandshahr district, covering areas like Khurja, Bulandshahr, Syana and Shikarpur tehsils. Key villages include Mehndipur Bangar, Bhaipur Brahmanan, Rabupura and Myana in Jewar tehsil, as well as Amanullahpur, Kapna, Bhagwanpur and others in Khurja tehsil and several villages in Bulandshahr and Syana tehsils. Once operational, the link expressway will provide direct connectivity from the Noida International Airport to the Delhi-Mumbai Expressway, Agra via Yamuna Expressway and further up to Prayagraj through the Ganga Expressway. This will not only ease traffic on existing routes but also enhance passenger and cargo movement, boosting the region's position as an industrial and logistics hub. The alignment has been designed to connect directly with Yamuna City's industrial sectors 28, 29, 32 and 33, making cargo transport to and from the airport more efficient. Authorities are also exploring a potential link to NH34 though no concrete plan has been prepared yet.