logo
‘Kashi first in nation to use 3D mapping for planning, devpt'

‘Kashi first in nation to use 3D mapping for planning, devpt'

Time of India25-04-2025
1
2
Varanasi: For the first time in the country, Varanasi will use a large-scale 3D model of the city for planning and executing the projects for development, security, and convenience.
The virtual model of the city Kashi will pave the way for sustainable development. The technology—3D Urban Spatial Digital Twin, will showcase the entire Kashi, including alleys, the Ganga, temples, and key locations of the city. This project, worth around Rs six crore, took nine months to complete.
The 3D Urban Spatial Digital Twin involves cutting-edge Geographical Information System (GIS) solutions, incorporating technologies like Light Detection and Ranging (LiDAR), 360-degree panoramic imagery, and creation of 3D model. Training in this technology is being imparted to the departments to enable its swift implementation.
Chief general manager of Varanasi Smart City D Vasudevan said that Kashi has become the first city in the country where the 3D GIS (360-degree mapping) of a 160 square kilometre area was conducted. The creation of the '3D Urban Spatial Digital Twin' of the Varanasi Municipal Corporation area was done using LiDAR technology. This involved over 23 hours of aerial surveys with low-flying aircraft, 1,838 line kilometres by vehicles on roads, and 1,055 line kilometres by backpack walkers in alleys. Drones were also used in this project. This modern technology will also showcase Kashi's heritage, allowing for new development plans.
by Taboola
by Taboola
Sponsored Links
Sponsored Links
Promoted Links
Promoted Links
You May Like
15 Most Beautiful Women Ever
Paperela
Undo
On the uses and benefits of the 3D Urban Spatial Digital Twin, Vasudevan said that it will keep the track of every inch of Kashi. The technology has a ground resolution of 4cm. It will provide 3D mapping of flood levels in the Ganga, indicating which areas and buildings will be affected, allowing the administration to prepare in advance. The 3D GIS includes precise measurements of alleys, roads, and buildings, enabling any department involved in development plans to assess the availability, utility, and feasibility of a location through this 3D mapping.
Project manager Santosh Kumar Tripathi said that the 3D mapping will also be used for real-time response. Cameras will be connected to key locations, allowing for crowd management, crime control, and traffic condition assessments. It will be integrated with existing GIS-based facilities of the VMC, Varanasi Development Authority, and other departments to enhance its utility. It will also aid in waste management, sewage, water management, and more. In case of fire, it will assist in rescue operations, planning for the development authority, preventing illegal construction, monitoring, and issuing NOCs. Additionally, it will provide information on plans related to the tehsil level.
The digital twin will also gather heat-map and thermographic real-time data for congestion management. This initiative enables the municipal corporation to accurately assess and manage property revenues, enhancing revenue collection and
urban infrastructure planning
.
Meanwhile, the Varanasi Development Authority (VDA) utilises the 3D model to update the Master Plan and issue building permits with greater accuracy and efficiency, promoting planned urban development.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

E-Khata bribe allegations shake Belagavi Council
E-Khata bribe allegations shake Belagavi Council

Time of India

time40 minutes ago

  • Time of India

E-Khata bribe allegations shake Belagavi Council

Belagavi: Accusations of widespread corruption in e-Khata registration at the Belagavi City Corporation (BCC) have sparked a heated debate. At Thursday's council meeting, MLAs and corporators alleged that revenue staff is demanding bribes ranging from Rs 10,000 to Rs 15,000 for property registrations. The claims fuelled public concern over transparency and accountability in the civic body. The process of e-Aasthi or e-Khata registration of properties under the classification of A, B, and C is underway in Belagavi city and across the district. An estimated 1.6 lakh properties need to be registered under e-Khata within the limits of Belagavi Corporation. The consolidation of documents required for e-property registration is facing many challenges as well. The common people are expressing strong dissatisfaction against this kind of exploitation, as the e-Khata registration will be processed only if the property owners come through intermediaries. A serious discussion took place in the BCC general meeting on the allegations of widespread corruption in e-Aasthi or e-Khata registration, arbitrary licensing of multi-storey buildings, and interference of middlemen in the documentation of properties. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like 3 & 4 BHK Starts ₹1.65 Cr in Kukatpally Honer Signatis Book Now Undo According to a person who works as a middleman in e-property registration, the properties with legal documents are fewer in the BCC limit. Now, efforts are underway to regularise such properties by creating records. Many public representatives, including MLAs, are supporting the regularisation of encroached properties. It has resulted in the presence of middlemen in the corporation. The middlemen have emerged to create legal documents. MLA Abhay Patil took the officials to task in the council meeting, saying that the officials apply the laws and rules only for poor and middle-class people. However, they do not ask anything of those who are illegally building 10 to 15-storey apartments in the city. He cautioned that if this kind of exploitation is not stopped, the MLAs themselves will have to start the e-Khata distribution campaign.

We've one: Karnataka counters AP's first quantum computer claim
We've one: Karnataka counters AP's first quantum computer claim

Time of India

time40 minutes ago

  • Time of India

We've one: Karnataka counters AP's first quantum computer claim

Bengaluru: A battle over quantum computing bragging rights has erupted between Andhra Pradesh and Karnataka after Andhra CM N Chandrababu Naidu claimed his state would deploy India's first indigenously built 8-qubit quantum computer" in Amaravati by Nov. Karnataka was quick to respond, asserting that the country's first operational quantum computer is already live in Bengaluru. In his rebuttal, Karnataka science and technology minister NS Boseraju said the 25-qubit quantum computer, named Indus and built by Bengaluru-based QpiAI, has been providing commercial services since April 2025. "For the record, India's first quantum computer—built indigenously by @QpiAI right here in Bengaluru—began commercial operations in April 2025," he said in a statement. "This 25-qubit quantum computer, named Indus, is already delivering real-world services in sectors such as healthcare, defence, advanced research, finance, and others," he added. You Can Also Check: Bengaluru AQI | Weather in Bengaluru | Bank Holidays in Bengaluru | Public Holidays in Bengaluru Naidu, in a July 24 post on X, had stated: "Our state is set to deploy India's first indigenously built 8-qubit quantum computer this Nov in Amaravati, with support from @QpiAI. This initiative, backed by the National Quantum Mission, aims to transform agriculture, water management, and healthcare. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Top 15 Prettiest Icons In The History The Noodle Box Undo I would like to congratulate QpiAI founder Mr Nagendra Nagarajan and express my gratitude to @nqmdst for their support of this project. " State leading in innovation, says tech minister Boseraju dismissed the notion that AP was leading the quantum race. "Karnataka is not only leading the nation in quantum innovation but also continues to strengthen its position as the epicentre of India's quantum future," he said. "While celebrating our progress, we must also cultivate a culture of considering facts and figures," he added. He also noted that India's first Quantum Research Park has been established at the Indian Institute of Science, Bengaluru, with the Karnataka cabinet approving Rs 48 crore for its second phase. "Several initiatives are underway to ensure the holistic growth of the quantum sector in Karnataka," he said.

Motilal redevpt on course as HC junks plea
Motilal redevpt on course as HC junks plea

Time of India

time40 minutes ago

  • Time of India

Motilal redevpt on course as HC junks plea

Mumbai: Bombay high court on Friday dismissed a review plea and paved the way for the redevelopment of 141 acres of MHADA land in Goregaon West, called Motilal Nagar. MHADA recently appointed Adani Realty as the consultant and Development Agency (CDA) for the project. It is touted as the city's largest housing project. Motilal Nagar Vikas Samiti, a residents' group filed the review petition seeking recall and quashing of the HC ruling dated March 6, 2025, by Chief Justice Alok Aradhe and Justice Bharati Dangre. The residents sought, as interim relief, a stay on MHADA and the developer awarded the contract from going ahead. You Can Also Check: Mumbai AQI | Weather in Mumbai | Bank Holidays in Mumbai | Public Holidays in Mumbai By its March judgment, HC allowed MHADA's 2021 application to ensure redevelopment gets done via private developers' bids and disposed of PIL filed in 2013, seeking action against rampant illegal construction on the land. The society's three main contentions were that firstly, as a society, they can and ought to be allowed to self-develop the premises under the govt policy. Secondly, the society of residents can, under rule 33 (5) (2) of Development Control and Promotion Regulations (DCPR), appoint a developer of their choice. Thirdly, any development undertaken by such society, with MHADA NOC, by appointing a developer, requires 51% consent of the members. Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like How NTUC Club Is Reinventing Golf in Singapore Golf Asia Read More Undo by Taboola by Taboola The housing authority, through its senior counsel, said no new points were being raised and that HC, after considering all aspects, recognised MHADA's rights under the law as the owner of the property to redevelop the premises through private developments by inviting bids. The counsel also contended that the society, in an affidavit, earlier said it wanted MHADA to do the development itself. MHADA said it floated bids and appointed Adani Realty as the CDA. The review plea before the same division bench challenged the appointment of the developer. HC said a reasoned order will be made available later. By Friday's development in court, Motilal Nagar I, II, III redevelopment projects can proceed, said a MHADA lawyer. In 2018, MHADA said the estimated project cost was Rs 21,000 crore. The developer will bear all costs, including costs for transit and rehabilitation of eligible tenements, shops, slum dwellers, other amenities. In 2013, Manjula Veeran and Tekchand Khanchandani filed two PILs in HC, seeking directions to MHADA and BMC to demolish "rampant unauthorised horizontal and vertical constructions" at Motilal Nagar I, II, and III, Goregaon West, MHADA Colony, Mumbai. The colony originally housed 400 tenants, mostly row houses.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store